Happy City Phase 2

Active

Georai Tanda, Aurangabad 431002 |Promoter: Shantama Build Tec

Residential / Group HousingRERAP51500053100
16 Oct 2023Registered with MahaRERA
31 Dec 2028Promised completion
5Buildings
43Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
5
Unit types
2BHK43 units in all
Land area for this project
2,300 sq m (24,757 sq ft)
Permissible built-up area
4,900 sq m (52,746 sq ft)
Sanctioned built-up area
2,600 sq m (27,989 sq ft)
Address
Plot No 2 Gut No 82 (Part)village Gevrai Tanda Andgut No 3 (Part) Village Gevrai Tq And Dist Chhatrapati Sambhajinagar, Georai And Georai Tanda, GeoraiPIN 431002
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Happy City Phase 2 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
16 Oct 2023
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005310016 Oct 202331 Dec 2028—Shantama Build TecProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
B 4 Type222
D 1 Type45
D 2 Type45
E Type45
F Type46

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

43 units registered

2BHK · 43 units
BuildingTypeCarpet areaUnits
B 4 Type2BHK40.59 sq m · 437 sq ft20
B 4 Type2BHK49.6 sq m · 534 sq ft2
D 1 Type2BHK51.68 sq m · 556 sq ft5
D 2 Type2BHK51.69 sq m · 556 sq ft5
E Type2BHK58.83 sq m · 633 sq ft5
F Type2BHK53.99 sq m · 581 sq ft6

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
B 4 TypeClosed/Covered00000
B 4 TypeOpen Space00006
D 1 TypeClosed/Covered00001
D 1 TypeOpen Space000020
D 2 TypeClosed/Covered00001
D 2 TypeOpen Space000020
E TypeClosed/Covered00001
E TypeOpen Space000020
F TypeClosed/Covered00001
F TypeOpen Space000030

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

B 4 Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

D 1 Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

D 2 Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

E Type

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

F Type

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsINTERNAL TAR OR CEMENT ROADS50%
  • Water SupplyFROM BORE WELL50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK AND DRAINAGE LINE0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingINTERNA;L PROJECT TREE PLANTATION0%
  • Street LightingSTREET LIGHTS FOR INTERNAL PROJECT50%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS60%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRICAL DP AS PER REQUIREMENT60%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

47 documents held by Deedo, 54 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration in FORM BForm B.pdf · uploaded 8 Jul 2023View
  • Deviation Report with respect to Allotment letterAllotment Letter.pdf · uploaded 8 Jul 2023View
  • Deviation Report with respect to model copy of AgreementAgreement To Sale.pdf · uploaded 8 Jul 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 8 Jul 2023View
  • Proforma of Allotment letterModel Form of Allotment Letter (1).pdf · uploaded 8 Jul 2023View
  • Proforma of Agreement for saleATS Draft RERA.pdf · uploaded 8 Jul 2023View
  • CERSAI detailsCERSAI Declaration.pdf · uploaded 8 Jul 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Anil Agrawal.pdf · uploaded 8 Jul 2023View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 8 Jul 2023View
  • a Details of encumbrances concerned to FinanceFIN ENC DEC LETTER.pdf · uploaded 8 Jul 2023View
  • a Details of encumbrances concerned to FinanceNo ENC Legal.pdf · uploaded 8 Jul 2023View
  • b Details of encumbrances concerned to LegalFIN ENC DEC LETTER.pdf · uploaded 8 Jul 2023View
  • b Details of encumbrances concerned to LegalNo ENC Legal.pdf · uploaded 8 Jul 2023View
  • Copy of Layout Approval (in case of layout)permission drowning 1.pdf · uploaded 8 Jul 2023View
  • Commencement Certificates / NA Order for plotted developmentCIDCO Commn Cert.pdf · uploaded 8 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentRH B4 Type.pdf · uploaded 8 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentRH D1 Type.pdf · uploaded 8 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentRH D2 Type.pdf · uploaded 8 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentRH E Type.pdf · uploaded 8 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentRH F Type.pdf · uploaded 8 Jul 2023View
  • Copy of the legal title reportsearch report.pdf · uploaded 28 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Happy City Phase-2 Form-2A 18-April-24.pdf · uploaded 29 May 2024View
  • Disclosure of sold/ booked inventoryHappy City Phase-2 Sold-31-March-24.pdf · uploaded 29 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)happy city p2 form1 DEc 2023_compressed.pdf · uploaded 30 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)happy city p2 form1 Mar 2024_compressed.pdf · uploaded 30 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)happy city p2 form2 Dec 2023.pdf · uploaded 30 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)happy city phase2 form2 March 2023.pdf · uploaded 30 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form-1 June 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form-1 Dec 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form-1 Sep 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form-2 June 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form-2 Sep 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form-2 Dec 24.pdf · uploaded 22 Feb 2025View
  • Form 1Form-1 March 25.pdf · uploaded 29 May 2026View
  • Form 2Form-2 March 25.pdf · uploaded 29 May 2026View
  • Disclosure of Sold and Booked InventorySold March 25.pdf · uploaded 29 May 2026View
  • Form 1Form-1 June 25.pdf · uploaded 29 May 2026View
  • Form 2Form-2 June 25.pdf · uploaded 29 May 2026View
  • Disclosure of Sold and Booked InventorySold June 25.pdf · uploaded 29 May 2026View
  • Form 1Form-1 Sep 25.pdf · uploaded 29 May 2026View
  • Form 2Form-2 Sep 25.pdf · uploaded 29 May 2026View
  • Disclosure of Sold and Booked InventorySold Sep 25.pdf · uploaded 29 May 2026View
  • Form 1Form-1 Dec 25.pdf · uploaded 29 May 2026View
  • Form 2Form-2 Dec 25.pdf · uploaded 29 May 2026View
  • Disclosure of Sold and Booked InventorySold Dec 25.pdf · uploaded 29 May 2026View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 8 Jul 2023View
  • Legal Title reportsearch report.pdf · uploaded 28 Jul 2023View

Technical documents

  • Layout Approvalpermission drowning 1.pdfView
  • Building Plan ApprovalRH B4 Type.pdfView
  • Building Plan ApprovalRH D1 Type.pdfView
  • Building Plan ApprovalRH D2 Type.pdfView
  • Building Plan ApprovalRH E Type.pdfView
  • Building Plan ApprovalRH F Type.pdfView

Proforma allotment letter

  • Proforma allotment letterModel Form of Allotment Letter (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Georai Tanda, Aurangabad taluka

Survey, CTS, gat or plot numbers

P L O T N O 2 G U T N O 8 2 (PART)

As published on MahaRERA's project page

PLOT NO 2 GUT NO 82 (PART)VILLAGE GEVRAI TANDA ANDGUT NO 3 (PART) VILLAGE GEVRAI TQ AND DIST CHHATRAPATI SAMBHAJINAGAR

Boundaries

North
Gut No 81 Gevrai Tanda
South
Gut No 3 Gevrai And Open Sapce
East
Future Part Construction
West
Part Of Same Group Housing Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAmol Kshirsagar—
Chartered accountantGOPAL JAJOO and ASSOCIATES—
Chartered accountantSudarshan Karwa—
EngineerAmol Kshirsagar—

Source: MahaRERA project page. Contact details are not shown.