Kings City
ActiveBalapur, Aurangabad 431117 |Promoter: Preetansh Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 3
- Land area for this project
- 3,617 sq m (38,929 sq ft)
- Permissible built-up area
- 11,556 sq m (1,24,392 sq ft)
- Sanctioned built-up area
- 11,556 sq m (1,24,392 sq ft)
- Planning authority
- CIDCO
- Address
- Plot No 111 Gut No 35 P, Beed By Pass Road, BalapurPIN 431117
- Designated bank account
- State Bank Of India
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2028
- Registered
- 15 Jun 2022
- Promised
- 31 Dec 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51500045884 | 15 Jun 2022 | 31 Dec 2028 | — | Preetansh Developers | Project page |
3 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A | 7 | — |
| B | 7 | — |
| C | 7 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| A | Closed/Covered | 0 | 0 | 0 | 0 | 62 |
| A | Open Space | 0 | 0 | 0 | 0 | 63 |
| B | Closed/Covered | 0 | 0 | 0 | 0 | 26 |
| B | Open Space | 0 | 0 | 0 | 0 | 63 |
| C | Closed/Covered | 0 | 0 | 0 | 0 | 62 |
| C | Open Space | 0 | 0 | 0 | 0 | 63 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
A
B
C
Common areas and amenities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
93 documents held by Deedo, 156 filings listed on MahaRERA's project page
Others
- Other8 Apr 2022ViewSource
- Other12 Apr 2022ViewSource
- Other21 May 2022ViewSource
- Other21 May 2022ViewSource
- Other31 May 2022ViewSource
- Other31 May 2022ViewSource
- Other31 May 2022ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other14 Jan 2023ViewSource
- Other3 Mar 2023ViewSource
- Other3 Mar 2023ViewSource
- Other26 Apr 2023ViewSource
- Other27 Apr 2023ViewSource
- Other24 Jul 2023ViewSource
- Other11 Oct 2023ViewSource
- Other20 Oct 2023ViewSource
- Other6 Jan 2024ViewSource
- Other6 Jan 2024ViewSource
- Other6 Jan 2024ViewSource
- Other6 Jan 2024ViewSource
- Other26 Feb 2024ViewSource
- Other26 Feb 2024ViewSource
- Other26 Feb 2024ViewSource
- Other26 Feb 2024ViewSource
- Other11 Apr 2024ViewSource
- Other28 Dec 2024ViewSource
- Other19 Apr 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other26 Jul 2025ViewSource
- Other16 Oct 2025ViewSource
- Other30 Oct 2025ViewSource
- Other21 Apr 2026ViewSource
- Other21 Apr 2026ViewSource
- Other27 Jun 2026ViewSource
- Other20 Jul 2026ViewSource
- Other20 Jul 2026ViewSource
- Other16 Sep 2026ViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Document library
- Building Plan Approval / NA Order for plotted developmentNA Order.PDF · uploaded 8 Apr 2022View
- Commencement Certificates / NA Order for plotted developmentFinal Permission Cidco.PDF · uploaded 8 Apr 2022View
- Details of encumbrancesEncumbrances.PDF · uploaded 12 Apr 2022View
- Proforma of Allotment letterAllotment and ATS Draft.pdf · uploaded 12 Apr 2022View
- Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 12 Apr 2022View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 17 May 2022View
- Declaration about Commencement CertificateDeclation.pdf · uploaded 21 May 2022View
- CERSAI detailsCERSAI_Search_Report_200237817462_For_Asset_Based_Search_21_05_2022_13_06_22_828.pdf · uploaded 21 May 2022View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 30 May 2022View
- Copy of the legal title reportLegal Title Report for RERA.PDF · uploaded 31 May 2022View
- Copy of the legal title reportLegal Title Report For RERA (2).PDF · uploaded 31 May 2022View
- Declaration in FORM BDeclaration_compressed.pdf · uploaded 31 May 2022View
- OtherAffidavit for quries from RERA.pdf · uploaded 4 Jun 2022View
- Other2598-2020.PDF · uploaded 9 Jun 2022View
- OtherApplication for Name Change.PDF · uploaded 9 Jun 2022View
- OtherIndex II.PDF · uploaded 9 Jun 2022View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Archetect _04-07-22.PDF · uploaded 14 Jan 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Archetect _ 04-10-22.PDF · uploaded 14 Jan 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Archetect _ 06-01-23.PDF · uploaded 14 Jan 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer_04-07-2022.PDF · uploaded 14 Jan 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer_04-10-2022.PDF · uploaded 14 Jan 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer_06-012023.PDF · uploaded 14 Jan 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2C Site Supervisor .pdf · uploaded 14 Jan 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2C Site Supervisor SEP22.pdf · uploaded 14 Jan 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2C Site Supervisor DEC 22.pdf · uploaded 14 Jan 2023View
- Disclosure of sold/ booked inventoryKings City Sold Unsold Status_30-09-2022.PDF · uploaded 3 Mar 2023View
- Disclosure of sold/ booked inventoryKings City Sold Unsold Status_31-12-2022.PDF · uploaded 3 Mar 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 26 Apr 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_March 23.PDF · uploaded 26 Apr 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.PDF · uploaded 26 Apr 2023View
- Disclosure of sold/ booked inventorySold Book Inventary_March 2023.PDF · uploaded 27 Apr 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 24 Jul 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 24 Jul 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 24 Jul 2023View
- Disclosure of sold/ booked inventorySold Unsold Disclosure.PDF · uploaded 24 Jul 2023View
- Building Plan Approval / NA Order for plotted development1OF4 (1).pdf · uploaded 25 Aug 2023View
- Building Plan Approval / NA Order for plotted development2OF4.pdf · uploaded 25 Aug 2023View
- Building Plan Approval / NA Order for plotted development3OF4.pdf · uploaded 25 Aug 2023View
- Building Plan Approval / NA Order for plotted development4OF4.pdf · uploaded 25 Aug 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Oct 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2023View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 11 Oct 2023View
- Disclosure of sold/ booked inventorySold-Booked Disclosure.PDF · uploaded 11 Oct 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate of Preetansh developers_0001.pdf · uploaded 20 Oct 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 King City.PDF · uploaded 6 Jan 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 King City.PDF · uploaded 6 Jan 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A King City.PDF · uploaded 6 Jan 2024View
- Disclosure of sold/ booked inventorySold Unsold King City.PDF · uploaded 6 Jan 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Site Supervisor.pdf · uploaded 26 Feb 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Site Supervisor_1.pdf · uploaded 26 Feb 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Site Supervisor_2.pdf · uploaded 26 Feb 2024View
- Disclosure of sold/ booked inventoryKings City Sold Unsold Status_30-06-2022.PDF · uploaded 26 Feb 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Apr 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Apr 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 11 Apr 2024View
- Disclosure of sold/ booked inventorySold Invemtory.PDF · uploaded 11 Apr 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 10 Jul 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 10 Jul 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 10 Jul 2024View
- Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 10 Jul 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 11 Oct 2024View
- Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 11 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024View
- Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 11 Oct 2024View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 11 Oct 2024View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form no-5 Kings City.pdf · uploaded 28 Dec 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 20 Jan 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 20 Jan 2025View
- Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 20 Jan 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 20 Jan 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 19 Apr 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 19 Apr 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 19 Apr 2025View
- Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 19 Apr 2025View
- Form 1Form 1 Jun 22.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 Jun 22.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC JUN 22.pdf · uploaded 26 Jul 2025View
- OthersForm 2A Jun 22.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 Sep 22.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 Sep 22.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC SEP22.pdf · uploaded 26 Jul 2025View
- OthersForm 2A Sep 22.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 Dec 22.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 Dec 22.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC DEC 22.pdf · uploaded 26 Jul 2025View
- OthersForm 2A Dec 22.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 Mar 23.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 Mar 23.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC MAR 23.pdf · uploaded 26 Jul 2025View
- OthersForm 2A Mar 23.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 JUN 23.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 JUN 23.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC JUN 23.pdf · uploaded 26 Jul 2025View
- OthersForm 2A JUN 23.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 SEP 23.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 SEP 23.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC SEP 23.pdf · uploaded 26 Jul 2025View
- OthersForm 2A SEP 23.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 Dec 23.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 Dec 23.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC DEC 23.pdf · uploaded 26 Jul 2025View
- OthersForm 2A Dec 23.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 mar 24.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 mar 24.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC MAR 24.pdf · uploaded 26 Jul 2025View
- OthersForm 2A mar 24.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 jun 24.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 jun 24.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC JUN 24.pdf · uploaded 26 Jul 2025View
- OthersForm 2A jun 24.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 SEP 24.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 SEP 24.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC SEP 24.pdf · uploaded 26 Jul 2025View
- OthersForm 2A SEP 24.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 DEC 24.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 DEC 24.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDISC DEC 24.pdf · uploaded 26 Jul 2025View
- OthersForm 2 A DEC 24.pdf · uploaded 26 Jul 2025View
- Form 1Form 1 mar 25.pdf · uploaded 26 Jul 2025View
- Form 2Form 2 mar 25.pdf · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventoryDIC MAR25.pdf · uploaded 26 Jul 2025View
- OthersForm 2A mar 25.pdf · uploaded 26 Jul 2025View
- Form 1Form 1.PDF · uploaded 26 Jul 2025View
- Form 2Form 2.PDF · uploaded 26 Jul 2025View
- Disclosure of Sold and Booked InventorySold Unsold.PDF · uploaded 26 Jul 2025View
- OthersForm 2 A.PDF · uploaded 26 Jul 2025View
- Withdrawal Update Form 1Form 1.PDF · uploaded 10 Oct 2025View
- Withdrawal Update Form 2Form 2.PDF · uploaded 10 Oct 2025View
- Withdrawal Update Form 1Form 1(1).PDF · uploaded 16 Oct 2025View
- Withdrawal Update Form 2Form 2.pdf · uploaded 16 Oct 2025View
- Form 5 (FY 2024-2025)Form-5 Preetansh Devlopers_0001.pdf · uploaded 30 Oct 2025View
- Withdrawal Update Form 1Form 1.pdf · uploaded 28 Mar 2026View
- Withdrawal Update Form 2Form 2.pdf · uploaded 28 Mar 2026View
- Withdrawal Update Form 1Form 1.pdf · uploaded 21 Apr 2026View
- Withdrawal Update Form 2Form 2.pdf · uploaded 21 Apr 2026View
- Form 2A (FY 2025-2026)Form 2A_Kings City_2025-2026.pdf · uploaded 27 Jun 2026View
- Withdrawal Update Form 1Form 1 (3).pdf · uploaded 20 Jul 2026View
- Withdrawal Update Form 2Form 2 (4).pdf · uploaded 20 Jul 2026View
- Form 5 (FY 2025-2026)Form 5 -Preetansh Dev Dt-20-09-2026_0001.pdf · uploaded 16 Sep 2026View
Promoter documents
Technical documents
Other legal documents
Proforma allotment letter
- Proforma allotment letterAllotment and ATS Draft.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Balapur, Aurangabad taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
PLOT NO 111 GUT NO 35 P
Boundaries
- North
- Remaining Land Of Gut No 26
- South
- 24 Mtr Wide Dp Road
- East
- Amenity Plot
- West
- Remaining Land Of Gut No 35
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Yogesh Zavar | — |
| Chartered accountant | CA Narendra Navandar | — |
| Chartered accountant | CA Sachin Lathi | — |
| Chartered accountant | Gopal S Malpani | — |
| Engineer | Deepak Mishra | — |
| Engineer | Ravikumar Gopaldas Kavrani | — |
| Engineer | Shriniwas Karanjikar | — |
| Other | Mall Infrastructures | — |
Source: MahaRERA project page. Contact details are not shown.