Skip to content
Deedo home
Menu

Zaveri Constructions

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Sachin Sumtilal Zaveri

5 Apr 2020Registered with MahaRERA
28 Aug 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
215 sq m (2,313 sq ft)
Permissible built-up area
424 sq m (4,567 sq ft)
Sanctioned built-up area
424 sq m (4,567 sq ft)
Address
4314, CTS 4314, JohariwadaPIN 431001
Designated bank account
Janata Sahakari Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 Aug 2022

The latest completion date on record passed 4 years and 2 months ago.

Registered
5 Apr 2020
Promised
28 Aug 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000253005 Apr 202028 Aug 2022—Sachin Sumtilal ZaveriProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Zaveri Constructions6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Zaveri Constructions

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per schedule0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingYes0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per schedule0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationElectrical meter provision as per schedule0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 16 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration in FORM BmergedfromB.pdf · uploaded 19 Nov 2019View
  • Details of encumbrancesmergedfromB.pdf · uploaded 19 Nov 2019View
  • Copy of the legal title reportlegalsearch_compressed.pdf · uploaded 11 Mar 2020View
  • Copy of Layout Approval (in case of layout)Epson103_compressed.pdf · uploaded 11 Mar 2020View
  • Building Plan Approval / NA Order for plotted developmentEpson103_compressed.pdf · uploaded 11 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 11 Mar 2020View
  • Proforma of Allotment lettera to sale zaveri.pdf · uploaded 11 Mar 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1.pdf · uploaded 18 Mar 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2.pdf · uploaded 18 Mar 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 26 Aug 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 1 Jul 2022View

Promoter documents

  • Declaration Form BmergedfromB.pdf · uploaded 19 Nov 2019View
  • Legal Title reportlegalsearch_compressed.pdf · uploaded 11 Mar 2020View

Technical documents

  • Layout ApprovalEpson103_compressed.pdfView
  • Building Plan ApprovalEpson103_compressed.pdfView

Proforma allotment letter

  • Proforma allotment lettera to sale zaveri.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

4314

As published on MahaRERA's project page

4314

Boundaries

North
road
South
road
East
road
West
road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSiddiqui M Hares S—
Chartered accountantMaitreya Bhalerao—
EngineerPradeep Mote—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology