Sunrise Residency

Active

Aurangabad (M Corp.), Aurangabad 431010 |Promoter: Global Infra Builders And Developers

Residential / Group HousingRERAP51500055207
11 Mar 2024Registered with MahaRERA
31 Mar 2027Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
471 sq m (5,075 sq ft)
Permissible built-up area
1,711 sq m (18,416 sq ft)
Sanctioned built-up area
1,456 sq m (15,671 sq ft)
Address
Plot No 5 And 8 Gut No 99 Part Satara Tq And Dist Aurangabad, Satara, SataraPIN 431010
Designated bank account
IDFC First Bank Ltd
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Sunrise Residency is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2027

Registered
11 Mar 2024
Promised
31 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005520711 Mar 202431 Mar 2027—Global Infra Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sunrise Residency6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00007
Open Space000028

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sunrise Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFROM BORE-WELL30%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DRAINAGE LINE TILL AMC LINE10%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NROMS10%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 37 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same1 Format A.pdf · uploaded 1 Feb 2024View
  • Deviation Report with respect to Allotment letter4 No Deviation Allott.pdf · uploaded 1 Feb 2024View
  • Deviation Report with respect to model copy of Agreement3 No Dev Agreement to Sale.pdf · uploaded 1 Feb 2024View
  • a Details of encumbrances concerned to Finance6 NO ENC FIN.pdf · uploaded 1 Feb 2024View
  • b Details of encumbrances concerned to Legal6 NO ENC FIN.pdf · uploaded 1 Feb 2024View
  • CERSAI details10 CERSAI Declaration.pdf · uploaded 1 Feb 2024View
  • a Details of encumbrances concerned to Finance7 NO ENC Legal.pdf · uploaded 1 Feb 2024View
  • b Details of encumbrances concerned to Legal7 NO ENC Legal.pdf · uploaded 1 Feb 2024View
  • Building Plan Approval / NA Order for plotted developmentPLAN SUNRISE (1).pdf · uploaded 1 Feb 2024View
  • Declaration about Commencement CertificateSunrise Residency Format-D.pdf · uploaded 1 Feb 2024View
  • Disclosure of Interest in Other Real Estate Organizations8 Disc of In in Other Projects.pdf · uploaded 1 Feb 2024View
  • Proforma of Allotment letter9 Model Form of Allottment Letter.pdf · uploaded 1 Feb 2024View
  • Proforma of Agreement for saleATS Draft RERA.pdf · uploaded 1 Feb 2024View
  • Copy of the legal title reportSunrise Search Report_compressed.pdf · uploaded 1 Feb 2024View
  • Commencement Certificates / NA Order for plotted developmentCC COPY.pdf · uploaded 1 Feb 2024View
  • Declaration in FORM BSunrise Form-B.pdf · uploaded 1 Feb 2024View
  • Other – LegalIndex2 Sale Deed.pdf · uploaded 1 Feb 2024View
  • Copy of Layout Approval (in case of layout)PLAN SUNRISE (1).pdf · uploaded 1 Feb 2024View
  • Other – FinancePropertier Declaration.pdf · uploaded 1 Feb 2024View
  • Other – TechnicalSunrise Annexure -A.pdf · uploaded 15 Feb 2024View
  • Other – TechnicalCC Verification.pdf · uploaded 15 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 10-07-24.pdf · uploaded 19 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 10-07-24.pdf · uploaded 19 Jan 2025View
  • Disclosure of sold/ booked inventorySold 30-06-24.pdf · uploaded 19 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 09-10-24.pdf · uploaded 19 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 09-10-24.pdf · uploaded 19 Jan 2025View
  • Disclosure of sold/ booked inventorySold 30-09-24.pdf · uploaded 19 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 02-01-25.pdf · uploaded 19 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 02-01-25.pdf · uploaded 19 Jan 2025View
  • Disclosure of sold/ booked inventorySold 31-12-24.pdf · uploaded 19 Jan 2025View

Promoter documents

  • Legal Title reportSunrise Search Report_compressed.pdf · uploaded 1 Feb 2024View
  • Declaration Form BSunrise Form-B.pdf · uploaded 1 Feb 2024View

Technical documents

  • Building Plan ApprovalPLAN SUNRISE (1).pdfView
  • Layout ApprovalPLAN SUNRISE (1).pdfView

Other legal documents

  • Other – LegalIndex2 Sale Deed.pdfView

Financial documents

  • Other – FinancePropertier Declaration.pdf · uploaded 1 Feb 2024View

Proforma allotment letter

  • Proforma allotment letter9 Model Form of Allottment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

8 GUT NO 99 PART SATARA TQPLOT NO 5

As published on MahaRERA's project page

PLOT NO 5 AND 8 GUT NO 99 PART SATARA TQ AND DIST AURANGABAD

Boundaries

North
Plot No 8
South
9 Meter Wide Road
East
Plot No 6
West
6 Meter Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectEr ADIL MUQEED SHAIKH—
Chartered accountantSudarshan Karwa & Co—
EngineerEr ADIL MUQEED SHAIKH—

Source: MahaRERA project page. Contact details are not shown.