Farola, Aurangabad 431105 |Promoter: Deepak Radheshyam Jhunjhunwala

Residential / Group HousingRERAP51500000992
25 Jul 2017Registered with MahaRERA
30 Mar 2025Promised completion
7Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
7
Land area for this project
7,120 sq m (76,636 sq ft)
Permissible built-up area
7,461 sq m (80,305 sq ft)
Sanctioned built-up area
7,461 sq m (80,305 sq ft)
Recreational open space
1,240 sq m (13,351 sq ft)
Planning authority
Town Planning and Valuation Department, Aurangabad
Address
PLOT NO. 1, Paithan Road, FarolaPIN 431105
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.72925, 75.29622
Harikunj is at latitude 19.72925, longitude 75.29622.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
25 Jul 2017
Promised
30 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000099225 Jul 201730 Mar 2025—Deepak Radheshyam JhunjhunwalaProject page

7 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building F9—
Building G9—
Row House Building A2—
Row House Building B2—
Row House Building C2—
Row House Building D2—
Row House Building E2—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building FClosed/Covered00004
Building FOpen Space000036
Building GClosed/Covered00004
Building GOpen Space000036
Row House Building AClosed/Covered00000
Row House Building AOpen Space1600016
Row House Building BClosed/Covered00000
Row House Building BOpen Space000016
Row House Building CClosed/Covered00000
Row House Building COpen Space00008
Row House Building DClosed/Covered00000
Row House Building DOpen Space000011
Row House Building EClosed/Covered00000
Row House Building EOpen Space000014

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building F

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor20%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building G

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House Building A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House Building B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House Building C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Row House Building D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House Building E

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsFILLING AND LEVELING50%
  • Water SupplyGRAM PANCHAYAT CONNECTION50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)TO BE DONE50%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting100 TREES PLANTED50%
  • Street LightingTO BE DONE50%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingTO BE DONE50%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationTO BE DONE50%
  • Aggregate area of recreational Open SpaceTO BE DONE50%
  • Open ParkingTO BE DONE50%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

62 documents held by Deedo, 72 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reporttitle search report harikunj.pdf · uploaded 10 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmenttp commencement certificate.pdf · uploaded 10 Jul 2017View
  • Proforma of Allotment letteragreemenmt to sale.pdf · uploaded 11 Jul 2017View
  • Details of encumbrancesECUMBRENCE SELF CERTIFICATE.pdf · uploaded 12 Jul 2017View
  • Building Plan Approval (IOD)1 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)2 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)3 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)4 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)5 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)6 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)7 SHEET OF BUILDING PERMISSION.pdf · uploaded 13 Jul 2017View
  • Copy of Layout Approval (in case of layout)DEMARCATED LAYOUT.pdf · uploaded 13 Jul 2017View
  • Declaration in FORM BFORM B OF RERA.pdf · uploaded 13 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate 18072017.pdf · uploaded 19 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 18072017.pdf · uploaded 19 Jul 2017View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form2A Q1 2019-20.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form2A Q2 2019-20.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form2A Q3 2019-20.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form2A Q4 2019-20.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Q1 2020-21.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Q2 2022-21.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Q3 2020-21.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Q4 2020-21.pdf · uploaded 15 Aug 2021View
  • Disclosure of sold/ booked inventoryDisclosure of sold booked unsold.pdf · uploaded 15 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 17-18.pdf · uploaded 15 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2018-19.pdf · uploaded 15 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20.pdf · uploaded 15 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 FY 2019-20.pdf · uploaded 13 Feb 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 FY 2020-21.pdf · uploaded 13 Feb 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 FY 2021-22.pdf · uploaded 13 Feb 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FY 2022-23.pdf · uploaded 13 Feb 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 Form 1 - Architect's Mar-20.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)2 Form 1 - Architect's Mar-21.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)3 Form 1 - Architect's Mar-22.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)4 Form 1 - Architect's Mar-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)5 Form 1 - Architect's Jun-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)6 Form 1 - Architect's Sep-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)7 Form 1 - Architect's Dec-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1 Form 2 - Engineer's Mar-20.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 Form 2 - Engineer's Mar-21.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)3 Form 2 - Engineer's Mar-22.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5 Form 2 - Engineer's Jun-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)5 Form 2 - Engineer's Jun-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)6 Form 2 - Engineer's Sep-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)7 Form 2 - Engineer's Dec-23.pdf · uploaded 10 Apr 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 01 DATE 01 MARCH 24.pdf · uploaded 29 Jan 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 01 DATE -01 JUN - 24.pdf · uploaded 29 Jan 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM - 01 DATE 01 - SEP -24.pdf · uploaded 29 Jan 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 01 01 DEC 24.pdf · uploaded 29 Jan 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM -02 DATE -10-04-24.pdf · uploaded 29 Jan 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM -02 DATE- 15 -07 -24.pdf · uploaded 29 Jan 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM -02 DATE-19-10-24.pdf · uploaded 29 Jan 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM -02 DATE -10-01-25.pdf · uploaded 29 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM - 2A DATE - 15-07-22.pdf · uploaded 29 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM - 2A -DATE - 10-06-23.pdf · uploaded 29 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM - 2A - DATE - 12-08-24.pdf · uploaded 29 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM F HARIKUNJ FY - 23-24.pdf · uploaded 4 Mar 2025View
  • Form 11 Form-1 Mar 25.pdf · uploaded 13 Dec 2025View
  • Form 22 Form-2 Mar 25.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked Inventory4 SOLD Mar 25.pdf · uploaded 13 Dec 2025View
  • Others5 Form-2A Mar 25.pdf · uploaded 13 Dec 2025View

Promoter documents

  • Legal Title reporttitle search report harikunj.pdf · uploaded 10 Jul 2017View
  • Declaration Form BFORM B OF RERA.pdf · uploaded 13 Jul 2017View

Technical documents

  • Building Plan Approval1 SHEET OF BUILDING PERMISSION.pdfView
  • Building Plan Approval2 SHEET OF BUILDING PERMISSION.pdfView
  • Building Plan Approval3 SHEET OF BUILDING PERMISSION.pdfView
  • Building Plan Approval4 SHEET OF BUILDING PERMISSION.pdfView
  • Building Plan Approval5 SHEET OF BUILDING PERMISSION.pdfView
  • Building Plan Approval6 SHEET OF BUILDING PERMISSION.pdfView
  • Building Plan Approval7 SHEET OF BUILDING PERMISSION.pdfView
  • Layout ApprovalDEMARCATED LAYOUT.pdfView

Proforma allotment letter

  • Proforma allotment letteragreemenmt to sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Farola, Paithan taluka

Survey, CTS, gat or plot numbers

1PLOT NO. 1

As published on MahaRERA's project page

PLOT NO. 1

Boundaries

North
105 Gut
South
12 Meter Road
East
9 Meter Road
West
56 Gut And Paithan Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGanesh Mharolkar—
Chartered accountantAmol Kala and Associates—
Chartered accountantMayur Bamb and Associates—
EngineerPradeep V Mote—
OtherRafiyoddin K Sayyed—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology