Aarambh Commercial Spaces

Completed

Georai, Aurangabad 431007 |Promoter: Shantama Build Tec

13 Jul 2023Registered with MahaRERA
31 Dec 2026Promised completion
1Building
38Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
1
Unit types
Shop38 units in all
Land area for this project
1,076 sq m (11,585 sq ft)
Permissible built-up area
3,978 sq m (42,816 sq ft)
Sanctioned built-up area
945 sq m (10,167 sq ft)
Address
Gut no 3(p), Village Georai Tq and Dist Aurangabad, PATODA ROAD, PAITHAN ROADPIN 431007
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Aarambh Commercial Spaces is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
13 Jul 2023
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005195413 Jul 202331 Dec 2026—Shantama Build TecProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aarambh Commercial Spaces238

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

38 units registered

Shop · 38 units
TypeCarpet areaUnits
Shop2.4 sq m · 26 sq ft1
Shop6.72 sq m · 72 sq ft1
Shop7.01 sq m · 75 sq ft1
Shop7.02 sq m · 76 sq ft1
Shop8.99 sq m · 97 sq ft1
Shop14.39 sq m · 155 sq ft4
Shop16.56 sq m · 178 sq ft1
Shop17.99 sq m · 194 sq ft3
Shop18 sq m · 194 sq ft11
Shop18.47 sq m · 199 sq ft2
Shop18.9 sq m · 203 sq ft4
Shop23.1 sq m · 249 sq ft1
Shop23.1 sq m · 249 sq ft6
Shop27.9 sq m · 300 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000035

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aarambh Commercial Spaces

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure80%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsINTERNAL TAR OR CEMENT ROADS50%
  • Water SupplyFROM BOREWELL50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK DRAINAGE LINE0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingYES STREET LIGHTS FOR INTERNAL PROJECT0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingYES RAIN WATER HARVESTING AS PER NORMS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRICAL DP AS PER REQUIREMENT0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

37 documents held by Deedo, 38 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration about Commencement CertificateFormat D.pdf · uploaded 9 Jun 2023View
  • Declaration in FORM BFrom B.pdf · uploaded 9 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure.pdf · uploaded 9 Jun 2023View
  • Proforma of Allotment letterModal Form Of Allotment Letter_compressed.pdf · uploaded 9 Jun 2023View
  • Proforma of Agreement for saleATS Draft RERA.pdf · uploaded 9 Jun 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A New.pdf · uploaded 9 Jun 2023View
  • Deviation Report with respect to Allotment letterAllotment Letter.pdf · uploaded 9 Jun 2023View
  • Deviation Report with respect to model copy of AgreementAgreement To Sale.pdf · uploaded 9 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 9 Jun 2023View
  • Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 9 Jun 2023View
  • Commencement Certificates / NA Order for plotted developmentAmenity Building Permission.pdf · uploaded 9 Jun 2023View
  • a Details of encumbrances concerned to FinanceNO ENC LEGAL.pdf · uploaded 9 Jun 2023View
  • b Details of encumbrances concerned to LegalNO ENC LEGAL.pdf · uploaded 9 Jun 2023View
  • Copy of the legal title reportSearch report (2).pdf · uploaded 9 Jun 2023View
  • Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 12 Jun 2023View
  • a Details of encumbrances concerned to FinanceENC FIN Dec.pdf · uploaded 23 Jun 2023View
  • b Details of encumbrances concerned to LegalENC FIN Dec.pdf · uploaded 23 Jun 2023View
  • CERSAI detailsCERSAI.pdf · uploaded 23 Jun 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Aarambh Form-1 Sep-23.pdf · uploaded 24 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Aarambh Form-1 Dec-23.pdf · uploaded 24 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Aarambh Form-2 Sep-23.pdf · uploaded 24 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Aarambh Form-2 Dec-23.pdf · uploaded 24 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Aarambh Spaces Form-1 15-April-24.pdf · uploaded 29 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Aarambh Spaces Form-2 15-April-24.pdf · uploaded 29 May 2024View
  • Disclosure of sold/ booked inventoryAarambh Spaces Sold-31-March-24.pdf · uploaded 29 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form-1 June 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form-1 Sep 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form-1 Dec 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form-2 June 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form-2 Sep 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form-2 Dec 24.pdf · uploaded 22 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Aarambh Commercial Sapce Form-2A 23-24.pdf · uploaded 25 Feb 2025View

Promoter documents

  • Declaration Form BFrom B.pdf · uploaded 9 Jun 2023View
  • Legal Title reportSearch report (2).pdf · uploaded 9 Jun 2023View

Technical documents

  • Layout ApprovalPlan 1.pdfView
  • Building Plan ApprovalPlan 1.pdfView
  • Building Plan ApprovalPlan 2.pdfView

Proforma allotment letter

  • Proforma allotment letterModal Form Of Allotment Letter_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Georai, Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut no 3(p)

As published on MahaRERA's project page

Gut no 3(p), Village Georai Tq and Dist Aurangabad

Boundaries

North
30 Mtr Wide DP road
South
Remaining Land of Project Happy City
East
Remaning Land of Gut no 3 and 82
West
12 Mtr Wide Road of Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArch Amol Kshirsagar—
Chartered accountantBangad Parjane and Co—
EngineerArch Amol Kshirsagar—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology