Apurv Residency

Completed

Karmad, Aurangabad 431007 |Promoter: Ukardepatil Developers

Residential / Group HousingRERAP51500014665
20 Dec 2017Registered with MahaRERA
30 Dec 2019Promised completion
29 Dec 2021Revised completionPushed back 2 years
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Land area for this project
671 sq m (7,227 sq ft)
Permissible built-up area
982 sq m (10,567 sq ft)
Sanctioned built-up area
453 sq m (4,878 sq ft)
Address
Plot No 14 And 18, Karmad- Pimpri Road, KarmadPIN 431007
Designated bank account
Indusind Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86074, 75.54161
Apurv Residency is at latitude 19.86074, longitude 75.54161.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

The latest completion date on record passed 4 years and 10 months ago.

Registered
20 Dec 2017
Promised
30 Dec 2019
Revised
29 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001466520 Dec 201730 Dec 201929 Dec 2021Ukardepatil DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Row House2—
B Row Houses2—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A Row HouseClosed/Covered00000
A Row HouseOpen Space00001
B Row HousesClosed/Covered00000
B Row HousesOpen Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Row House

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B Row Houses

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsWork Completed100%
  • Water SupplyWork Completed100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Work Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingWork Completed100%
  • Street LightingWork Completed100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWork Completed100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWork Completed100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

32 documents held by Deedo, 35 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of the legal title reportsearch report.pdf · uploaded 13 Dec 2017View
  • Details of encumbrancesENCUMBRANCE.pdf · uploaded 13 Dec 2017View
  • Proforma of Allotment letterAGREEMENT TO SALE (1).pdf · uploaded 13 Dec 2017View
  • Declaration in FORM BFORM NO B .pdf · uploaded 13 Dec 2017View
  • Building Plan Approval (IOD)BUILDING PLAN .pdf · uploaded 13 Dec 2017View
  • Commencement Certificates / NA Order for plotted developmentCONSTRUCTION PERMISIION .pdf · uploaded 13 Dec 2017View
  • Copy of Layout Approval (in case of layout)PRADEEP L.pdf · uploaded 13 Dec 2017View
  • Building Plan Approval (IOD)Building plan.pdf · uploaded 29 Aug 2019View
  • Proforma of Allotment letteragreement for sale.pdf · uploaded 29 Aug 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentwork done.pdf · uploaded 29 Aug 2019View
  • Commencement Certificates / NA Order for plotted developmentbuilding permission.pdf · uploaded 30 Aug 2019View
  • Annual Audit Report of Statutory CA (Form 5)form 5.pdf · uploaded 18 Oct 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)eng certificate_compressed.pdf · uploaded 18 Oct 2019View
  • Annual Audit Report of Statutory CA (Form 5)form.pdf · uploaded 2 Dec 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5.pdf · uploaded 2 Dec 2019View
  • Proforma of Allotment letterAgreement-converted.pdf · uploaded 27 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM-5 F-Y 2019 -20.pdf · uploaded 24 Jun 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 F-Y 2020-21.pdf · uploaded 24 Jun 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLITION_compressed.pdf · uploaded 24 Jun 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM-5 F-Y 2018-19.pdf · uploaded 24 Jun 2023View
  • Declaration about Commencement CertificateFORMAT D (32).pdf · uploaded 19 Jul 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Final.pdf · uploaded 19 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 2019-20.pdf · uploaded 19 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 2020-21.pdf · uploaded 19 Jul 2023View
  • Disclosure of sold/ booked inventoryCIRCULAR 29.pdf · uploaded 19 Jul 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc plot 14.pdf · uploaded 19 Jul 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc.pdf · uploaded 19 Jul 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 19 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_compressed (1).pdf · uploaded 21 Jul 2023View

Promoter documents

  • Legal Title reportsearch report.pdf · uploaded 13 Dec 2017View
  • Declaration Form BFORM NO B .pdf · uploaded 13 Dec 2017View

Technical documents

  • Building Plan ApprovalBUILDING PLAN .pdfView
  • Layout ApprovalPRADEEP L.pdfView
  • Building Plan ApprovalBuilding plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement-converted.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Karmad, Aurangabad taluka

Survey, CTS, gat or plot numbers

141818PLOT NO 14

As published on MahaRERA's project page

PLOT NO 14 AND 18

Boundaries

North
9 Metre Road
South
Gut No 221
East
Plot No 22 To 29
West
9 Metre Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPradeep Mote—
EngineerPradeep V Mote—

Source: MahaRERA project page. Contact details are not shown.