Varad Residency

Lapsed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Karimkhan Mohidinkhan Pathan

Residential / Group HousingRERAP51500012176
1 Sep 2017Registered with MahaRERA
22 Aug 2018Promised completion
31 Dec 2025Revised completionPushed back 7 years and 4 months
1Building
15Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
2BHK, Shop15 units in all
Land area for this project
421 sq m (4,530 sq ft)
Permissible built-up area
700 sq m (7,535 sq ft)
Sanctioned built-up area
580 sq m (6,243 sq ft)
Address
Plot No 12 and 13 Gu No 42pPIN 431005
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.60666, 73.75247
Varad Residency is at latitude 18.60666, longitude 73.75247.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 7 years and 4 months

The latest completion date on record passed 10 months ago.

Registered
1 Sep 2017
Promised
22 Aug 2018
Revised
31 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000121761 Sep 201722 Aug 201831 Dec 2025Karimkhan Mohidinkhan PathanProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Varad Residency615

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

15 units registered

2BHK · 12 unitsShop · 3 units
TypeCarpet areaUnits
2BHK53.18 sq m · 572 sq ft4
2BHK55.53 sq m · 598 sq ft8
Shop14.72 sq m · 158 sq ft1
Shop14.75 sq m · 159 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00004

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Varad Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)1000%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking1004%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 32 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of Layout Approval (in case of layout)001 VARAD Layout.pdf · uploaded 29 Jul 2017View
  • Commencement Certificates / NA Order for plotted development002 VARAD Commencement.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)003 VARAD Permission Drawing.pdf · uploaded 29 Jul 2017View
  • Copy of the legal title report004 Varad Search Part 1.pdf · uploaded 29 Jul 2017View
  • Copy of the legal title report004 Varad Search Part 2.pdf · uploaded 29 Jul 2017View
  • Declaration in FORM BForm B Karim Varad.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Varad Architect Cert.pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Varad Engr cert.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesNo Encumbrance Cert VARAD.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAGREEMENT of Sale _ VARAD.pdf · uploaded 31 Jul 2017View
  • Certificates of CA (Form 5)Varad Form 5 CA.pdf · uploaded 5 Aug 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Varad QC 2019_20.pdf · uploaded 5 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Varad QC 2020_21_22_23.pdf · uploaded 5 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Varad QC 2020_21_22_23.pdf · uploaded 5 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Varad Form 5 Y18_19.pdf · uploaded 5 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Varad Form 5 Y19_20.pdf · uploaded 5 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Varad Form 5 Y20_21.pdf · uploaded 5 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Varad Form 5 Y21_22.pdf · uploaded 5 Apr 2023View
  • Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 10 Oct 2023View
  • Disclosure of sold/ booked inventoryDiscloser of Sold Unsold Inventory.pdf · uploaded 10 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Varad QC 2022_23.pdf · uploaded 10 Oct 2023View
  • CERSAI detailsCERSAI Affedevit.pdf · uploaded 10 Oct 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organisations.pdf · uploaded 10 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Varad Form 5 2022_23.pdf · uploaded 15 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Euphoria QC 2021_22_23.pdf · uploaded 26 Mar 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Euphoria Form 5_2023.pdf · uploaded 26 Mar 2025View

Promoter documents

  • Legal Title report004 Varad Search Part 1.pdf · uploaded 29 Jul 2017View
  • Legal Title report004 Varad Search Part 2.pdf · uploaded 29 Jul 2017View
  • Declaration Form BForm B Karim Varad.pdf · uploaded 30 Jul 2017View

Technical documents

  • Layout Approval001 VARAD Layout.pdfView
  • Building Plan Approval003 VARAD Permission Drawing.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT of Sale _ VARAD.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

13 Gu No 42pPlot No 12

As published on MahaRERA's project page

Plot No 12 and 13 Gu No 42p

Boundaries

North
9 m wide road
South
Plot no 11
East
6 m wide road
West
Plot No 14 and 15

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMd Yunus Md Yusuf—
OtherDinesh Chavan—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology