Sara Gokuldham - A Building

Completed

Aurangabad (M Corp.), Aurangabad 431007 |Promoter: Jagrutsara Structures LLP

Residential / Group HousingRERAP51500003721
6 Aug 2017Registered with MahaRERA
15 Feb 2021Promised completion
1Building
40Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3 BHK40 units in all
Land area for this project
1,823 sq m (19,623 sq ft)
Permissible built-up area
3,191 sq m (34,348 sq ft)
Sanctioned built-up area
3,191 sq m (34,348 sq ft)
Address
Gut No. 701, Airport Road, ChikalthanaPIN 431007
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86729, 75.40050
Sara Gokuldham - A Building is at latitude 19.86729, longitude 75.40050.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Feb 2021

The latest completion date on record passed 5 years and 8 months ago.

Registered
6 Aug 2017
Promised
15 Feb 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000037216 Aug 201715 Feb 2021—Jagrutsara Structures LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Type Building740

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

40 units registered

3 BHK · 40 units
TypeCarpet areaUnits
3 BHK74.82 sq m · 805 sq ft10
3 BHK75.05 sq m · 808 sq ft20
3 BHK76.71 sq m · 826 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000040
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Type Building

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsTRIMIX ROAD100%
  • Water SupplyFROM AMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER CONSULTANT100%
  • Storm Water DrainsAS PER CONSULTANT100%
  • Landscaping & Tree PlantingAS PER CONSULTANT100%
  • Street LightingAS PER CONSULTANT100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER CONSULTANT100%
  • Energy managemcntAS PER CONSULTANT100%
  • Fire protection and fire safety requirementsAS PER CONSULTANT100%
  • Electrical meter room, sub-station, receiving stationAS PER CONSULTANT100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER CONSULTANT100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

32 documents held by Deedo, 42 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesSARA GOKULDHAM INDEX.pdf · uploaded 19 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER-1-SARA GOKULDHAM.pdf · uploaded 19 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAY-OUT.pdf · uploaded 20 Jul 2017View
  • Building Plan Approval (IOD)A TYPE BUILDING TERRACE.pdf · uploaded 20 Jul 2017View
  • Building Plan Approval (IOD)A TYPE BUILDING.pdf · uploaded 20 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCMENT LATTER GOKULDHAM A TYPE.pdf · uploaded 20 Jul 2017View
  • OtherGokuldham - Airport NOC.pdf · uploaded 24 Jul 2017View
  • Copy of the legal title reportsearch report gokuldham.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterAgreement To Sale compresed.pdf · uploaded 30 Jul 2017View
  • Declaration in FORM Bform b a type building - sara.pdf · uploaded 30 Jul 2017View
  • OtherAdditional Affidavit.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentComecement Certificate NEW.pdf · uploaded 1 Mar 2018View
  • Copy of Layout Approval (in case of layout)LAY-OUT NEW.pdf · uploaded 1 Mar 2018View
  • OtherOther (Fire NOC).pdf · uploaded 1 Mar 2018View
  • OtherAdditional Affidavit for Changes.pdf · uploaded 1 Mar 2018View
  • Building Plan Approval (IOD)BUILDING Plan 1 NEW.pdf · uploaded 1 Mar 2018View
  • Building Plan Approval (IOD)BUILDING Plan 2 NEW.pdf · uploaded 1 Mar 2018View
  • OtherAffidavit for Revised Number of Flats.pdf · uploaded 1 Mar 2018View
  • Certificates of CA (Form 5)FORM 5 SARA GOKULDHAM A BLDG.pdf · uploaded 16 Nov 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE SARA GOKULDHAM.pdf · uploaded 16 Nov 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SARA GOKULDHAM.pdf · uploaded 16 Nov 2018View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A sara gokuldham.pdf · uploaded 20 Mar 2020View
  • Declaration about Commencement CertificateDeclaration of CC - Gokuldham - A.pdf · uploaded 30 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - Gokul A_compressed.pdf · uploaded 30 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Letter.pdf · uploaded 30 Jul 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)society letter Gokuldham A.pdf · uploaded 31 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Sara Gokuldham A.pdf · uploaded 20 Dec 2022View
  • Status of ConveyanceDECLARATION DEED A TYPE BUILDING-3-31.pdf · uploaded 20 Dec 2022View

Promoter documents

  • Legal Title reportsearch report gokuldham.pdf · uploaded 30 Jul 2017View
  • Declaration Form Bform b a type building - sara.pdf · uploaded 30 Jul 2017View

Technical documents

  • Layout ApprovalLAY-OUT.pdfView
  • Building Plan ApprovalA TYPE BUILDING TERRACE.pdfView
  • Building Plan ApprovalA TYPE BUILDING.pdfView
  • Layout ApprovalLAY-OUT NEW.pdfView
  • Building Plan ApprovalBUILDING Plan 1 NEW.pdfView
  • Building Plan ApprovalBUILDING Plan 2 NEW.pdfView

Other legal documents

  • OtherGokuldham - Airport NOC.pdfView
  • OtherAdditional Affidavit.pdfView
  • OtherOther (Fire NOC).pdfView
  • OtherAdditional Affidavit for Changes.pdfView
  • OtherAffidavit for Revised Number of Flats.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER-1-SARA GOKULDHAM.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO. 701

As published on MahaRERA's project page

GUT NO. 701

Boundaries

North
Open Space Of Layout
South
C Type Building Of Same Housing Scheme
East
Internal Road
West
Land Of Airport Authorities

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand Deshpande—
EngineerNamdev Govindrao Karkhane—
OtherAmol Kshirsagar—
OtherUtkarsh Construction—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology