Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
9
Land area for this project
3,110 sq m (33,478 sq ft)
Permissible built-up area
2,136 sq m (22,987 sq ft)
Sanctioned built-up area
2,136 sq m (22,987 sq ft)
Address
Gut No 332, Main Road, KumbhefalPIN 431201
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Swapnaban Phase 2 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
2 Nov 2018
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000184572 Nov 201830 Dec 2022—Bhaishree Ventures LLPProject page

9 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rh No 17 To 231—
Rh No 1 To 81—
Rh No 24 To 291—
Rh No 30 To 371—
Rh No 38 To 451—
Rh No46 To 491—
Rh No 50 To 521—
Rh No 532—
Rh No 9 To 161—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Rh No 17 To 23Closed/Covered00000
Rh No 17 To 23Open Space00000
Rh No 1 To 8Closed/Covered00000
Rh No 1 To 8Open Space00000
Rh No 24 To 29Closed/Covered00000
Rh No 24 To 29Open Space00000
Rh No 30 To 37Closed/Covered00000
Rh No 30 To 37Open Space00000
Rh No 38 To 45Closed/Covered00000
Rh No 38 To 45Open Space00000
Rh No46 To 49Closed/Covered00000
Rh No46 To 49Open Space00000
Rh No 50 To 52Closed/Covered00000
Rh No 50 To 52Open Space00000
Rh No 53Closed/Covered00000
Rh No 53Open Space00000
Rh No 9 To 16Closed/Covered00000
Rh No 9 To 16Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rh No 17 To 23

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 1 To 8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 24 To 29

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 30 To 37

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 38 To 45

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No46 To 49

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 50 To 52

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 53

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 9 To 16

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Internal Roads & FootpathsWHITE TOP TRIMIX COMPLETED100%
  • Water SupplyNot applicable
  • Water SupplyCOMPLETED THROUGH BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCOMPLETED100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingCOMPLETED100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • COMPOUND WALL ENTRANCE GATECOMPLETED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

25 documents held by Deedo, 31 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration in FORM BAffidavit Form B K 332.pdf · uploaded 18 Oct 2018View
  • Copy of the legal title reportSearch Report K 332.pdf · uploaded 18 Oct 2018View
  • Details of encumbrancesCertificatee of Encumbarance K 332.pdf · uploaded 18 Oct 2018View
  • Commencement Certificates / NA Order for plotted developmentBuilding Permission -ilovepdf-compressed.pdf · uploaded 18 Oct 2018View
  • Copy of Layout Approval (in case of layout)Final Sanction Layout Plan .pdf · uploaded 18 Oct 2018View
  • Building Plan Approval (IOD)Building Permission -ilovepdf-compressed.pdf · uploaded 18 Oct 2018View
  • Proforma of Allotment letterAllotment Letter K 332.pdf · uploaded 18 Oct 2018View
  • Annual Audit Report of Statutory CA (Form 5)K-332 Form 5_compressed.pdf · uploaded 5 Oct 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect 332_compressed (1).pdf · uploaded 30 Nov 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 20 Aug 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 20 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)332 FORM 5.pdf · uploaded 29 Sep 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate SB2.pdf · uploaded 15 May 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate SB2.pdf · uploaded 15 May 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate k332 311221.pdf · uploaded 29 May 2021Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate K 332 SB II 030421.pdf · uploaded 29 May 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFIRST OCCUPANCY SB-2.pdf · uploaded 31 Jan 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSECOND OCCUPANCY SB-2-compressed.pdf · uploaded 31 Jan 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoccupancy approved plan sb-2_Compressed.pdf · uploaded 1 Feb 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPlan No-1_Compressed.pdf · uploaded 1 Feb 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPlan No-2_Compressed.pdf · uploaded 1 Feb 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD JUN-21 FULL_Compressed.pdf · uploaded 9 Feb 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD SEPT-21_Compressed.pdf · uploaded 9 Feb 2022View
  • Disclosure of sold/ booked inventorySOLD UNSOLD DEC-21_Compressed.pdf · uploaded 9 Feb 2022View
  • Architect’s Certificate on Completion of Project (Form 4)F-4 SB-2.pdf · uploaded 22 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)From5_2021_Swapnaban P-II.pdf · uploaded 12 Mar 2022View

Promoter documents

  • Declaration Form BAffidavit Form B K 332.pdf · uploaded 18 Oct 2018View
  • Legal Title reportSearch Report K 332.pdf · uploaded 18 Oct 2018View

Technical documents

  • Building Plan ApprovalBuilding Permission -ilovepdf-compressed.pdfView
  • Layout ApprovalFinal Sanction Layout Plan .pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter K 332.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kubhephal, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 332

As published on MahaRERA's project page

GUT NO 332

Boundaries

North
Part Of Gut No 332 Land
South
Gut No 334
East
24 Mtr Wide Dp Road
West
Layout Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Wadekar—
Chartered accountantP S Mundada—
EngineerRajesh Waragantwar—
OtherAnil Malani—
Real Estate AgentBalkrishna Dasrao Bhakre—
OtherHimangi Mahesh Joshi—
Registered real estate agentBalkrishnadasrao BhakreA51500021548

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology