Sai Sankul Phase 1

Completed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Tirupati Builders And Developers

Residential / Group HousingRERAP51500003530
5 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK12 units in all
Land area for this project
372 sq m (4,001 sq ft)
Permissible built-up area
465 sq m (5,004 sq ft)
Sanctioned built-up area
465 sq m (5,004 sq ft)
Address
Plot No49a/50aPIN 431005
Designated bank account
Kotak Mahindra Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.15934, 72.84269
Sai Sankul Phase 1 is at latitude 19.15934, longitude 72.84269.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
5 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000035305 Aug 201731 Dec 2017—Tirupati Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sai Sankul Phase 1512

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

2BHK · 12 units
TypeCarpet areaUnits
2BHK39 sq m · 420 sq ft4
2BHK45.5 sq m · 490 sq ft8

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sai Sankul Phase 1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTO BE SUPPLIED BY AURANGABAD MUNICIPLE CORPORATION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 15 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesENC.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)GUT PLAN 1.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)BLD PLAN.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAGREEMENT.pdf · uploaded 31 Jul 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development1.pdf · uploaded 30 Sep 2019View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 31 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalGUT PLAN 1.pdfView
  • Building Plan ApprovalBLD PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

PLOT NO49A/50A

As published on MahaRERA's project page

PLOT NO49A/50A

Boundaries

North
Plot No A48
South
6m Road
East
Plot No 53 And 54
West
Rioad

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhananjay Doifode—
EngineerM B Kayande—
OtherAmol Mundhe—

Source: MahaRERA project page. Contact details are not shown.