Shreeji Tower Residential

Lapsed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Manali & Company

Residential / Group HousingRERAP51500003486
5 Aug 2017Registered with MahaRERA
3 Jul 2019Promised completion
30 Sep 2023Revised completionPushed back 4 years and 2 months
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
900 sq m (9,688 sq ft)
Permissible built-up area
532 sq m (5,722 sq ft)
Sanctioned built-up area
532 sq m (5,722 sq ft)
Address
06 to 08/70, Cidco roadPIN 431001
Designated bank account
Uco Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13725, 79.05886
Shreeji Tower Residential is at latitude 21.13725, longitude 79.05886.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 years and 2 months

The latest completion date on record passed 3 years and 1 month ago.

Registered
5 Aug 2017
Promised
3 Jul 2019
Revised
30 Sep 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000034865 Aug 20173 Jul 201930 Sep 2023Manali & CompanyProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shreeji Tower4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00006
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shreeji Tower

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWater Line from AMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Connect to Amc line by devloper100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per guidlines of AMC100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per guidlines of AMC100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 19 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Building Plan Approval (IOD)Plan 2.PDF · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement.PDF · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)Occupany commercial.PDF · uploaded 30 Jul 2017View
  • Copy of the legal title reportlegal Certificate.PDF · uploaded 31 Jul 2017View
  • Details of encumbrancesencumbrance.PDF · uploaded 31 Jul 2017View
  • Declaration in FORM Bform B.PDF · uploaded 31 Jul 2017View
  • Proforma of Allotment letteragreement 1.PDF · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect.PDF · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng Certificate.PDF · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)layout.PDF · uploaded 31 Jul 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 17-18.pdf · uploaded 9 Mar 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Phase I Manali.pdf · uploaded 9 Mar 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Phase I Manali.pdf · uploaded 19 Mar 2024View

Promoter documents

  • Legal Title reportlegal Certificate.PDF · uploaded 31 Jul 2017View
  • Declaration Form Bform B.PDF · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalPlan 2.PDFView
  • Building Plan ApprovalOccupany commercial.PDFView
  • Layout Approvallayout.PDFView

Proforma allotment letter

  • Proforma allotment letteragreement 1.PDFView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

06 to 08/70

As published on MahaRERA's project page

06 to 08/70

Boundaries

North
Plot No 5
South
Plot No 9
East
Plot No 21 -22- 23
West
24 mtrs DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSunil Bhale—
EngineerShrinivas L Karanjikar—
OtherHarish Tarachand Daulanpure—

Source: MahaRERA project page. Contact details are not shown.