Commercial Cum Residential · Yash Tower

Aurangabad (M Corp.) · RERA P51500001341

IDBLD_0100545 floorsCompleted
5Sanctioned habitable floorsregistration certificate
1 Aug 2018Promised completion

Floors

5 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P51500001341 · registered 27 Jul 2017
Promised completion
1 Aug 2018
Sanctioned habitable floors
5

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
OFFICE12.8 m² (138 sq.ft)4not published
OFFICE13.2 m² (142 sq.ft)1not published
OFFICE13.3 m² (143 sq.ft)8not published
OFFICE13.4 m² (145 sq.ft)4not published
OFFICE13.6 m² (146 sq.ft)1not published
OFFICE13.7 m² (148 sq.ft)1not published
OFFICE13.8 m² (148 sq.ft)1not published
OFFICE13.9 m² (150 sq.ft)14not published
OFFICE14.2 m² (153 sq.ft)1not published
OFFICE14.3 m² (154 sq.ft)1not published
Show all 15 unit typesShow fewer unit types
TypeCarpet areaUnitsBooked
OFFICE73.4 m² (790 sq.ft)1not published
OFFICE80.9 m² (870 sq.ft)1not published
OFFICE85.3 m² (918 sq.ft)1not published
RESIDENTIAL69.5 m² (748 sq.ft)1not published
SHOW ROOM77.5 m² (834 sq.ft)1not published
Total41

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
Show all 11 activitiesShow fewer activities
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through10 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology