Sai Sankul Phase 3

Lapsed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Nilesh Suresh Kshatriya

Residential / Group HousingRERAP51500027401
8 Dec 2020Registered with MahaRERA
30 Jun 2023Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
1BHK12 units in all
Land area for this project
303 sq m (3,262 sq ft)
Permissible built-up area
456 sq m (4,908 sq ft)
Sanctioned built-up area
456 sq m (4,908 sq ft)
Address
Plot No 43 Gut No 1, Nakshatra Wadi, NakshatrawadiPIN 431005
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Sai Sankul Phase 3 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
8 Dec 2020
Promised
30 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000274018 Dec 202030 Jun 2023—Nilesh Suresh KshatriyaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sai Sankul Phase 3712

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

1BHK · 12 units
TypeCarpet areaUnits
1BHK23.94 sq m · 258 sq ft12

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sai Sankul Phase 3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyONE BOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)PROVIDED BY AMC100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingWILL BE PROVIDED BY AMC100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWILL BE COMPLETED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWILL BE COMPLETED AS COMMOR METER BOARD0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCOMPLETED80%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 21 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSEARCH_REPORT_compressed.pdf · uploaded 3 Dec 2020View
  • Details of encumbrancesNO_ENCUMBERANCE.pdf · uploaded 3 Dec 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 3 Dec 2020View
  • Commencement Certificates / NA Order for plotted developmentPERMISSION_compressed.pdf · uploaded 3 Dec 2020View
  • Building Plan Approval / NA Order for plotted developmentsanc_plan.pdf · uploaded 3 Dec 2020View
  • Declaration in FORM BFORMB_NOTERY.pdf · uploaded 3 Dec 2020View
  • Proforma of Allotment letterAGREEMENT_TO_SALE.pdf · uploaded 3 Dec 2020View
  • a Details of encumbrances concerned to FinanceNO_ENCUMBERANCE.pdf · uploaded 14 Jun 2023View
  • b Details of encumbrances concerned to LegalNO_ENCUMBERANCE.pdf · uploaded 14 Jun 2023View
  • Declaration about Commencement CertificatePERMISSION_compressed.pdf · uploaded 14 Jun 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)NSK FORM 1.pdf · uploaded 14 Jun 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)NSK Engineering certificate.pdf · uploaded 14 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)NSK FORM 2A.pdf · uploaded 14 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)NSK FORM 2A 31-03-2021.pdf · uploaded 14 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)NSK FORM -2A 31-03-2023.pdf · uploaded 14 Jun 2023View
  • CERSAI detailsNO_ENCUMBERANCE.pdf · uploaded 14 Jun 2023View

Promoter documents

  • Legal Title reportSEARCH_REPORT_compressed.pdf · uploaded 3 Dec 2020View
  • Declaration Form BFORMB_NOTERY.pdf · uploaded 3 Dec 2020View

Technical documents

  • Building Plan Approvalsanc_plan.pdfView
  • Layout ApprovalLAYOUT.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT_TO_SALE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOTNO 43 GUTNO 1

As published on MahaRERA's project page

PLOT NO 43 GUT NO 1

Boundaries

North
Plot No 44
South
Open Space
East
7 Point 6 Mtr Road
West
Plot No 37

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMr Santosh Adhav—
Chartered accountantKedar Joshi—
EngineerMr Prasad Aphale—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology