Shivshakti Heights

Lapsed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Shivshakti Constructions

Residential / Group HousingRERAP51500050067
13 Mar 2023Registered with MahaRERA
15 Jan 2025Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
2BHK10 units in all
Land area for this project
328 sq m (3,527 sq ft)
Permissible built-up area
1,199 sq m (12,903 sq ft)
Sanctioned built-up area
838 sq m (9,023 sq ft)
Address
Plot No. 2 Cts No. 16930, Osmanpura, Aurangabad, Cts No 16930, OsmanpuraPIN 431005
Designated bank account
Kallappanna Awade Ichalkaranji Janata Sahakari Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shivshakti Heights is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Jan 2025

The latest completion date on record passed 1 year and 9 months ago.

Registered
13 Mar 2023
Promised
15 Jan 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005006713 Mar 202315 Jan 2025—Shivshakti ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shivshakti Heights810

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

2BHK · 10 units
TypeCarpet areaUnits
2BHK62.2 sq m · 670 sq ft5
2BHK63.65 sq m · 685 sq ft5

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000022

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shivshakti Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor25%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFROM CORPORATION AS PER AVAILABLITY0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DRAINAGE LIE TILL CORPORATION LINE0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting As per Norms0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title report

Encumbrance details (3)

Commencement certificate (2)

Other (9)

Show all 44 documentsShow fewer documents

Other (9)

Allotment letter (2)

Form B

Registration certificate

Layout plan

Building plan

Document library

  • a Details of encumbrances concerned to FinanceNO FIN_page-0001.pdf · uploaded 21 Feb 2023View
  • b Details of encumbrances concerned to LegalNO FIN_page-0001.pdf · uploaded 21 Feb 2023View
  • Declaration about Commencement CertificateFORMAT D.pdf · uploaded 21 Feb 2023View
  • Deviation Report with respect to Allotment letterALLOTMENT LETTER.pdf · uploaded 21 Feb 2023View
  • Deviation Report with respect to model copy of AgreementAGREE TO SALE.pdf · uploaded 21 Feb 2023View
  • Building Plan Approval / NA Order for plotted developmentPlan Final.pdf · uploaded 21 Feb 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Shivshakti.pdf · uploaded 21 Feb 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A MR Sunil.pdf · uploaded 21 Feb 2023View
  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 21 Feb 2023View
  • a Details of encumbrances concerned to FinanceNO ENC LEGAL.pdf · uploaded 21 Feb 2023View
  • b Details of encumbrances concerned to LegalNO ENC LEGAL.pdf · uploaded 21 Feb 2023View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 21 Feb 2023View
  • Copy of Layout Approval (in case of layout)Plan_compressed.pdf · uploaded 21 Feb 2023View
  • Proforma of Allotment letterAllotment Letter Annexure 1_compressed.pdf · uploaded 21 Feb 2023View
  • Declaration in FORM BForm - B (Shivshakti).pdf · uploaded 22 Feb 2023View
  • Proforma of Agreement for saleProforma of Agreement for Sale.pdf · uploaded 22 Feb 2023View
  • CERSAI detailsNew Cersai.pdf · uploaded 22 Feb 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsPratibha Patil annexure A.pdf · uploaded 1 Mar 2023View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 21 Feb 2023View
  • Declaration Form BForm - B (Shivshakti).pdf · uploaded 22 Feb 2023View

Technical documents

  • Building Plan ApprovalPlan Final.pdfView
  • Layout ApprovalPlan_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter Annexure 1_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

169302PLOT NO. 2 CTS NO. 16930

As published on MahaRERA's project page

PLOT NO. 2 CTS NO. 16930, OSMANPURA, AURANGABAD

Boundaries

North
Cts No 16929
South
Cts No 16931
East
6 Meter Wide Road
West
Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArch Dhananjay Doifode—
Chartered accountantSudarshan Karwa and CO—
EngineerPradeep Mote—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology