Vrundawan Srushti

Completed

Aurangabad (M Corp.), Aurangabad 431007 |Promoter: Vrundawan Builders

Residential / Group HousingRERAP51500025358
30 Apr 2020Registered with MahaRERA
23 Sep 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,200 sq m (12,917 sq ft)
Permissible built-up area
1,295 sq m (13,943 sq ft)
Sanctioned built-up area
1,295 sq m (13,943 sq ft)
Address
Gut No 86 Shendra Jahangir, Gut No 86 Shendra Jahangir Aurangabad, AurangabadPIN 431007
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Vrundawan Srushti is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 23 Sep 2024

The latest completion date on record passed 2 years and 1 month ago.

Registered
30 Apr 2020
Promised
23 Sep 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002535830 Apr 202023 Sep 2024—Vrundawan BuildersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vrundawan Srushti6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vrundawan Srushti

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyPer Approved Plan100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As Per Approved Plan100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingPer Approved Plan100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 20 filings listed on MahaRERA's project page

Allotment letters

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)building Layout_compressed.pdf · uploaded 7 Jan 2020View
  • Declaration in FORM BFrm B_compressed.pdf · uploaded 10 Jan 2020View
  • Proforma of Allotment letterproforma_allotment_letter.pdf · uploaded 13 Jan 2020View
  • Proforma of Allotment letterAgreement_for_Sale_Format.pdf · uploaded 13 Jan 2020View
  • Details of encumbrancesEncrumbrances Certificate_compressed.pdf · uploaded 13 Jan 2020View
  • Building Plan Approval / NA Order for plotted developmentVrundavan building plan_compressed.pdf · uploaded 28 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentNA.pdf · uploaded 28 Mar 2020View
  • Copy of the legal title reportTitle Report Final.pdf · uploaded 21 Apr 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Architect Certifficate.pdf · uploaded 12 Jul 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development2023-07-08 Full Occupancy Certificate.pdf · uploaded 12 Jul 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Vrundawan Srushti_11zon.pdf · uploaded 14 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 20-21.pdf · uploaded 23 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 21-22.pdf · uploaded 23 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 23 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA_REPORT_23-24_VRUNDAWAN_BUILDERS.pdf · uploaded 23 Jul 2024View

Promoter documents

  • Declaration Form BFrm B_compressed.pdf · uploaded 10 Jan 2020View
  • Legal Title reportTitle Report Final.pdf · uploaded 21 Apr 2020View

Technical documents

  • Layout Approvalbuilding Layout_compressed.pdfView
  • Building Plan ApprovalVrundavan building plan_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterproforma_allotment_letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut No 86 Shendra Jahangir

As published on MahaRERA's project page

Gut No 86 Shendra Jahangir

Boundaries

North
Part of Gut No 86 P
South
Approach Road of Gut No 86
East
Plot Of Kute
West
Lalit Park Plotting

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJB Associates—
Chartered accountantYash Nagar—
EngineerAbhay Patil—
OtherPathan Jaber—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology