Skip to content

Royal Trade Complex

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Royal Infrastructure

Residential / Group HousingRERAP51500018421
30 Oct 2018Registered with MahaRERA
1 Apr 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
477 sq m (5,130 sq ft)
Permissible built-up area
950 sq m (10,222 sq ft)
Sanctioned built-up area
950 sq m (10,222 sq ft)
Address
CTS No 6332, 6338, City Chouk Road, ManzurpuraPIN 431001
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Apr 2021

The latest completion date on record passed 5 years and 6 months ago.

Registered
30 Oct 2018
Promised
1 Apr 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001842130 Oct 20181 Apr 2021—Royal InfrastructureProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Royal Trade Complex6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Royal Trade Complex

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 18 filings listed on MahaRERA's project page

Title report

Form B

Form 1

Form 2

Form 5

Occupancy / completion certificate

  • Occupancy / completion certificate7 Sep 2019ViewSource

Registration certificate

Other (6)

Show all 34 documentsShow fewer documents

Other (6)

Allotment letter

Layout plan

Building plan

Document library

  • Commencement Certificates / NA Order for plotted development1.pdf · uploaded 27 Oct 2018View
  • Proforma of Allotment letter1.pdf · uploaded 28 Oct 2018View
  • Other1.pdf · uploaded 28 Oct 2018View
  • Declaration in FORM Bafiidavit.pdf · uploaded 28 Oct 2018View
  • Details of encumbrances1.pdf · uploaded 28 Oct 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 28 Oct 2018View
  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 28 Oct 2018View
  • Building Plan Approval (IOD)BUILDING PLAN.pdf · uploaded 28 Oct 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 28 Oct 2018View
  • Copy of Layout Approval (in case of layout)TOCH MAP.pdf · uploaded 28 Oct 2018View
  • Annual Audit Report of Statutory CA (Form 5)FORM NO 5 CA.pdf · uploaded 7 Sep 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY 3.pdf · uploaded 7 Sep 2019View

Promoter documents

  • Declaration Form Bafiidavit.pdf · uploaded 28 Oct 2018View
  • Legal Title reportSEARCH REPORT.pdf · uploaded 28 Oct 2018View

Technical documents

  • Building Plan ApprovalBUILDING PLAN.pdfView
  • Layout ApprovalTOCH MAP.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letter1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

633263386338CTS No 6332

As published on MahaRERA's project page

CTS No 6332, 6338

Boundaries

North
CTS No 6337
South
12 m road
East
CTS No 6333
West
Masjid

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMd Yunus—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology