Aurangabad (M Corp.), Aurangabad 431136 |Promoter: Laxmibai Shankar Ghatge

Residential / Group HousingRERAP51500020577
26 Apr 2019Registered with MahaRERA
1 May 2026Promised completion
5Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
5
Land area for this project
3,151 sq m (33,915 sq ft)
Permissible built-up area
3,466 sq m (37,306 sq ft)
Sanctioned built-up area
3,179 sq m (34,223 sq ft)
Planning authority
City & Industrial Development Corporation of Maharashtra ltd
Address
Plot No. 1/ Gut No. 51 Part, Golwaadi, AurangabadPIN 431136
Designated bank account
The Cosmos Co Operative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.84895, 75.27689
Shubharambh is at latitude 19.84895, longitude 75.27689.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 May 2026

The latest completion date on record passed 5 months ago.

Registered
26 Apr 2019
Promised
1 May 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002057726 Apr 20191 May 2026—Laxmibai Shankar GhatgeProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
D Wing3—
E Wing3—
Shubharambh A Wing3—
Shubharambh B Wing3—
Shubharambh C Wing3—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
D WingClosed/Covered63009
D WingOpen Space00000
E WingStilt / Ground63009
Shubharambh A WingClosed/Covered880016
Shubharambh A WingOpen Space00000
Shubharambh B WingClosed/Covered870015
Shubharambh B WingOpen Space00000
Shubharambh C WingClosed/Covered44008
Shubharambh C WingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

D Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

E Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)Not applicable
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Shubharambh A Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Shubharambh B Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Shubharambh C Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsONLY PAVED SURFACE IN TREMIX CONCRETE NO FOOT PATH0%
  • Water SupplyTROUGH BORE WELL AND AUTHORITY WATER SUPPLY0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBERS70%
  • Storm Water DrainsDRAINAGE LINES SEPTIC TANK NO STPNot applicable
  • Landscaping & Tree Planting0%
  • Street LightingONLY TREE PLANTATION15%
  • Community Buildings0Not applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER MANDATORY CONDITIONS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER DRAWINGS OF CONSULTANTS100%
  • Aggregate area of recreational Open SpaceAS PER DESIGN BY ARCHITECT0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

95 documents held by Deedo, 113 filings listed on MahaRERA's project page

Allotment letter

Others

Registration certificate

Document library

  • Copy of the legal title reportLegal report_Final.pdf · uploaded 17 Apr 2019View
  • Details of encumbrancesEncumbrance certificate.pdf · uploaded 17 Apr 2019View
  • Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 17 Apr 2019View
  • Proforma of Allotment letterproforma_allotment_letter.pdf · uploaded 17 Apr 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 17 Apr 2019View
  • Declaration in FORM BFORM B_compressed.pdf · uploaded 17 Apr 2019View
  • Building Plan Approval (IOD)A wing_compressed.pdf · uploaded 17 Apr 2019View
  • Building Plan Approval (IOD)B wing_compressed.pdf · uploaded 17 Apr 2019View
  • Building Plan Approval (IOD)C wing_compressed.pdf · uploaded 17 Apr 2019View
  • Building Plan Approval (IOD)D wing_compressed.pdf · uploaded 17 Apr 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arct Certificate Final.pdf · uploaded 17 Apr 2019View
  • Proforma of Allotment letterRERA_Agreement_for_Sale_Format.pdf · uploaded 17 Apr 2019View
  • Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 11 Oct 2021View
  • Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 14 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Cert 181021.pdf · uploaded 18 Oct 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cert 181021.pdf · uploaded 18 Oct 2021View
  • a Details of encumbrances concerned to FinanceEncumbrance To Legal.pdf · uploaded 15 Feb 2023View
  • b Details of encumbrances concerned to LegalEncumbrance To Legal.pdf · uploaded 15 Feb 2023View
  • Declaration about Commencement CertificateDeclaration of Commencement Cet.pdf · uploaded 15 Feb 2023View
  • Disclosure of sold/ booked inventorySold Unsold 31-03-2022.pdf · uploaded 15 Feb 2023View
  • Disclosure of sold/ booked inventorySold Unsold Inventory 31-12-2022.pdf · uploaded 15 Feb 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration.pdf · uploaded 15 Feb 2023View
  • Deviation Report with respect to Allotment letterDeviation of Allotment Letter.pdf · uploaded 15 Feb 2023View
  • Deviation Report with respect to model copy of AgreementDeviation of Agreement to sale.pdf · uploaded 15 Feb 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 15 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect 31-03-2022_compressed.pdf · uploaded 15 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect 31-03-2022_compressed.pdf · uploaded 15 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect 31-12-2022_compressed.pdf · uploaded 15 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers 31-3-2022_compressed.pdf · uploaded 15 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers 31-12-2022_compressed.pdf · uploaded 15 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A 19-20.pdf · uploaded 15 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A 20-21.pdf · uploaded 15 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22.pdf · uploaded 15 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Laxmibai Ghatge 19-20.pdf · uploaded 18 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Laxmibai Ghatge 20-21.pdf · uploaded 18 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Laxmibai Ghatge 21-22.pdf · uploaded 18 Feb 2023View
  • Form 1Architect 30-06-2022.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2022-23.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-06-2022.pdf · uploaded 13 Dec 2025View
  • Form 1Architect 30-09-22.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2022-23.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-09-2022.pdf · uploaded 13 Dec 2025View
  • Form 1Architect 31-12-2022.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2022-23.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-09-2022.pdf · uploaded 13 Dec 2025View
  • Form 1Architect 31-03-2023.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2022-23.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 31-03-2023.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2023-24 Q1.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2023-24 Q1.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-06-2023.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2023-24 Q2.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2023-24 Q2.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-09-2023.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2023-24 Q3.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2023-24 Q3.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 31-12-2023.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2023-24 Q4.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2023-24 Q4.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 31-03-2024.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2024-25 Q1.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2024-25 Q1.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-06-2024.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2024-25 Q2.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2024-25 Q2.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-09-2024.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2024-25 Q3.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2024-25 Q3.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 31-12-2024.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2024-25 Q4.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2024-25 Q4.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 31-03-2025.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2025-26 Q1.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2025-26 Q1.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-06-2025.pdf · uploaded 13 Dec 2025View
  • Form 1Form 1 2025-26 Q2.pdf · uploaded 13 Dec 2025View
  • Form 2Form 2 2025-26 Q2.pdf · uploaded 13 Dec 2025View
  • Disclosure of Sold and Booked InventorySold unsold 30-09-2025.pdf · uploaded 13 Dec 2025View
  • Withdrawal Update Form 1Form 1 2025-26 Q3.pdf · uploaded 12 Feb 2026View
  • Withdrawal Update Form 2Form 2 2025-26 Q3.pdf · uploaded 12 Feb 2026View
  • Withdrawal Update Form 1Form 1 Q4.pdf · uploaded 19 May 2026View
  • Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 19 May 2026View
  • Form 5 (FY 2024-2025)Form 5 24-25.pdf · uploaded 23 Jun 2026View
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 19 Aug 2026View
  • Form 5 (FY 2025-2026)Form 5.pdf · uploaded 20 Aug 2026View
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 20 Aug 2026View
  • Withdrawal Update Form 1Form 1 Q4.pdf · uploaded 20 Aug 2026View
  • Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 20 Aug 2026View

Promoter documents

  • Legal Title reportLegal report_Final.pdf · uploaded 17 Apr 2019View
  • Declaration Form BFORM B_compressed.pdf · uploaded 17 Apr 2019View
  • Legal Title reportsearch report 1.pdf · uploaded 23 Jun 2026View
  • Land Ownership DocumentRegistry Original.pdf · uploaded 26 Jun 2026View
  • Land Ownership Document7-12 latest.pdf · uploaded 26 Jun 2026View

Technical documents

  • Layout ApprovalLayout_compressed.pdfView
  • Building Plan ApprovalA wing_compressed.pdfView
  • Building Plan ApprovalB wing_compressed.pdfView
  • Building Plan ApprovalC wing_compressed.pdfView
  • Building Plan ApprovalD wing_compressed.pdfView
  • Building Plan ApprovalBuildingh Plam.pdfView
  • Building Plan Approval1 Revised Lay out_U_1.pdfView
  • Building Plan Approval6 E Wing plan_u.pdfView
  • Building Plan Approval5 D Wing plan.pdfView
  • Building Plan Approval4 C Wing plan.pdfView
  • Building Plan Approval3 B Wing plan.pdfView
  • Building Plan Approval2 A Wing Plan.pdfView
  • Building Plan Approval1 Revised Lay out_U_1.pdfView
  • Building Plan ApprovalA Wing Plan_1.pdfView
  • Building Plan ApprovalB Wing_1.pdfView
  • Building Plan ApprovalC wing.pdfView
  • Building Plan ApprovalD Wing.pdfView
  • Building Plan ApprovalE Wing.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterRERA_Agreement_for_Sale_Format.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOT NO. 1/ GUT NO. 51 PART

As published on MahaRERA's project page

PLOT NO. 1/ GUT NO. 51 PART

Boundaries

North
Gut No 51 Part
South
Gut No 52 And 53
East
Cidco Acquired Road
West
Gut No 80

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Sharad Gawali & Associates—
ArchitectDream House Associate—
Chartered accountantSngp & Co—
EngineerDream House Associate—
EngineerEtgard Consultants—

Source: MahaRERA project page. Contact details are not shown.