Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang

Active

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Aurangabad Housing And Area Development Board ( A Regional Unit Of Mhada)

Residential / Group HousingRERAP51500054769
12 Feb 2024Registered with MahaRERA
31 Dec 2029Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
3
Land area for this project
2,036 sq m (21,913 sq ft)
Permissible built-up area
6,307 sq m (67,887 sq ft)
Sanctioned built-up area
5,307 sq m (57,123 sq ft)
Planning authority
Chhatrapati Sambhajinagar Municipal Corporation
Address
Plot No. 03, Gut No. 736/Part, Chikalthana, Aurangabad, JALNA ROAD, Plot No. 03, Gut No. 736/Part, Chikalthana, AurangabadPIN 431001
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2029

Registered
12 Feb 2024
Promised
31 Dec 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005476912 Feb 202431 Dec 2029—Aurangabad Housing And Area Development Board ( A Regional Unit Of Mhada)Project page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
L-1- Type6—
L-2-Type6—
L-3-Type6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
L-1- TypeClosed/Covered00000
L-1- TypeOpen Space1790026
L-2-TypeClosed/Covered00000
L-2-TypeOpen Space1790026
L-3-TypeClosed/Covered00000
L-3-TypeOpen Space590014

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

L-1- Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

L-2-Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure55%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

L-3-Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor50%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCORPORATION WATER SUPPLY0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)LINES0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTING0%
  • Street LightingLED0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS REQUIRED0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER RULE0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

36 documents held by Deedo, 54 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)LAYOUTchikalthana LIG 60.pdf · uploaded 21 Nov 2023View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE- CHIKALTHANA.pdf · uploaded 21 Nov 2023View
  • Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE- mhada.pdf · uploaded 21 Nov 2023View
  • CERSAI detailsUNDERTAKING NO CERSAI REPORT-mhada.pdf · uploaded 21 Nov 2023View
  • a Details of encumbrances concerned to FinanceLAND CLEARANCE CERTIFICATE- mhada.pdf · uploaded 21 Nov 2023View
  • b Details of encumbrances concerned to LegalLAND CLEARANCE CERTIFICATE- mhada.pdf · uploaded 21 Nov 2023View
  • Building Plan Approval / NA Order for plotted developmentBUILDING Permission chikalthana LIG 60.pdf · uploaded 21 Nov 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsNOT APPLICABLE.pdf · uploaded 22 Nov 2023View
  • Deviation Report with respect to Allotment letterDeviation in the Allotment Letter.pdf · uploaded 22 Nov 2023View
  • Deviation Report with respect to model copy of AgreementDeviation in the Allotment Letter and Agreement.pdf · uploaded 22 Nov 2023View
  • Copy of the legal title reportLEGAL TITLE REPORT- MHADA.pdf · uploaded 29 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1- MHADA.pdf · uploaded 29 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 A.pdf · uploaded 29 Nov 2023View
  • Proforma of Allotment letter3 Proforma of Allotment letter.pdf · uploaded 29 Nov 2023View
  • Proforma of Agreement for sale3 Proforma of Allotment letter.pdf · uploaded 29 Nov 2023View
  • a Details of encumbrances concerned to FinanceNON ENCUMBERANCE CERTIFICATE.pdf · uploaded 22 Dec 2023View
  • b Details of encumbrances concerned to LegalNON ENCUMBERANCE CERTIFICATE.pdf · uploaded 22 Dec 2023View
  • Declaration in FORM BFORM B DECLARATION.pdf · uploaded 22 Dec 2023View
  • CERSAI detailsCERSAI.pdf · uploaded 22 Dec 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Separate Bank Account for real estate projects-chikalthana.pdf · uploaded 22 Dec 2023View
  • Building Plan Approval / NA Order for plotted developmentPLAN 1.pdf · uploaded 22 Dec 2023View
  • Building Plan Approval / NA Order for plotted developmentPLAN 2.pdf · uploaded 22 Dec 2023View
  • Building Plan Approval / NA Order for plotted developmentPLAN 3.pdf · uploaded 22 Dec 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 8 Apr 2025Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 8 Apr 2025Source
  • Form 1Architect Certificate & Form 1 60 LIG.pdf · uploaded 18 Jul 2025View
  • Form 2form 2 chikalthana 60lig_0001.pdf · uploaded 18 Jul 2025View
  • Disclosure of Sold and Booked Inventory60 LIG Chikalthana.pdf · uploaded 18 Jul 2025View
  • Self-declaration of Quarterly ProgressQPR 60 Chikalthana.pdf · uploaded 18 Jul 2025View
  • Form 1Architect Certificate Form 1 60 LIG.pdf · uploaded 16 Jan 2026View
  • Form 2form 2 chikalthana 60lig_0001.pdf · uploaded 16 Jan 2026View
  • Disclosure of Sold and Booked Inventory60 LIG Chikalthana sold unsold.pdf · uploaded 16 Jan 2026View
  • Self-declaration of Quarterly Progress60.pdf · uploaded 16 Jan 2026View
  • Form 1Architect Certificate Form 1 60 LIG.pdf · uploaded 12 Feb 2026View
  • Form 2form 2 chikalthana 60lig_0001.pdf · uploaded 12 Feb 2026View
  • Self-declaration of Quarterly Progress60LIG declaration.pdf · uploaded 12 Feb 2026View
  • Disclosure of Sold and Booked Inventory60 LIG Chikalthana sold unsold.pdf · uploaded 12 Feb 2026View
  • Form 1Architect Certificate Form 1 60 LIG.pdf · uploaded 28 Apr 2026View
  • Form 2form 2 chikalthana 60lig_0001.pdf · uploaded 28 Apr 2026View
  • Disclosure of Sold and Booked Inventory60 LIG Chikalthana sold unsold.pdf · uploaded 28 Apr 2026View
  • Self-declaration of Quarterly Progressqpr declare_0001-3.pdf · uploaded 28 Apr 2026View
  • Form 160 form1_0001.pdf · uploaded 19 Aug 2026View
  • Form 260 LIG form 2_0001.pdf · uploaded 19 Aug 2026View
  • Disclosure of Sold and Booked Inventorysold booked 60 lig_0001.pdf · uploaded 19 Aug 2026View
  • Self-declaration of Quarterly Progress60 lig self declaration.pdf · uploaded 19 Aug 2026View
  • Form 2A (FY 2025-2026)Form 2.pdf · uploaded 10 Sep 2026View

Promoter documents

  • Legal Title reportLEGAL TITLE REPORT- MHADA.pdf · uploaded 29 Nov 2023View
  • Declaration Form BFORM B DECLARATION.pdf · uploaded 22 Dec 2023View

Technical documents

  • Layout ApprovalLAYOUTchikalthana LIG 60.pdfView
  • Building Plan ApprovalBUILDING Permission chikalthana LIG 60.pdfView
  • Building Plan ApprovalPLAN 1.pdfView
  • Building Plan ApprovalPLAN 2.pdfView
  • Building Plan ApprovalPLAN 3.pdfView

Proforma allotment letter

  • Proforma allotment letter3 Proforma of Allotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut No. 736/PartPlot No. 03

As published on MahaRERA's project page

Plot No. 03, Gut No. 736/Part, Chikalthana, Aurangabad

Boundaries

North
Part Land For Gut No 732
South
Part Of Gut No 737 And Govt Hospital
East
Part Of Gut No 736 And 24 Mtr Road
West
Gut No 735

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShruti Deshpande—
Chartered accountantChief Account Officer Mhada—
EngineerJ V Structureal Engineer & Consultant—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology