Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
549 sq m (5,911 sq ft)
Permissible built-up area
846 sq m (9,103 sq ft)
Sanctioned built-up area
846 sq m (9,103 sq ft)
Address
Plot No 6PIN 431105
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.58175, 73.98171
Sambhaji Residency is at latitude 18.58175, longitude 73.98171.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 May 2019

The latest completion date on record passed 7 years and 5 months ago.

Registered
31 Aug 2017
Promised
1 May 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001183131 Aug 20171 May 2019—Baburao Punjaram ThangeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sambhaji Residency6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sambhaji Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsCOMPLETED100%
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingCOMPLETED100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 29 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)Layout permission.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Ar certificate-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Er certificate-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)TP permission.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportadv sir-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterDraft-Agreement-for-Sale.pdf · uploaded 16 Aug 2017View
  • Details of encumbrancesNew Doc 2017-08-16 (8) (1).pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentDOC-20180413-WA0034.pdf · uploaded 13 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentNew Doc 2018-06-27.pdf · uploaded 27 Jun 2018View
  • Building Plan Approval (IOD)ep89.pdf · uploaded 27 Jun 2018View
  • Certificates of CA (Form 5)Certificates of CA (Form 5).pdf · uploaded 3 Oct 2018View
  • Proforma of Allotment letterSale deed new.pdf · uploaded 7 Feb 2019View
  • Proforma of Allotment letterDirect sale deed.pdf · uploaded 20 Feb 2019View
  • Proforma of Allotment letterSale Deed_Conveyance deed after agreement for sale.pdf · uploaded 20 Feb 2019View
  • Certificates of Architect (Form 4)Architech Form 4.pdf · uploaded 13 Jun 2019View
  • OtherOccupation Certificate.pdf · uploaded 13 Jun 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc.pdf · uploaded 14 Aug 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE.pdf · uploaded 14 Aug 2019View
  • Certificates of CA (Form 5)RERA AUDIT REPORT.pdf · uploaded 30 Sep 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Signed form .pdf · uploaded 1 Dec 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Declaration_for_From5_M21.pdf · uploaded 18 Jan 2022View

Promoter documents

  • Legal Title reportadv sir-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Declaration Form BFORM B.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalLayout permission.pdfView
  • Building Plan ApprovalTP permission.pdfView
  • Building Plan Approvalep89.pdfView

Other legal documents

  • OtherOccupation Certificate.pdfView

Proforma allotment letter

  • Proforma allotment letterSale Deed_Conveyance deed after agreement for sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bidkin, Paithan taluka

Survey, CTS, gat or plot numbers

6PLOTNO 6

As published on MahaRERA's project page

PLOT NO 6

Boundaries

North
Plot No 7
South
9 Mt Wide Road
East
9 Mt Wide Road
West
Gut No 53

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDilip Patil—
EngineerJaykumar Gaikwad—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology