Shrinivas

Lapsed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Darshan Vatge

14 Mar 2022Registered with MahaRERA
30 Dec 2025Promised completion
1Building
13Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Lapsed
Buildings
1
Unit types
2BHK, 3BHK, Office space, Shop13 units in all
Land area for this project
413 sq m (4,448 sq ft)
Permissible built-up area
1,051 sq m (11,314 sq ft)
Sanctioned built-up area
1,051 sq m (11,314 sq ft)
Address
Plot No 15 SR No 17/1/A, Kalptaru Hos Soc, GarkhedaPIN 431001
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86525, 75.35497
Shrinivas is at latitude 19.86525, longitude 75.35497.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2025

The latest completion date on record passed 10 months ago.

Registered
14 Mar 2022
Promised
30 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150003393514 Mar 202230 Dec 2025—Darshan VatgeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shrinivas813

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

13 units registered

2BHK · 4 units3BHK · 4 unitsOffice space · 2 unitsShop · 3 units
TypeCarpet areaUnits
2BHK61.39 sq m · 661 sq ft4
3BHK92.61 sq m · 997 sq ft4
Office space28.01 sq m · 301 sq ft1
Office space29 sq m · 312 sq ft1
Shop32.14 sq m · 346 sq ft3

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shrinivas

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)00%
  • Storm Water Drains00%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

26 documents held by Deedo, 42 filings listed on MahaRERA's project page

Encumbrance details

Commencement certificate (2)

Form 1

Form 2

Title report

Form B

Other (14)

Show all 68 documentsShow fewer documents

Other (14)

Registration certificate

Form 2A

Layout plan

Building plan

Allotment letter

Document library

  • Details of encumbrancesDetails Of Encumbrances.pdf · uploaded 19 Feb 2022View
  • Copy of Layout Approval (in case of layout)NA.pdf · uploaded 19 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentPermission Shrinivasinfra Drawing (1).PDF · uploaded 19 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 19 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE.pdf · uploaded 19 Feb 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERT.pdf · uploaded 19 Feb 2022View
  • Copy of the legal title reportSR SHRINIVAS INFRA SCAN .pdf · uploaded 7 Mar 2022View
  • CERSAI detailsCERSAI_Search_Report_200231544146_For_Debtor_Based_Search_03_03_2022_17_51_54_110.pdf · uploaded 7 Mar 2022View
  • Copy of the legal title reportSR SHRINIVAS INFRA SCAN .pdf · uploaded 7 Mar 2022View
  • CERSAI detailsCERSAI_Search_Report_200231544146_For_Debtor_Based_Search_03_03_2022_17_51_54_110.pdf · uploaded 7 Mar 2022View
  • Declaration about Commencement CertificateForm A.pdf · uploaded 7 Mar 2022View
  • Declaration in FORM BForm B - Darshan Vatge _compressed.pdf · uploaded 7 Mar 2022View
  • Proforma of Allotment letterSale Agreement_compressed.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_1.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_2.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_3.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_4.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_5.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_6.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_7.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_8.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_9.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_10.pdf · uploaded 8 Mar 2022View
  • OtherDevelopment Agreement Shrinivas Infra_11.pdf · uploaded 8 Mar 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Structure Rera (1).pdf · uploaded 4 Mar 2024View

Promoter documents

  • Legal Title reportSR SHRINIVAS INFRA SCAN .pdf · uploaded 7 Mar 2022View
  • Legal Title reportSR SHRINIVAS INFRA SCAN .pdf · uploaded 7 Mar 2022View
  • Declaration Form BForm B - Darshan Vatge _compressed.pdf · uploaded 7 Mar 2022View

Technical documents

  • Layout ApprovalNA.pdfView
  • NA Order for Plotted DevelopmentPermission Shrinivasinfra Drawing (1).PDFView

Other legal documents

  • OtherDevelopment Agreement Shrinivas Infra_1.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_2.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_3.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_4.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_5.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_6.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_7.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_8.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_9.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_10.pdfView
  • OtherDevelopment Agreement Shrinivas Infra_11.pdfView

Proforma allotment letter

  • Proforma allotment letterSale Agreement_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

15Plot No 15 SR No 17/1/A

As published on MahaRERA's project page

Plot No 15 SR No 17/1/A

Boundaries

North
Plot no 14
South
Road
East
15 Mts Road
West
Open Space and road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPawan Patharikar—
Chartered accountantSachin B Deshmukh—
EngineerAakash Pathrikar—
OtherArrif—
OtherB N Kotagale—
OtherMahesh Kumar Chodhari—
OtherNikhil Ambilwade—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology