Shri Durganand Heights

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Babulal Punjaji Magar

30 Nov 2017Registered with MahaRERA
20 Dec 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
680 sq m (7,319 sq ft)
Permissible built-up area
1,984 sq m (21,354 sq ft)
Sanctioned built-up area
944 sq m (10,159 sq ft)
Address
Survey No 17-1-APIN 431001
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.31047, 72.85404
Shri Durganand Heights is at latitude 19.31047, longitude 72.85404.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 20 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
30 Nov 2017
Promised
20 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001442430 Nov 201720 Dec 2022—Babulal Punjaji MagarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shri Durganand Heights7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shri Durganand Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFrom Corporation100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Drainage line till Corporation Chamber100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS BY AUTHORITY100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per requirement of Authority100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

20 documents held by Deedo, 21 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSearch Report1.pdf · uploaded 23 Nov 2017View
  • Copy of the legal title reportSearch Report2.pdf · uploaded 23 Nov 2017View
  • Copy of the legal title reportSearch Report3.pdf · uploaded 23 Nov 2017View
  • Copy of Layout Approval (in case of layout)IMG_382.pdf · uploaded 23 Nov 2017View
  • Details of encumbrancesComplete Search Report.pdf · uploaded 23 Nov 2017View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 23 Nov 2017View
  • Commencement Certificates / NA Order for plotted developmentCC (2).pdf · uploaded 23 Nov 2017View
  • Building Plan Approval (IOD)IMG_383.pdf · uploaded 23 Nov 2017View
  • Declaration in FORM BDeveloper B-compressed.pdf · uploaded 24 Nov 2017View
  • Proforma of Allotment letterNO ATS.pdf · uploaded 24 Nov 2017View
  • Certificates of CA (Form 5)FORM 5.pdf · uploaded 20 Nov 2018View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5_BABULAL MAGAR.pdf · uploaded 5 Dec 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC .pdf · uploaded 9 Feb 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Shri Durganand.pdf · uploaded 9 Feb 2024View

Promoter documents

  • Legal Title reportSearch Report1.pdf · uploaded 23 Nov 2017View
  • Legal Title reportSearch Report2.pdf · uploaded 23 Nov 2017View
  • Legal Title reportSearch Report3.pdf · uploaded 23 Nov 2017View
  • Declaration Form BDeveloper B-compressed.pdf · uploaded 24 Nov 2017View

Technical documents

  • Layout ApprovalIMG_382.pdfView
  • Building Plan ApprovalIMG_383.pdfView

Proforma allotment letter

  • Proforma allotment letterNO ATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

SURVEY NO 171A

As published on MahaRERA's project page

SURVEY NO 17-1-A

Boundaries

North
30 M Wide Road
South
6 M Wide Road And Plot No 7
East
Land Of Parvej Shaikh
West
Plot No 2-A And Plot No 5

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSakhare Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology