Tridal-B

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Trishul Constructions

Residential / Group HousingRERAP51500048055
8 Dec 2022Registered with MahaRERA
29 May 2025Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,417 sq m (15,252 sq ft)
Permissible built-up area
1,726 sq m (18,584 sq ft)
Sanctioned built-up area
1,726 sq m (18,584 sq ft)
Planning authority
Aurangabad Municipal Corporation
Address
2958, 2959, 2960, 2961, Narali Bag, AurangabadPIN 431001
Designated bank account
Saraswat Cooperative Bank Limited
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.87617, 75.34331
Tridal-B is at latitude 19.87617, longitude 75.34331.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 29 May 2025

The latest completion date on record passed 1 year and 5 months ago.

Registered
8 Dec 2022
Promised
29 May 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000480558 Dec 202229 May 2025—Trishul ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tridal-II Apartment6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered0001414
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Tridal-II Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor80%
  • Slabs of Super Structure25%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyThrough Municipal Corporation Connection0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Through Municipal Drainage0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingOnly Tree Plantation20%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

52 documents held by Deedo, 83 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 23 Aug 2022View
  • Copy of Layout Approval (in case of layout)Revised Drawing Layout_compressed.pdf · uploaded 23 Aug 2022View
  • Building Plan Approval / NA Order for plotted developmentRevised Drawing Layout_compressed.pdf · uploaded 23 Aug 2022View
  • a Details of encumbrances concerned to FinanceENCUMBRANCES- FINANCE.pdf · uploaded 23 Aug 2022View
  • b Details of encumbrances concerned to LegalENCUMBRANCES LEGAL.pdf · uploaded 27 Aug 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Encumbrance.pdf · uploaded 13 Oct 2022View
  • Copy of the legal title reportNew Legal Title Report_merged.pdf · uploaded 21 Oct 2022View
  • CERSAI detailsilovepdf_merged.pdf · uploaded 21 Oct 2022View
  • Declaration about Commencement Certificateformat D revised 2.pdf · uploaded 31 Oct 2022View
  • a Details of encumbrances concerned to FinanceE Legal.pdf · uploaded 3 Nov 2022View
  • b Details of encumbrances concerned to LegalE Legal.pdf · uploaded 3 Nov 2022View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 3 Nov 2022View
  • Deviation Report with respect to Allotment letterDeviation Allotement Letter.pdf · uploaded 3 Nov 2022View
  • Deviation Report with respect to model copy of AgreementDeviation MCA.pdf · uploaded 3 Nov 2022View
  • Copy of Layout Approval (in case of layout)Letter.pdf · uploaded 4 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Revised Architect Certificate.pdf · uploaded 4 Nov 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Revised Engineer Certificate.pdf · uploaded 4 Nov 2022View
  • Proforma of Agreement for saleAgreement to Sale.pdf · uploaded 9 Nov 2022View
  • Declaration in FORM BForm B Notarised.pdf · uploaded 15 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-30622.pdf · uploaded 16 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-300622.pdf · uploaded 16 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-311222.pdf · uploaded 16 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-300922.pdf · uploaded 16 Mar 2023View
  • Disclosure of sold/ booked inventorySold Unsold Trishul.pdf · uploaded 28 Mar 2023View
  • Other – FinanceAnnexure A Declaration cum Undertaking notarised.pdf · uploaded 3 Aug 2024View
  • Other – FinanceDeclaration for RERA designated bank account.pdf · uploaded 3 Aug 2024View
  • Other – Financeself declaration .pdf · uploaded 3 Aug 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 28 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 28 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)trishul form 1 Q3.pdf · uploaded 13 Jun 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)trishul form 1 Q4.pdf · uploaded 13 Jun 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Trishul form 2 Q3.pdf · uploaded 13 Jun 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Trishul form 2 Q4.pdf · uploaded 13 Jun 2025View
  • Other – FinanceCover Letter.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure A - self declaration.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure B - Annexure A Declaration cum Undertaking notarised.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure D - Declaration for RERA designated bank account.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure E - QPR Complainces.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure F - Commencement Certificate.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure G - trishul disclosure of sold unsold.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure C - Form 3.pdf · uploaded 19 Jul 2025View
  • Form 1trishul form 1 Q3.pdf · uploaded 26 Aug 2025View
  • Form 2Trishul form 2 Q3.pdf · uploaded 26 Aug 2025View
  • Disclosure of Sold and Booked Inventorytrishul_q3_311224 (1)_compressed (2).pdf · uploaded 26 Aug 2025View
  • Form 1trishul form 1 Q4.pdf · uploaded 26 Aug 2025View
  • Form 2Trishul form 2 Q4.pdf · uploaded 26 Aug 2025View
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 26 Aug 2025View
  • Form 1Form 1.pdf · uploaded 13 Oct 2025View
  • Form 2Form 2.pdf · uploaded 13 Oct 2025View
  • Disclosure of Sold and Booked InventoryTrishul Sold Unsold.pdf · uploaded 13 Oct 2025View
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 12 Nov 2025View
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 12 Nov 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 12 Nov 2025View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 12 Nov 2025View
  • Form 1trishul form 1 Q3.pdf · uploaded 18 Dec 2025View
  • Form 2Trishul form 2 Q3.pdf · uploaded 18 Dec 2025View
  • Disclosure of Sold and Booked InventoryForm 3 30 9 2024 signed.pdf · uploaded 18 Dec 2025View
  • Form 5 (FY 2023-2024)1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf · uploaded 18 Dec 2025View
  • Form 5 (FY 2022-2023)3 (1).pdf · uploaded 18 Dec 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 18 Dec 2025View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 18 Dec 2025View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 20 Dec 2025View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 20 Dec 2025View
  • Occupational CertificateTrishul Constructions Occupancy Certificate.pdf · uploaded 23 Dec 2025View
  • Occupational CertificateForm 4.pdf · uploaded 23 Dec 2025View
  • Occupational CertificateGmail - 111 07 SANTION BP OC POROPSAL 01012025.pdf · uploaded 2 Jan 2026View

Promoter documents

  • Legal Title reportNew Legal Title Report_merged.pdf · uploaded 21 Oct 2022View
  • Declaration Form BForm B Notarised.pdf · uploaded 15 Nov 2022View

Technical documents

  • Layout ApprovalRevised Drawing Layout_compressed.pdfView
  • Layout ApprovalLetter.pdfView
  • Building Plan ApprovalRevised Drawing Layout_compressed.pdfView

Financial documents

  • Other – FinanceAnnexure A Declaration cum Undertaking notarised.pdf · uploaded 3 Aug 2024View
  • Other – FinanceDeclaration for RERA designated bank account.pdf · uploaded 3 Aug 2024View
  • Other – Financeself declaration .pdf · uploaded 3 Aug 2024View
  • Other – FinanceCover Letter.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure A - self declaration.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure B - Annexure A Declaration cum Undertaking notarised.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure D - Declaration for RERA designated bank account.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure E - QPR Complainces.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure F - Commencement Certificate.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure G - trishul disclosure of sold unsold.pdf · uploaded 19 Jul 2025View
  • Other – FinanceAnnexure C - Form 3.pdf · uploaded 19 Jul 2025View

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

2958295929602961

As published on MahaRERA's project page

2958,2959,2960,2961

Boundaries

North
City Survey No 2958
South
Road
East
Road
West
Compound Wall of ZP Quarter

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVishnu Kunjar—
ArchitectVishnu Kunjar—
Chartered accountantCA Santosh Garud—
Chartered accountantCA Sunil Salunke—
Chartered accountantSantosh B Garud—
EngineerFaiz Abdul Majeed Sagri—
EngineerSatish Shinde—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology