Shri Gurudatta Apartment

Completed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Manjusha Pande

Residential / Group HousingRERAP51500003468
5 Aug 2017Registered with MahaRERA
31 Dec 2019Promised completion
1Building
13Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1 BHk, 2 BHK13 units in all
Land area for this project
396 sq m (4,263 sq ft)
Permissible built-up area
840 sq m (9,046 sq ft)
Sanctioned built-up area
840 sq m (9,046 sq ft)
Address
Plot No 5 CTS 15843/7, Shanoormiya Durga Road, Chetna NagarPIN 431005
Designated bank account
Punjab National Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.85050, 75.35210
Shri Gurudatta Apartment is at latitude 19.85050, longitude 75.35210.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2019

The latest completion date on record passed 6 years and 10 months ago.

Registered
5 Aug 2017
Promised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000034685 Aug 201731 Dec 2019—Manjusha PandeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shree Gurudatta Apartment713

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

13 units registered

1 BHk · 3 units2 BHK · 10 units
TypeCarpet areaUnits
1 BHk35.6 sq m · 383 sq ft3
2 BHK42.75 sq m · 460 sq ft5
2 BHK48.7 sq m · 524 sq ft5

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shree Gurudatta Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFrom Muncipal Corporation100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Drainage Connection till Muncipal Chember100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 24 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)Building Plan compress.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)Comm Certificate.pdf · uploaded 28 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentComm Certificate.pdf · uploaded 28 Jul 2017View
  • Copy of the legal title reportLegal Report.pdf · uploaded 29 Jul 2017View
  • Details of encumbrancesNo Enc.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterATS.pdf · uploaded 30 Jul 2017View
  • Declaration in FORM BPromoter.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect.pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 28 Mar 2018View
  • Building Plan Approval (IOD)Revised Permission.pdf · uploaded 28 Mar 2018View
  • Architect’s Certificate on Completion of Project (Form 4)Guru Apt Completion.pdf · uploaded 30 Dec 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGuru Apt Completion.pdf · uploaded 30 Dec 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFORM 4 GURUDATTA APT.pdf · uploaded 6 Mar 2020View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 GURUDATTA APT.pdf · uploaded 6 Mar 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 GURUDATTA APT.pdf · uploaded 6 Mar 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development13052022185458.pdf · uploaded 19 Jul 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentEpson251_compressed.pdf · uploaded 19 Jul 2022View

Promoter documents

  • Legal Title reportLegal Report.pdf · uploaded 29 Jul 2017View
  • Declaration Form BPromoter.pdf · uploaded 30 Jul 2017View

Technical documents

  • Building Plan ApprovalComm Certificate.pdfView
  • Layout ApprovalBuilding Plan compress.pdfView
  • Building Plan ApprovalRevised Permission.pdfView

Proforma allotment letter

  • Proforma allotment letterATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

15843/75Plot No 5 CTS 15843/7

As published on MahaRERA's project page

Plot No 5 CTS 15843/7

Boundaries

North
CTS No 15843-8
South
CTS no 15843
East
15 M Wide Road
West
CTS No 15843-12 and layout Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGagan Gangwal—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology