Shriram Park

Completed

Aurangabad (M Corp.), Aurangabad 431002 |Promoter: Unique Builders

Residential / Group HousingRERAP51500000615
18 Jul 2017Registered with MahaRERA
15 Oct 2022Promised completion
3Buildings
92Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Unit types
2 BHK, 2BHK, 1BHK92 units in all
Land area for this project
3,950 sq m (42,517 sq ft)
Permissible built-up area
4,345 sq m (46,769 sq ft)
Sanctioned built-up area
4,148 sq m (44,643 sq ft)
Recreational open space
403 sq m (4,337 sq ft)
Address
40PIN 431002
Designated bank account
Union Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.14745, 78.96841
Shriram Park is at latitude 21.14745, longitude 78.96841.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Oct 2022

The latest completion date on record passed 4 years ago.

Registered
18 Jul 2017
Promised
15 Oct 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000061518 Jul 201715 Oct 2022—Unique BuildersProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Ab532
Cd532
Ef528

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

92 units registered

2 BHK · 18 units2BHK · 42 units1BHK · 32 units
BuildingTypeCarpet areaUnits
Ab2 BHK48.56 sq m · 523 sq ft4
Ab2BHK46.69 sq m · 503 sq ft16
Ab2BHK47.89 sq m · 515 sq ft12
Cd1BHK32.68 sq m · 352 sq ft8
Cd1BHK33.65 sq m · 362 sq ft8
Cd1BHK35.28 sq m · 380 sq ft8
Cd1BHK36.4 sq m · 392 sq ft8
Ef2 BHK47.89 sq m · 515 sq ft10
Ef2 BHK48.56 sq m · 523 sq ft4
Ef2BHK46.69 sq m · 503 sq ft14

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
AbClosed/Covered000030
AbOpen Space00000
CdClosed/Covered000020
CdOpen Space00000
EfClosed/Covered000030
EfOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Ab

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Cd

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Ef

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsONLY PAVED SURFACE IN TREMIX CONCRETE. NO FOOTPATH100%
  • Water SupplyTHROUGH OPEN WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBERS DRAINAGE LINES SEPTIC TANK NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER DRAWING OF CONSULTANT100%
  • Street LightingAS PER DRAWING OF CONSULTANT100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER DRAWING OF CONSULTANT100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER DRAWING OF CONSULTANT100%
  • Aggregate area of recreational Open Space402.88 SqM100%
  • Open ParkingNot applicable
  • Compound Wall Entrance GateAS PER DRAWING OF CONSULTANT100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

35 documents held by Deedo, 46 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportTitle Search Report.PDF · uploaded 13 Jul 2017View
  • Details of encumbrancesNo Encumbrance.PDF · uploaded 13 Jul 2017View
  • Declaration in FORM BForm-B Affidavit Cum Declaration of Promoter.PDF · uploaded 13 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)( Form 1 ) Architect Certificate.PDF · uploaded 13 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 13 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)( Form -2 ) Engineer Certificate.PDF · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)Layout Plan.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)Building AB Plan.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)Building CD Plan.pdf · uploaded 13 Jul 2017View
  • Building Plan Approval (IOD)Building EF Plan.pdf · uploaded 13 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 15 Jul 2017View
  • Proforma of Allotment letterDraft of Agreement To Sale Allotment Letter.pdf · uploaded 15 Jul 2017View
  • Details of encumbrancesNo Encumbrances.PDF · uploaded 8 Nov 2017View
  • Declaration in FORM BForm-B.PDF · uploaded 8 Nov 2017View
  • Proforma of Allotment letterDraft of Agreement To Sale ( Revised ).pdf · uploaded 8 Nov 2017View
  • Copy of the legal title report41117 Title Search Report.PDF · uploaded 8 Nov 2017View
  • Copy of the legal title report41117 Title Search Reportt.pdf · uploaded 8 Nov 2017View
  • Certificates of CA (Form 5)Form No5.pdf · uploaded 29 Sep 2018View
  • OtherPart Completion Certificate.pdf · uploaded 22 Feb 2019View
  • Other1 3.pdf · uploaded 22 Feb 2019View
  • Other2 3.pdf · uploaded 22 Feb 2019View
  • Other3 3.pdf · uploaded 22 Feb 2019View
  • Certificates of CA (Form 5)CA Form No 5.pdf · uploaded 11 Oct 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Architect Certificat.pdf · uploaded 15 Nov 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Occupancy Certificate.pdf · uploaded 14 Feb 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development1 2 Layout.pdf · uploaded 14 Feb 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development2 2 EF Building Plan.pdf · uploaded 14 Feb 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Society Registration Certificate.pdf · uploaded 16 Sep 2020View
  • Status of ConveyanceCDeed Page 1 To 100.pdf · uploaded 22 Feb 2022View
  • Status of ConveyanceCDeed Page 101 To 200.pdf · uploaded 22 Feb 2022View
  • Status of ConveyanceCDeed 201 To 239.pdf · uploaded 22 Feb 2022View

Promoter documents

  • Legal Title reportTitle Search Report.PDF · uploaded 13 Jul 2017View
  • Declaration Form BForm-B Affidavit Cum Declaration of Promoter.PDF · uploaded 13 Jul 2017View
  • Declaration Form BForm-B.PDF · uploaded 8 Nov 2017View
  • Legal Title report41117 Title Search Report.PDF · uploaded 8 Nov 2017View
  • Legal Title report41117 Title Search Reportt.pdf · uploaded 8 Nov 2017View

Technical documents

  • Building Plan ApprovalLayout Plan.pdfView
  • Building Plan ApprovalBuilding AB Plan.pdfView
  • Building Plan ApprovalBuilding CD Plan.pdfView
  • Building Plan ApprovalBuilding EF Plan.pdfView
  • Layout ApprovalLayout Plan.pdfView

Other legal documents

  • OtherPart Completion Certificate.pdfView
  • Other1 3.pdfView
  • Other2 3.pdfView
  • Other3 3.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft of Agreement To Sale Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

40

As published on MahaRERA's project page

40

Boundaries

North
Remaining Part Of Gut No 40 And Layout
South
Land Gut No 36
East
Land Gut No 39
West
Remaining Part Of Gut No 40

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Nandkumar Ausekar—
EngineerRajesh Baliram Vargantwar—
OtherGajanand Jodaram Jangid—
OtherMilind Madhukarrao Wadekar—
OtherSarangdhar Ramnath Khedkar—
OtherShrikant Duhsasan Pradhan—

Source: MahaRERA project page. Contact details are not shown.