Skip to content
Deedo home
Menu

Viraj Shilp Residency

Completed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Shilp Constructions

Residential / Group HousingRERAP51500024691
28 Feb 2020Registered with MahaRERA
1 Jan 2023Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK16 units in all
Land area for this project
690 sq m (7,427 sq ft)
Permissible built-up area
759 sq m (8,170 sq ft)
Sanctioned built-up area
759 sq m (8,170 sq ft)
Address
Plot No 37, 38 Cts No. 12369/381, 12369/382, Bassiyenagar, BaijipuraPIN 431005
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Viraj Shilp Residency is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Jan 2023

The latest completion date on record passed 3 years and 9 months ago.

Registered
28 Feb 2020
Promised
1 Jan 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002469128 Feb 20201 Jan 2023—Shilp ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Viraj Shilp Residency616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

2BHK · 8 units3BHK · 8 units
TypeCarpet areaUnits
2BHK58.85 sq m · 633 sq ft8
3BHK69.05 sq m · 743 sq ft8

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00006

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Viraj Shilp Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyMUNICIPAL WATER SUPPLY10%
  • Sewerage (Chamber, Lines, Septic Tank , STP)MUNICIPAL DRAINAGE LINE10%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingPROPOSED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 19 filings listed on MahaRERA's project page

Other (16)

Show all 36 documentsShow fewer documents

Other (16)

Registration certificate

Document library

  • Details of encumbrancesnon encumbrance VS.pdf · uploaded 23 Jan 2020View
  • Copy of Layout Approval (in case of layout)Layout Plan Bassiyenagar VS.pdf · uploaded 23 Jan 2020View
  • Building Plan Approval / NA Order for plotted developmentREV sanction Plan VS.pdf · uploaded 23 Jan 2020View
  • Commencement Certificates / NA Order for plotted developmentRev CC Order Viraj Shilp.pdf · uploaded 23 Jan 2020View
  • Declaration in FORM Bform B pramoter VS.pdf · uploaded 23 Jan 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 architech VS.pdf · uploaded 23 Jan 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 EngR VS.pdf · uploaded 23 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5 CA 2018-19.pdf · uploaded 23 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)form 5 CA 1917-18.pdf · uploaded 23 Jan 2020View
  • Proforma of Allotment letterANEXTURE A Model Agreement RERA.pdf · uploaded 23 Jan 2020View
  • Copy of the legal title reportSearch Viraj Shilp Residency001 (1).pdf · uploaded 23 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 VS 2021.pdf · uploaded 16 Dec 2021View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 VS FEB 2022.pdf · uploaded 7 Apr 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC VS ORDER.pdf · uploaded 7 Apr 2022View

Promoter documents

  • Declaration Form Bform B pramoter VS.pdf · uploaded 23 Jan 2020View
  • Legal Title reportSearch Viraj Shilp Residency001 (1).pdf · uploaded 23 Jan 2020View

Technical documents

  • Layout ApprovalLayout Plan Bassiyenagar VS.pdfView
  • Building Plan ApprovalREV sanction Plan VS.pdfView

Proforma allotment letter

  • Proforma allotment letterANEXTURE A Model Agreement RERA.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

12369/38112369/38212369/382373838 CTS NO. 12369/381PLOT NO 37

As published on MahaRERA's project page

PLOT NO 37,38 CTS NO. 12369/381,12369/382

Boundaries

North
Plot No 39 And Dp Road
South
Plot No 36
East
25 Feet Wide Road
West
Open Land

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhananjay Girdhar—
Chartered accountantNeha Mandhane—
EngineerDhiraj Mundada—
OtherP M Mandhane—
OtherSanjay Santre—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology