Suvidhi Signature

Completed

Aurangabad (M Corp.), Aurangabad 431006 |Promoter: Sunder Ajanta Hospitality

21 Apr 2023Registered with MahaRERA
31 Dec 2027Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
2
Land area for this project
6,030 sq m (64,906 sq ft)
Permissible built-up area
13,011 sq m (1,40,048 sq ft)
Sanctioned built-up area
9,011 sq m (96,992 sq ft)
Planning authority
MIDC Civil Dn. Aurangabad
Address
Plot No P-86 in MIDC, Chikalthana Industrial Area, MIDC Road, Chikalthana Industrial AreaPIN 431006
Designated bank account
The Akola Urban Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.88267, 75.37273
Suvidhi Signature is at latitude 19.88267, longitude 75.37273.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
21 Apr 2023
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005064221 Apr 202331 Dec 2027—Sunder Ajanta HospitalityProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Commercial Building5—
Residential Building9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Commercial BuildingClosed/Covered000070
Commercial BuildingOpen Space00000
Residential BuildingClosed/Covered000024
Residential BuildingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Commercial Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Residential Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCompleted100%
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsCompleted100%
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterCompleted100%
  • Solid Waste Management And DisposalCompleted100%
  • Water conservation /Rain water harvestingCompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCompleted100%
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

76 documents held by Deedo, 111 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • a Details of encumbrances concerned to FinanceLETTER OF ENCUMBERANCE.pdf · uploaded 15 Mar 2023View
  • b Details of encumbrances concerned to LegalLETTER OF ENCUMBERANCE.pdf · uploaded 15 Mar 2023View
  • Copy of the legal title reportTITLE REPORT (1).pdf · uploaded 15 Mar 2023View
  • a Details of encumbrances concerned to FinanceDECLERATION NO-ENCUMEMBRANCE CONCERING LEGAL.pdf · uploaded 15 Mar 2023View
  • b Details of encumbrances concerned to LegalDECLERATION NO-ENCUMEMBRANCE CONCERING LEGAL.pdf · uploaded 15 Mar 2023View
  • Declaration about Commencement Certificatedecleration about commencement certificate.pdf · uploaded 15 Mar 2023View
  • Declaration in FORM BDECLERATION BY AUTORISED PROMOTOR.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsRERA INFO OF PARTNERS SUVUDHI SINGTURE_1.pdf · uploaded 15 Mar 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsRERA INFO OF PARTNERS SUVUDHI SINGTURE_2.pdf · uploaded 15 Mar 2023View
  • Deviation Report with respect to Allotment letterDEVIATION IN ALLOTMENT.pdf · uploaded 15 Mar 2023View
  • Deviation Report with respect to model copy of AgreementDEVIATION IN AGREEMENT.pdf · uploaded 15 Mar 2023View
  • Copy of Layout Approval (in case of layout)P 86 CHK SANCTIONED PLAN_layout.pdf · uploaded 15 Mar 2023View
  • Building Plan Approval / NA Order for plotted developmentP 86 CHK SANCTIONED PLAN_repaired (1).pdf · uploaded 15 Mar 2023View
  • Commencement Certificates / NA Order for plotted developmentP 86 CHK CC LETTER_repaired.pdf · uploaded 15 Mar 2023View
  • Proforma of Agreement for salemodel-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdf · uploaded 15 Mar 2023View
  • Proforma of Allotment letterallotmrnt letter new format.pdf · uploaded 15 Mar 2023View
  • CERSAI detailsCERSAI_Search_Report_200263108122_For_Asset_Based_Search_16_03_2023_11_13_48_266.pdf · uploaded 16 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 16 Mar 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameLETTER HEAD 1.pdf · uploaded 16 Mar 2023View
  • Other – TechnicalP-86 PART OCCUPANCY.pdf · uploaded 24 Mar 2023View
  • Other – TechnicalSunder Hospitality -_0001.pdf · uploaded 24 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Certificate of cost.pdf · uploaded 3 Apr 2023View
  • Other – TechnicalMIDC APPLICATION.pdf · uploaded 3 Apr 2023View
  • Other – TechnicalARCHITECT CERTIFICATE.pdf · uploaded 3 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFIACATE Q-1 (2023).pdf · uploaded 27 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE Q-2 (2023).pdf · uploaded 27 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFIACTE Q-1 (2023).pdf · uploaded 27 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE - Q-2 (2023).pdf · uploaded 27 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A Q-1 (2023).pdf · uploaded 27 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A Q-2 (2023).pdf · uploaded 27 Oct 2023View
  • Disclosure of sold/ booked inventorySOLD BOOKED INVENTRY ( APR-JUNE 2023).pdf · uploaded 27 Oct 2023View
  • Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY (JULY-SEP 2023).pdf · uploaded 27 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECH CERTIFICATE Q-3.pdf · uploaded 20 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE Q-3.pdf · uploaded 20 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)QUALITY ASSURANCE CERTIFICATE Q-3.pdf · uploaded 20 Jan 2024View
  • Disclosure of sold/ booked inventoryDISCLOSER OF SOLD UNSOLD DEC 2023.pdf · uploaded 31 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFIACATE SCAN.pdf · uploaded 11 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Site Supervisor Certificate ( FORM -2A ).pdf · uploaded 11 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFIACTE SCAN.pdf · uploaded 11 Apr 2024View
  • Disclosure of sold/ booked inventoryDocScanner 29-Apr-2024 1-08 pm.pdf · uploaded 29 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)24-25 Q1 ARCHITECT'S CERTIFICATE.pdf · uploaded 23 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)24-25 Q1 ENGINEEER'S CERTIFICATE.pdf · uploaded 23 Jul 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SITE SUPERVISOR CERTIFICATE.pdf · uploaded 23 Jul 2024View
  • Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD.pdf · uploaded 26 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE Q2 .pdf · uploaded 19 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE Q2.pdf · uploaded 19 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QUALITY ASSURANCE CERTIFICATE Q2.pdf · uploaded 19 Oct 2024View
  • Disclosure of sold/ booked inventoryDISCLOSURE SOLD BOOKED INVENTORY Q2.pdf · uploaded 29 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)ANNUAL REPORT STATEMENT OF ACCOUNTS RERA 23-24.pdf · uploaded 27 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT Certificate Q3.pdf · uploaded 24 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Q3.pdf · uploaded 24 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Certificate Q3.pdf · uploaded 24 Jan 2025View
  • Disclosure of sold/ booked inventoryDisclosure Of Sold Booked Inventory Q3.pdf · uploaded 24 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Q-4 ARCHITECT'S CERTIFICATE.pdf · uploaded 12 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Q-4 ENGINEER CERTIFICATE.pdf · uploaded 12 Apr 2025View
  • Disclosure of sold/ booked inventoryQ-4 DISCLOSURE OF SOLD BOOKED.pdf · uploaded 12 Apr 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Q-4 QUALITY ASSURANCE CERTIFICATE .pdf · uploaded 12 Apr 2025View
  • Form 1Form 1.pdf · uploaded 29 Aug 2025View
  • Form 2Form 2.pdf · uploaded 29 Aug 2025View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 29 Aug 2025View
  • OthersForm 2A.pdf · uploaded 29 Aug 2025View
  • Form 1Form 1.pdf · uploaded 29 Aug 2025View
  • Form 2Form 2.pdf · uploaded 29 Aug 2025View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 29 Aug 2025View
  • OthersForm 2A.pdf · uploaded 29 Aug 2025View
  • Form 5 (FY 2024-2025)Form 5 (11).pdf · uploaded 30 Sep 2025View
  • Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 24 Apr 2026View
  • OthersForm 2A.pdf · uploaded 24 Apr 2026View
  • Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 24 Apr 2026View
  • OthersForm 2A.pdf · uploaded 24 Apr 2026View
  • Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 24 Apr 2026View
  • OthersForm 2A.pdf · uploaded 24 Apr 2026View
  • Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 24 Apr 2026View
  • OthersForm 2A.pdf · uploaded 24 Apr 2026View
  • Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 24 Apr 2026View
  • OthersForm 2A.pdf · uploaded 24 Apr 2026View
  • Form 1Form 1.pdf · uploaded 24 Apr 2026View
  • Form 2Form 2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisc.pdf · uploaded 24 Apr 2026View
  • Others2A.pdf · uploaded 24 Apr 2026View
  • Form 1Architech Certificate Q-1.pdf · uploaded 24 Apr 2026View
  • Form 2Engineer Certificate Q-1.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryQ-1 SOLD UNSOLD DISCLOSURE.pdf · uploaded 24 Apr 2026View
  • OthersQ-1 ANNEXURE 2A QUALITY.pdf · uploaded 24 Apr 2026View
  • Form 1Architect Certificate Q-2.pdf · uploaded 24 Apr 2026View
  • Form 2Engineer Certificae Q-2.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Q-2.pdf · uploaded 24 Apr 2026View
  • OthersQA Certificate Q-2.pdf · uploaded 24 Apr 2026View
  • Form 1Architect Certificate Q-3.pdf · uploaded 24 Apr 2026View
  • Form 2Engineer Certificate Q-3.pdf · uploaded 24 Apr 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Q-3.pdf · uploaded 24 Apr 2026View
  • OthersQA Certificate Q-3.pdf · uploaded 24 Apr 2026View
  • Withdrawal Update Form 1Architech Certificate Q-4 25-26.pdf · uploaded 17 Jun 2026View
  • Withdrawal Update Form 2Engineer Certificate Q-4 25-26.pdf · uploaded 17 Jun 2026View
  • Occupational CertificateP 86 CHK New Occupancy Certificate 06-03-25 .pdf · uploaded 17 Jun 2026View
  • Occupational CertificateMIDC Mail subimission to rera.pdf · uploaded 1 Jul 2026View

Promoter documents

  • Legal Title reportTITLE REPORT (1).pdf · uploaded 15 Mar 2023View
  • Declaration Form BDECLERATION BY AUTORISED PROMOTOR.pdf · uploaded 15 Mar 2023View

Technical documents

  • Layout ApprovalP 86 CHK SANCTIONED PLAN_layout.pdfView
  • Building Plan ApprovalP 86 CHK SANCTIONED PLAN_repaired (1).pdfView

Proforma allotment letter

  • Proforma allotment letterallotmrnt letter new format.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Plot No P86 in MIDC

As published on MahaRERA's project page

Plot No P-86 in MIDC, Chikalthana Industrial Area

Boundaries

North
Plot No E 37
South
Plot No E 36A
East
Plot No E 36A
West
MIDC Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAKW Associates—
Chartered accountantPrasanna P Kala and Associates—
EngineerCore Consultants—
EngineerMilind Wadekar—

Source: MahaRERA project page. Contact details are not shown.