Tapadia Sukhvastu

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Tapadia Constructions Limited

Residential / Group HousingRERAP51500027230
25 Nov 2020Registered with MahaRERA
30 Dec 2023Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Land area for this project
3,507 sq m (37,748 sq ft)
Permissible built-up area
5,522 sq m (59,438 sq ft)
Sanctioned built-up area
5,522 sq m (59,438 sq ft)
Address
Plot No. 66, Gut No.155 Part, Plot No. 66, Gut No 155 Part, Mitmita, AurangabadPIN 431001
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Tapadia Sukhvastu is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
25 Nov 2020
Promised
30 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002723025 Nov 202030 Dec 2023—Tapadia Constructions LimitedProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A13—
Building B13—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building AClosed/Covered000010
Building AOpen Space00000
Building BClosed/Covered000010
Building BOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Building B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsONLY MARGINAL SPACE WILL BE DEVELOP FOR APPROACHES100%
  • Water SupplyWORK COMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP100%
  • Storm Water DrainsONLY CHAMBER LINES AS PER PROPOSED SCHEDUL100%
  • Landscaping & Tree PlantingWORK COMPLETED100%
  • Street LightingWORK COMPLETED100%
  • Community BuildingsTO BE STARTEDNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalTO BE STARTEDNot applicable
  • Water conservation /Rain water harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRICAL METER WILL BE PROVIDED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • COMPOUND WALL AND ENTRANCE GATEWORK COMPLETED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 34 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate MHADA.pdf · uploaded 17 Nov 2020View
  • Copy of the legal title reportSearch Cum Title Report MHADA.pdf · uploaded 17 Nov 2020View
  • Copy of Layout Approval (in case of layout)LAND LAYOUT AND BUILDING PLAN.pdf · uploaded 17 Nov 2020View
  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 1.pdf · uploaded 17 Nov 2020View
  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 2.pdf · uploaded 17 Nov 2020View
  • Details of encumbrancesDeclaration Regarding Encumbrances.pdf · uploaded 20 Nov 2020View
  • Declaration in FORM BFORM B - TAPADIA SUKHVASTU.pdf · uploaded 20 Nov 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Architects Certificate Form.pdf · uploaded 20 Nov 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineers Certificate - MULEY.pdf · uploaded 20 Nov 2020View
  • Proforma of Allotment letterAGREEMENT TO SALE FORMAT - TAPADIA SUKHVASTU.pdf · uploaded 20 Nov 2020View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERT (REVISED) - TAPADIA SUKHVASTU.pdf · uploaded 19 Apr 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 REVISED - ARCHITECT CERTIFICATE - T SUKHVASTU.pdf · uploaded 8 Jun 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 REVISED Engineers Certificate - MULEY (6).pdf · uploaded 8 Jun 2021View
  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN REVISED - TAPADIA SUKHVASTU (2).pdf · uploaded 8 Jun 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 - RERA AUDIT FY 2020-21.pdf · uploaded 19 Jun 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Sukhvastu_FORM_2A_DEC2020 (1).pdf · uploaded 6 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Sukhvastu_FORM_2A_MAR2021 (1).pdf · uploaded 6 Jul 2021View
  • Disclosure of sold/ booked inventoryDeclaration of Sold Booked.pdf · uploaded 28 Jul 2021View
  • Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 28 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 - TAPADIA SUKHVASTU - TCL FY 2021-22.pdf · uploaded 17 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 - TAPADIA SUKHVASTU - TCL FY 2022-23.pdf · uploaded 26 Jun 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 - ARCHITECT CERTIFICATE - TAPADIA SUKHVASTU.pdf · uploaded 22 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 - ARCHITECT CERTIFICATE - TAPADIA SUKHVASTU.pdf · uploaded 26 Nov 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE - TAPADIA SUKHVASTU.pdf · uploaded 26 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 - ARCHITECT CERTIFICATE - TAPADIA SUKHVASTU1.pdf · uploaded 26 Dec 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 27 Dec 2024View
  • Proforma of Agreement for saleAGMT FOR SALE TAPADIA SUKHVASTU WEF 04092024.pdf · uploaded 10 Feb 2025View

Promoter documents

  • Legal Title reportSearch Cum Title Report MHADA.pdf · uploaded 17 Nov 2020View
  • Declaration Form BFORM B - TAPADIA SUKHVASTU.pdf · uploaded 20 Nov 2020View

Technical documents

  • Layout ApprovalLAND LAYOUT AND BUILDING PLAN.pdfView
  • Building Plan ApprovalBUILDING PLAN 1.pdfView
  • Building Plan ApprovalBUILDING PLAN 2.pdfView
  • Building Plan ApprovalBUILDING PLAN REVISED - TAPADIA SUKHVASTU (2).pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT TO SALE FORMAT - TAPADIA SUKHVASTU.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO.155 PARTPLOT NO. 66

As published on MahaRERA's project page

PLOT NO. 66, GUT NO.155 PART

Boundaries

North
Remaining Land In Gut No 155
South
Open Space And 7and Half Metre Wide Road
East
9 Metre Wide Road And Remaining Land In Gut No 15
West
Nala

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSidhant Suhas Jagirdar Proprietor Of Spur Architects—
Chartered accountantPankaj K Gangwal Partner Of Jain And Gangwal—
EngineerNiranjan Muley Proprietor Of Muley's Engineering Consultancy Services India—

Source: MahaRERA project page. Contact details are not shown.