Skip to content
Deedo home
Menu

Kings City

Active

Balapur, Aurangabad 431117 |Promoter: Preetansh Developers

Residential / Group HousingRERAP51500045884
15 Jun 2022Registered with MahaRERA
31 Dec 2028Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
3
Land area for this project
3,617 sq m (38,929 sq ft)
Permissible built-up area
11,556 sq m (1,24,392 sq ft)
Sanctioned built-up area
11,556 sq m (1,24,392 sq ft)
Planning authority
CIDCO
Address
Plot No 111 Gut No 35 P, Beed By Pass Road, BalapurPIN 431117
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.84293, 75.38609
Kings City is at latitude 19.84293, longitude 75.38609.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
15 Jun 2022
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150004588415 Jun 202231 Dec 2028—Preetansh DevelopersProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A7—
B7—
C7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
AClosed/Covered000062
AOpen Space000063
BClosed/Covered000026
BOpen Space000063
CClosed/Covered000062
COpen Space000063

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCompleted100%
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingCompleted100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCompleted100%
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

93 documents held by Deedo, 156 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Building Plan Approval / NA Order for plotted developmentNA Order.PDF · uploaded 8 Apr 2022View
  • Commencement Certificates / NA Order for plotted developmentFinal Permission Cidco.PDF · uploaded 8 Apr 2022View
  • Details of encumbrancesEncumbrances.PDF · uploaded 12 Apr 2022View
  • Proforma of Allotment letterAllotment and ATS Draft.pdf · uploaded 12 Apr 2022View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 12 Apr 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 17 May 2022View
  • Declaration about Commencement CertificateDeclation.pdf · uploaded 21 May 2022View
  • CERSAI detailsCERSAI_Search_Report_200237817462_For_Asset_Based_Search_21_05_2022_13_06_22_828.pdf · uploaded 21 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 30 May 2022View
  • Copy of the legal title reportLegal Title Report for RERA.PDF · uploaded 31 May 2022View
  • Copy of the legal title reportLegal Title Report For RERA (2).PDF · uploaded 31 May 2022View
  • Declaration in FORM BDeclaration_compressed.pdf · uploaded 31 May 2022View
  • OtherAffidavit for quries from RERA.pdf · uploaded 4 Jun 2022View
  • Other2598-2020.PDF · uploaded 9 Jun 2022View
  • OtherApplication for Name Change.PDF · uploaded 9 Jun 2022View
  • OtherIndex II.PDF · uploaded 9 Jun 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Archetect _04-07-22.PDF · uploaded 14 Jan 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Archetect _ 04-10-22.PDF · uploaded 14 Jan 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Archetect _ 06-01-23.PDF · uploaded 14 Jan 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer_04-07-2022.PDF · uploaded 14 Jan 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer_04-10-2022.PDF · uploaded 14 Jan 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer_06-012023.PDF · uploaded 14 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2C Site Supervisor .pdf · uploaded 14 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2C Site Supervisor SEP22.pdf · uploaded 14 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2C Site Supervisor DEC 22.pdf · uploaded 14 Jan 2023View
  • Disclosure of sold/ booked inventoryKings City Sold Unsold Status_30-09-2022.PDF · uploaded 3 Mar 2023View
  • Disclosure of sold/ booked inventoryKings City Sold Unsold Status_31-12-2022.PDF · uploaded 3 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 26 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_March 23.PDF · uploaded 26 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.PDF · uploaded 26 Apr 2023View
  • Disclosure of sold/ booked inventorySold Book Inventary_March 2023.PDF · uploaded 27 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 24 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 24 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 24 Jul 2023View
  • Disclosure of sold/ booked inventorySold Unsold Disclosure.PDF · uploaded 24 Jul 2023View
  • Building Plan Approval / NA Order for plotted development1OF4 (1).pdf · uploaded 25 Aug 2023View
  • Building Plan Approval / NA Order for plotted development2OF4.pdf · uploaded 25 Aug 2023View
  • Building Plan Approval / NA Order for plotted development3OF4.pdf · uploaded 25 Aug 2023View
  • Building Plan Approval / NA Order for plotted development4OF4.pdf · uploaded 25 Aug 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 11 Oct 2023View
  • Disclosure of sold/ booked inventorySold-Booked Disclosure.PDF · uploaded 11 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate of Preetansh developers_0001.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 King City.PDF · uploaded 6 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 King City.PDF · uploaded 6 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A King City.PDF · uploaded 6 Jan 2024View
  • Disclosure of sold/ booked inventorySold Unsold King City.PDF · uploaded 6 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Site Supervisor.pdf · uploaded 26 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Site Supervisor_1.pdf · uploaded 26 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Site Supervisor_2.pdf · uploaded 26 Feb 2024View
  • Disclosure of sold/ booked inventoryKings City Sold Unsold Status_30-06-2022.PDF · uploaded 26 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.PDF · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventorySold Invemtory.PDF · uploaded 11 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 10 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 10 Jul 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 10 Jul 2024View
  • Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 10 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 11 Oct 2024View
  • Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 11 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024View
  • Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 11 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 11 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form no-5 Kings City.pdf · uploaded 28 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 20 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 20 Jan 2025View
  • Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 20 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 20 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 19 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 19 Apr 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 19 Apr 2025View
  • Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 19 Apr 2025View
  • Form 1Form 1 Jun 22.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 Jun 22.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC JUN 22.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A Jun 22.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 Sep 22.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 Sep 22.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC SEP22.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A Sep 22.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 Dec 22.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 Dec 22.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC DEC 22.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A Dec 22.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 Mar 23.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 Mar 23.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC MAR 23.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A Mar 23.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 JUN 23.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 JUN 23.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC JUN 23.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A JUN 23.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 SEP 23.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 SEP 23.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC SEP 23.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A SEP 23.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 Dec 23.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 Dec 23.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC DEC 23.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A Dec 23.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 mar 24.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 mar 24.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC MAR 24.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A mar 24.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 jun 24.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 jun 24.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC JUN 24.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A jun 24.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 SEP 24.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 SEP 24.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC SEP 24.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A SEP 24.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 DEC 24.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 DEC 24.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDISC DEC 24.pdf · uploaded 26 Jul 2025View
  • OthersForm 2 A DEC 24.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1 mar 25.pdf · uploaded 26 Jul 2025View
  • Form 2Form 2 mar 25.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventoryDIC MAR25.pdf · uploaded 26 Jul 2025View
  • OthersForm 2A mar 25.pdf · uploaded 26 Jul 2025View
  • Form 1Form 1.PDF · uploaded 26 Jul 2025View
  • Form 2Form 2.PDF · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked InventorySold Unsold.PDF · uploaded 26 Jul 2025View
  • OthersForm 2 A.PDF · uploaded 26 Jul 2025View
  • Withdrawal Update Form 1Form 1.PDF · uploaded 10 Oct 2025View
  • Withdrawal Update Form 2Form 2.PDF · uploaded 10 Oct 2025View
  • Withdrawal Update Form 1Form 1(1).PDF · uploaded 16 Oct 2025View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 16 Oct 2025View
  • Form 5 (FY 2024-2025)Form-5 Preetansh Devlopers_0001.pdf · uploaded 30 Oct 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 28 Mar 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 28 Mar 2026View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 21 Apr 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 21 Apr 2026View
  • Form 2A (FY 2025-2026)Form 2A_Kings City_2025-2026.pdf · uploaded 27 Jun 2026View
  • Withdrawal Update Form 1Form 1 (3).pdf · uploaded 20 Jul 2026View
  • Withdrawal Update Form 2Form 2 (4).pdf · uploaded 20 Jul 2026View
  • Form 5 (FY 2025-2026)Form 5 -Preetansh Dev Dt-20-09-2026_0001.pdf · uploaded 16 Sep 2026View

Promoter documents

  • Legal Title reportLegal Title Report for RERA.PDF · uploaded 31 May 2022View
  • Legal Title reportLegal Title Report For RERA (2).PDF · uploaded 31 May 2022View
  • Declaration Form BDeclaration_compressed.pdf · uploaded 31 May 2022View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalNA Order.PDFView
  • Building Plan Approval1OF4 (1).pdfView
  • Building Plan Approval2OF4.pdfView
  • Building Plan Approval3OF4.pdfView
  • Building Plan Approval4OF4.pdfView

Other legal documents

  • Other2598-2020.PDFView
  • OtherApplication for Name Change.PDFView
  • OtherIndex II.PDFView
  • OtherAffidavit for quries from RERA.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment and ATS Draft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Balapur, Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOT NO 111 GUT NO 35 P

As published on MahaRERA's project page

PLOT NO 111 GUT NO 35 P

Boundaries

North
Remaining Land Of Gut No 26
South
24 Mtr Wide Dp Road
East
Amenity Plot
West
Remaining Land Of Gut No 35

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYogesh Zavar—
Chartered accountantCA Narendra Navandar—
Chartered accountantCA Sachin Lathi—
Chartered accountantGopal S Malpani—
EngineerDeepak Mishra—
EngineerRavikumar Gopaldas Kavrani—
EngineerShriniwas Karanjikar—
OtherMall Infrastructures—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology