Pride Century Eden Garden

Certificate Signed

Aurangabad, Maharashtra 431005 |Promoter: Abad Estate Aop

Residential / Group HousingRERAP51500013235
21 Sep 2017Registered with MahaRERA
30 Sep 2022Promised completion
1Building
45Units registered23 booked (51%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
3BHK, 4BHK, Servant room45 units in all
Address
C.T.S. NO. 14813/118, PANNALAL NAGAR, Pannalal Nagar, Pannalal NagarPIN 431005
Designated bank account
171
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.87127, 75.33343
Pride Century Eden Garden is at latitude 19.87127, longitude 75.33343.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2022

The latest completion date on record passed 4 years and 1 month ago.

Registered
21 Sep 2017
Promised
30 Sep 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001323521 Sep 201730 Sep 202230 Sep 2022Abad Estate AopProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pride Century Building Eden Garden1245

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

23 of 45 units booked (51%), as the promoter reported to MahaRERA

3BHK · 18 units4BHK · 18 unitsServant room · 9 units
TypeCarpet areaUnitsBooked
3BHK94.08 sq m · 1,013 sq ft188
4BHK124.56 sq m · 1,341 sq ft1811
Servant room9.43 sq m · 102 sq ft94

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 131 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD.pdf · uploaded 15 Sep 2017Source

Legal

  • Legal Title reportSEARCH REPORT LAHARI MOHAN D VAKIL 2017.pdf · uploaded 15 Sep 2017Source
  • Declaration Form BFORM B BUILDING B.pdf · uploaded 15 Sep 2017Source

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 15 Sep 2017Source
  • 1 Copy of the legal title reportSEARCH REPORT LAHARI MOHAN D VAKIL 2017.pdf · uploaded 15 Sep 2017Source
  • 1 Details of encumbrancesDECLARATION OF NON ENCUBRANCANCE.pdf · uploaded 15 Sep 2017Source
  • 1 Copy of Layout Approval (in case of layout)toch map.pdf · uploaded 15 Sep 2017Source
Show all 132 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval (IOD)1-7.pdf · uploaded 15 Sep 2017Source
  • 2 Building Plan Approval (IOD)4-7.pdf · uploaded 15 Sep 2017Source
  • 3 Building Plan Approval (IOD)5-7.pdf · uploaded 15 Sep 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 15 Sep 2017Source
  • 1 Declaration in FORM BFORM B BUILDING B.pdf · uploaded 15 Sep 2017Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE EDEN GARDEN.pdf · uploaded 15 Sep 2017Source
  • 1 Proforma of Allotment letterFINAL AGREEMENT TO SALE.pdf · uploaded 15 Sep 2017Source
  • 2 Certificates of CA (Form 3)PRIDE - Eden Garden.pdf · uploaded 3 Feb 2018Source
  • 4 Building Plan Approval (IOD)1-8.pdf · uploaded 20 Mar 2018Source
  • 5 Building Plan Approval (IOD)2-8.pdf · uploaded 20 Mar 2018Source
  • 6 Building Plan Approval (IOD)3-8.pdf · uploaded 20 Mar 2018Source
  • 7 Building Plan Approval (IOD)4-8.pdf · uploaded 20 Mar 2018Source
  • 8 Building Plan Approval (IOD)5-8.pdf · uploaded 20 Mar 2018Source
  • 9 Building Plan Approval (IOD)6-8.pdf · uploaded 20 Mar 2018Source
  • 10 Building Plan Approval (IOD)7-8.pdf · uploaded 20 Mar 2018Source
  • 11 Building Plan Approval (IOD)8-8.pdf · uploaded 20 Mar 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentREVISED CC (1).pdf · uploaded 20 Mar 2018Source
  • 3 Certificates of CA (Form 3)EDN GARDEN.pdf · uploaded 30 Aug 2018Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects certificate the eden Garden.pdf · uploaded 12 Dec 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUNE EDEN GARDEN ARCHITECT CER.pdf · uploaded 12 Dec 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEP EDEN GARDEN ARCHITECT CER.pdf · uploaded 12 Dec 2018Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE EDEN GARDEN ENGINEERS CER.pdf · uploaded 12 Dec 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEP EDEN GARDEN ENGINEERS CER.pdf · uploaded 12 Dec 2018Source
  • 4 Certificates of CA (Form 3)CA Certificate of EDEN GARDEN MARCH.pdf · uploaded 12 Dec 2018Source
  • 5 Certificates of CA (Form 3)CA Certificate of EDEN GARDEN jun.pdf · uploaded 12 Dec 2018Source
  • 6 Certificates of CA (Form 3)CA Certificate of EDEN GARDEN OCT.pdf · uploaded 12 Dec 2018Source
  • 1 Certificates of CA (Form 5)Eden Garden Form 5.pdf · uploaded 19 Jan 2019Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)B ARCHITECT CER.pdf · uploaded 23 Feb 2019Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)B EDEN GARDEN ENGG CER.pdf · uploaded 23 Feb 2019Source
  • 7 Certificates of CA (Form 3)Eden Garden 25-1-2019.pdf · uploaded 25 Feb 2019Source
  • 1 Form 2AEDEN GARDEN.pdf · uploaded 11 Apr 2019Source
  • 2 Form 2AENG CER EDEN GARDEN MAR-19.pdf · uploaded 27 Apr 2019Source
  • 2 Details of encumbrancesINDEX 2 CENTURY.pdf · uploaded 26 Jun 2019Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)EDEN architect certificate date 02-04-19.pdf · uploaded 30 Jul 2019Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers certificate The Eden Garden.pdf · uploaded 30 Jul 2019Source
  • 8 Certificates of CA (Form 3)Eden Garden dt 31-03-2019.pdf · uploaded 4 Aug 2019Source
  • 3 Form 2AJune'19 Form 2A Eden Garden Pride Century.pdf · uploaded 13 Aug 2019Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Jun'19 Architect B-Eden garden.pdf · uploaded 10 Sep 2019Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)jun'19 Engineer Cert B-Eden Garden.pdf · uploaded 10 Sep 2019Source
  • 9 Certificates of CA (Form 3)eden garden CA certificate.pdf · uploaded 21 Sep 2019Source
  • 4 Form 2ASept'19 Form 2A Eden Garden Pride Century.pdf · uploaded 16 Oct 2019Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate Eden garden B.pdf · uploaded 5 Dec 2019Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sep'19 Engineers Certificate The Eden Garden.pdf · uploaded 5 Dec 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 The Eden Garden.pdf · uploaded 11 Dec 2019Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)The Eden Garden Architect's Certificate 02-01-2020.pdf · uploaded 4 Mar 2020Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)The Eden Garden Engineer's Certificate1 Date 02-01-2020.pdf · uploaded 4 Mar 2020Source
  • 10 Certificates of CA (Form 3)Eden g 30-9-19.pdf · uploaded 4 Mar 2020Source
  • 11 Certificates of CA (Form 3)Eden g 31-12-19.pdf · uploaded 4 Mar 2020Source
  • 5 Form 2AFORM 2A MAR'20 EDEN GARDEN B.pdf · uploaded 6 Jun 2020Source
  • 12 Building Plan Approval (IOD)1-8.pdf · uploaded 19 Jun 2020Source
  • 13 Building Plan Approval (IOD)2-8.pdf · uploaded 19 Jun 2020Source
  • 14 Building Plan Approval (IOD)3-8.pdf · uploaded 19 Jun 2020Source
  • 15 Building Plan Approval (IOD)4-8.pdf · uploaded 19 Jun 2020Source
  • 16 Building Plan Approval (IOD)5-8.pdf · uploaded 19 Jun 2020Source
  • 17 Building Plan Approval (IOD)6-8.pdf · uploaded 19 Jun 2020Source
  • 3 Commencement Certificates / NA Order for plotted developmentcommoncement certificate 07-2020.pdf · uploaded 19 Jun 2020Source
  • 18 Building Plan Approval (IOD)7-8.pdf · uploaded 20 Jun 2020Source
  • 19 Building Plan Approval (IOD)8-8.pdf · uploaded 20 Jun 2020Source
  • 6 Form 2Aform 2A-Eden Garden June'20.pdf · uploaded 31 Jul 2020Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate -the Eden Garden-Mar'20.pdf · uploaded 25 Aug 2020Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate -The Eden Garden-Mar'20.pdf · uploaded 25 Aug 2020Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JULY-20 ARCHITECT CERTIFICATE B-THE EDEN GARDEN.pdf · uploaded 16 Oct 2020Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Jun'20- Engineers Certificate-The Eden Garden.pdf · uploaded 16 Oct 2020Source
  • 7 Form 2AForm 2A -The Eden Garden-Sept'20.pdf · uploaded 3 Nov 2020Source
  • 8 Form 2AForm 2A -The Eden Garden-Dec'20.pdf · uploaded 23 Jan 2021Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Sep'20- B Building.pdf · uploaded 28 Jan 2021Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sep'20- Engineers Certificate-The Eden Garden.pdf · uploaded 28 Jan 2021Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Dec'20- B Building.pdf · uploaded 3 Mar 2021Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Dec'20 Engineers Certificate The Eden Garden.pdf · uploaded 3 Mar 2021Source
  • 9 Form 2AForm-2A Pride Century Eden Gardan June 21.pdf · uploaded 24 Jul 2021Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy certificate.pdf · uploaded 5 Aug 2021Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development1-7.pdf · uploaded 5 Aug 2021Source
  • 3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development2-7.pdf · uploaded 5 Aug 2021Source
  • 4 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development3-7.pdf · uploaded 5 Aug 2021Source
  • 5 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development4-7.pdf · uploaded 5 Aug 2021Source
  • 6 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development5-7.pdf · uploaded 5 Aug 2021Source
  • 7 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development6-7.pdf · uploaded 5 Aug 2021Source
  • 8 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development7-7.pdf · uploaded 5 Aug 2021Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Eden March 21.pdf · uploaded 15 Aug 2021Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Eden Jun 21.pdf · uploaded 15 Aug 2021Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate-The Eden Garden Mar'21.pdf · uploaded 15 Aug 2021Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate-The Eden Garden Jun'21.pdf · uploaded 15 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A-Mar'21 The Eden Garden.pdf · uploaded 15 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 Pride Century The Eden Garden Building.pdf · uploaded 15 Aug 2021Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Society Pan Card.pdf · uploaded 15 Aug 2021Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)RERA - Declaration for Legal Entity -Pride Century The Eden Garden.pdf · uploaded 9 Sep 2021Source
  • 3 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Correction Deed DOD AGG5-2914-2020 03-07-2020 (1)_1.pdf · uploaded 9 Sep 2021Source
  • 4 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Correction Deed DOD AGG5-2914-2020 03-07-2020 (1)_2.pdf · uploaded 9 Sep 2021Source
  • 5 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Correction Deed DOD AGG5-2914-2020 03-07-2020 (1)_3.pdf · uploaded 9 Sep 2021Source
  • 6 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Correction Deed DOD AGG5-2914-2020 03-07-2020 (1)_4.pdf · uploaded 9 Sep 2021Source
  • 7 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Correction Deed DOD AGG5-2914-2020 03-07-2020 (1)_5.pdf · uploaded 9 Sep 2021Source
  • 8 Status of Formation of Legal Entity (Society/Co Op etc.)Pride Century Correction Deed DOD AGG5-2914-2020 03-07-2020 (1)_6.pdf · uploaded 9 Sep 2021Source
  • 12 Certificates of CA (Form 3)MAR20- FORM 3 - CA Cert EDEN GARDEN.pdf · uploaded 29 Sep 2021Source
  • 13 Certificates of CA (Form 3)SEP20- FORM 3 - CA Cert EDEN GARDEN.pdf · uploaded 29 Sep 2021Source
  • 14 Certificates of CA (Form 3)MAR21- FORM 3 - CA Cert EDEN GARDEN.pdf · uploaded 29 Sep 2021Source
  • 15 Certificates of CA (Form 3)DEC20- FORM 3 - CA Cert EDEN GARDEN.pdf · uploaded 1 Oct 2021Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of SoldUnsold Inventory-Pride Century B Type-Jun'21.pdf · uploaded 19 Nov 2021Source
  • 1 Status of ConveyancePride Century The Eden Garden Building-Conveyance Declaration.pdf · uploaded 19 Feb 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)eden_garden.pdf · uploaded 2 Jul 2022Source
  • 16 Certificates of CA (Form 3)MAR21- FORM 3 - CA Cert EDEN GARDEN.pdf · uploaded 22 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-5 March-22 Eden Garden_0001.pdf · uploaded 25 Jan 2023Source
  • 5 Architect’s Certificate on Completion of Project (Form 4)Architect's Certificate The Eden Garden.pdf · uploaded 28 Jan 2023Source

Technical

  • Documenttoch map.pdf · uploaded 15 Sep 2017Source
  • Document1-7.pdf · uploaded 15 Sep 2017Source
  • Document4-7.pdf · uploaded 15 Sep 2017Source
  • Document5-7.pdf · uploaded 15 Sep 2017Source
  • Document1-8.pdf · uploaded 20 Mar 2018Source
  • Document2-8.pdf · uploaded 20 Mar 2018Source
  • Document3-8.pdf · uploaded 20 Mar 2018Source
  • Document4-8.pdf · uploaded 20 Mar 2018Source
  • Document5-8.pdf · uploaded 20 Mar 2018Source
  • Document6-8.pdf · uploaded 20 Mar 2018Source
  • Document7-8.pdf · uploaded 20 Mar 2018Source
  • Document8-8.pdf · uploaded 20 Mar 2018Source
  • Document1-8.pdf · uploaded 19 Jun 2020Source
  • Document2-8.pdf · uploaded 19 Jun 2020Source
  • Document3-8.pdf · uploaded 19 Jun 2020Source
  • Document4-8.pdf · uploaded 19 Jun 2020Source
  • Document5-8.pdf · uploaded 19 Jun 2020Source
  • Document6-8.pdf · uploaded 19 Jun 2020Source
  • Document7-8.pdf · uploaded 20 Jun 2020Source
  • Document8-8.pdf · uploaded 20 Jun 2020Source

Technical (Architect)

  • DocumentEden Jun 21.pdf · uploaded 15 Aug 2021Source

Technical (Engineer)

  • DocumentEngineers Certificate-The Eden Garden Jun'21.pdf · uploaded 15 Aug 2021Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAkw Associates—
EngineerCore Consultants—
OtherHanumanta Divre—
OtherPandit Pawar—
OtherRanjene Plumbing Works—
OtherShailendra Suryawanshi—
OtherShubh Constructions—

Source: MahaRERA project page. Contact details are not shown.