Completed

Kubhephal, Aurangabad 431201 |Promoter: Bhaishree Ventures

6 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
6Buildings
41Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
6
Unit types
Hall No 1 and 2, Shop No 1 to 3, 2 BHK, 1 bhk, 3 BHK, 3 bhk, 3bhk, 3BHK41 units in all
Land area for this project
4,000 sq m (43,056 sq ft)
Permissible built-up area
2,004 sq m (21,575 sq ft)
Sanctioned built-up area
2,004 sq m (21,575 sq ft)
Recreational open space
600 sq m (6,458 sq ft)
Address
Gut No 330, Main Road, Near Zp SchoolPIN 431201
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86760, 75.49855
Vrundavan is at latitude 19.86760, longitude 75.49855.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
6 Aug 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000037716 Aug 201731 Dec 2018—Bhaishree VenturesProject page

6 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

41 units registered

Hall No 1 and 2 · 2 unitsShop No 1 to 3 · 3 units2 BHK · 6 units1 bhk · 12 units3 BHK · 2 units3 bhk · 6 units3bhk · 2 units3BHK · 8 units
BuildingTypeCarpet areaUnits
CommercialHall No 1 and 245.43 sq m · 489 sq ft2
CommercialShop No 1 to 314.39 sq m · 155 sq ft3
Rh No 17 to 222 BHK56.79 sq m · 611 sq ft6
Rh No 1 to 81 bhk34.39 sq m · 370 sq ft6
Rh No 1 to 83 BHK75.7 sq m · 815 sq ft2
Rh No 23 to 283 bhk66.51 sq m · 716 sq ft6
Rh No 29 to 361 bhk34.39 sq m · 370 sq ft6
Rh No 29 to 363bhk66.51 sq m · 716 sq ft2
Rh No 9 to 163BHK75.7 sq m · 815 sq ft8

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
CommercialClosed/Covered00000
CommercialOpen Space00000
Rh No 17 to 22Closed/Covered00000
Rh No 17 to 22Open Space00000
Rh No 1 to 8Closed/Covered00000
Rh No 1 to 8Open Space00000
Rh No 23 to 28Closed/Covered00000
Rh No 23 to 28Open Space00000
Show all 12 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Rh No 29 to 36Closed/Covered00000
Rh No 29 to 36Open Space00000
Rh No 9 to 16Closed/Covered00000
Rh No 9 to 16Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Commercial

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 17 to 22

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 1 to 8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 7 buildings and common areasShow fewer buildings and common areas

Rh No 23 to 28

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 29 to 36

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 9 to 16

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsONLY PAVED SURFACE IN TRIMIX CONCRETE NO FOOTPATHS100%
  • Water SupplyTHROUGH BOREWELL AND AUTHORITY WATER SUPPLY AVAILA100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHABERS DRAINGAE LINE NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingCOMPLETED100%
Show all 16 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Water-------Not applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING COMPLETED100%
  • Energy managemcntAS PER MANDATORY CONDITIONSNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceAS PER DRAWING BY ARCHITECT100%
  • Open ParkingTo be DoneNot applicable
  • Compound WallAS PER DRAWING OF CONSULTANTS100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 31 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2 (2)

Allotment letter (2)

Show all 55 documentsShow fewer documents

Allotment letter (2)

Registration certificate

Form 5 (4)

Form 4

Occupancy / completion certificate (2)

  • Occupancy / completion certificate18 Oct 2021ViewSource
  • Occupancy / completion certificate18 Oct 2021ViewSource

Other (5)

Layout plan

Building plan

Document library

  • Copy of the legal title reportsearch report 330.pdf · uploaded 27 Jul 2017View
  • Building Plan Approval (IOD)tp building permission 330.pdf · uploaded 27 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentbuilding permission 330.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT 330-.pdf · uploaded 28 Jul 2017View
  • Declaration in FORM BFIRM FORM 330 B.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesCertificate of Encumbrances.pdf · uploaded 28 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 330-.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterAgreement of Sale draft-Rera-330 Kumbhephal.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arc Certificate Gut no 330.pdf · uploaded 29 Jul 2017View
  • Certificates of CA (Form 5)ENG CERTIFICATE MADHURBAN-ilovepdf-compressed.pdf · uploaded 31 Mar 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)GUT NO 330 ENG CERTIFICATE-ilovepdf-compressed.pdf · uploaded 31 Mar 2018View
  • OtherFull page photo-ilovepdf-compressed.pdf · uploaded 10 Aug 2018View
  • Certificates of CA (Form 5)Form -5 Vrundanvan-2-ilovepdf-compressed.pdf · uploaded 15 Oct 2018View
  • OtherCompletion Certificate.pdf · uploaded 1 Jan 2019View
  • OtherCompletion Certificate R H 9 to 16 17 to 28.pdf · uploaded 18 Jan 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Kumbhephal Gut 330.pdf · uploaded 30 Sep 2019View
  • Certificates of CA (Form 5)K-330 Form5_compressed.pdf · uploaded 5 Oct 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)350 FORM 5.pdf · uploaded 29 Sep 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)vr f-5 18-19.pdf · uploaded 13 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)vr f-5 19-20.pdf · uploaded 13 Oct 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc1 vrundavan.pdf · uploaded 18 Oct 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc2vrindavan.pdf · uploaded 18 Oct 2021View

Promoter documents

  • Legal Title reportsearch report 330.pdf · uploaded 27 Jul 2017View
  • Declaration Form BFIRM FORM 330 B.pdf · uploaded 28 Jul 2017View

Technical documents

  • Layout ApprovalLAYOUT 330-.pdfView
  • Building Plan Approvaltp building permission 330.pdfView

Other legal documents

  • OtherFull page photo-ilovepdf-compressed.pdfView
  • OtherCompletion Certificate.pdfView
  • OtherCompletion Certificate R H 9 to 16 17 to 28.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kubhephal, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUTNO 330

As published on MahaRERA's project page

GUT NO 330

Boundaries

North
land of gut no 329
South
land of gut no 339
East
remaining land of gut no 330
West
remainning land of gut no 330

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Ausekar—
EngineerRajesh Wargantwar—
OtherAnil Malani—
OtherHimangi Mahesh Joshi—
OtherPs Mundada—

Source: MahaRERA project page. Contact details are not shown.