Bhuvi Vrundavan - 1

Completed

Kubhephal, Aurangabad 431001 |Promoter: Bhuvi Landmarks LLP

Residential / Group HousingRERAP51500003772
6 Aug 2017Registered with MahaRERA
31 Mar 2018Promised completion
3Buildings
18Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Unit types
2 bhk, 1 BHK, 2 BHK, 3 BHK18 units in all
Land area for this project
2,000 sq m (21,528 sq ft)
Permissible built-up area
1,054 sq m (11,346 sq ft)
Sanctioned built-up area
854 sq m (9,193 sq ft)
Recreational open space
250 sq m (2,691 sq ft)
Address
Gut No 150, Khumbhephal, Aurangabad, Village Road, KumbhefalPIN 431001
Designated bank account
Kotak Mahindra Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.87994, 75.33247
Bhuvi Vrundavan - 1 is at latitude 19.87994, longitude 75.33247.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2018

The latest completion date on record passed 8 years and 7 months ago.

Registered
6 Aug 2017
Promised
31 Mar 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000037726 Aug 201731 Mar 2018—Bhuvi Landmarks LLPProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rh No 15 To 1824
Rh No 1 To 727
Rh No 8 To 1427

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

18 units registered

2 bhk · 6 units1 BHK · 10 units2 BHK · 1 unit3 BHK · 1 unit
BuildingTypeCarpet areaUnits
Rh No 15 To 182 bhk55.54 sq m · 598 sq ft4
Rh No 1 To 71 BHK33.24 sq m · 358 sq ft5
Rh No 1 To 72 BHK55.54 sq m · 598 sq ft1
Rh No 1 To 73 BHK75.34 sq m · 811 sq ft1
Rh No 8 To 141 BHK33.24 sq m · 358 sq ft5
Rh No 8 To 142 bhk55.52 sq m · 598 sq ft2

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Rh No 15 To 18Closed/Covered00000
Rh No 15 To 18Open Space00000
Rh No 1 To 7Closed/Covered00000
Rh No 1 To 7Open Space00000
Rh No 8 To 14Closed/Covered00000
Rh No 8 To 14Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rh No 15 To 18

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 1 To 7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Rh No 8 To 14

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsComplete100%
  • Water SupplyTHROUGH BOREWELL AND AMC WATER SUPPPLY WHEN AVAILA100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBERS DRAINGAE LINES SEPTIC TANK NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingONLY TREE PLANTATION100%
  • Street Lightingcomplete100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER MANDATORY CONDITIONS100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER DRAWING CONSULTANTS0%
  • Aggregate area of recreational Open SpaceAS PER DESIGN BY ARCHITECT0%
  • Open ParkingPavers Installation Done100%
  • COMPOUND WALLAS PER DRAWINGS OF CONSULTANTS100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 22 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportsearch report 150 .pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)building permission 150.pdf · uploaded 24 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)CA CERTIFICATES 150-ilovepdf-compressed.pdf · uploaded 28 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG CERTIFICATE-ilovepdf-compressed.pdf · uploaded 28 Jul 2017View
  • Declaration in FORM BFIRM FORM B.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesCertificate of Encumbrances.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)layout plan 150-.pdf · uploaded 28 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcollector permission 150.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterAgreement of Sale draft-Rera-150 Kumbhephal.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)K150 ENG CERTICATE.pdf · uploaded 31 Mar 2018View
  • Other20180528_131129_0001-ilovepdf-compressed.pdf · uploaded 28 May 2018View
  • Certificates of CA (Form 5)Form -5 Vrindavan 150-ilovepdf-compressed.pdf · uploaded 15 Oct 2018View
  • Certificates of CA (Form 5)Form 5 Kumbhephal Gut No 150.pdf · uploaded 30 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Kumbhephal Gut 150.pdf · uploaded 30 Sep 2019View
  • Engineers Certificate on Quality Assurance (Form 2A)Engineer's Certificate Vrundavan Phase-1_compressed (1).pdf · uploaded 30 Oct 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate Vrundavan Phase-1_compressed.pdf · uploaded 8 Nov 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentV-1Completion Certificate-compressed.pdf · uploaded 20 Jan 2022View

Promoter documents

  • Legal Title reportsearch report 150 .pdf · uploaded 24 Jul 2017View
  • Declaration Form BFIRM FORM B.pdf · uploaded 28 Jul 2017View

Other legal documents

  • Other20180528_131129_0001-ilovepdf-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kubhephal, Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut No 150

As published on MahaRERA's project page

Gut No 150, Khumbhephal, Aurangabad

Boundaries

North
Gut no 345
South
Part Land of Gut No 150
East
Part Land of Gut no 150
West
15 Meter Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Ausekar—
EngineerRajesh Wargantwar—
OtherAnil Malani—
OtherHimangi Mahesh Joshi—
OtherMilind Wadekar—
OtherPs Mundada—

Source: MahaRERA project page. Contact details are not shown.