Prasad Nagar

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Prasad Construction

Residential / Group HousingRERAP51500006151
14 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
764 sq m (8,225 sq ft)
Permissible built-up area
759 sq m (8,168 sq ft)
Sanctioned built-up area
759 sq m (8,168 sq ft)
Recreational open space
764 sq m (8,225 sq ft)
Address
plot no 72 73 74 75, Gut no-13PIN 431001
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.06109, 72.87916
Prasad Nagar is at latitude 19.06109, longitude 72.87916.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
14 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000615114 Aug 201731 Dec 2017—Prasad ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Prasad Nagar4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Prasad Nagar

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)completed100%
  • Storm Water Drainscompleted100%
  • Landscaping & Tree Plantingcompleted100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingcompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationpartly completed100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 19 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Registration certificate

Form 5 (2)

Show all 34 documentsShow fewer documents

Form 5 (2)

Form 4

Occupancy / completion certificate

  • Occupancy / completion certificate21 Mar 2024ViewSource

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reporttitle report.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)layout approval.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterSALE DEED Prasad Nagar Kanchanwadi.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate combined.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesno encumbrance certificate.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM Bcombined form b_opt.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)building sanction plan.PDF · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 31 Jul 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)prasad construction 17-18.pdf · uploaded 30 Nov 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)parasad constricution 18-19.pdf · uploaded 30 Nov 2019View
  • Architect’s Certificate on Completion of Project (Form 4)PL_0001.pdf · uploaded 30 Nov 2019View
  • Architect’s Certificate on Completion of Project (Form 4)MAHESH_GINNING_FACTORY_0001.pdf · uploaded 30 Nov 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development2 Architect’s Certificate on Completion of Project (Form 4).pdf · uploaded 21 Mar 2024View

Promoter documents

  • Legal Title reporttitle report.pdf · uploaded 31 Jul 2017View
  • Declaration Form Bcombined form b_opt.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan Approvalbuilding sanction plan.PDFView
  • Layout Approvallayout approval.pdfView

Proforma allotment letter

  • Proforma allotment letterSALE DEED Prasad Nagar Kanchanwadi.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut no13plot no 72 73 74 75

As published on MahaRERA's project page

plot no 72 73 74 75, Gut no-13

Boundaries

North
7 meter wide road
South
open space of layout
East
Plot no-76
West
9 meter wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul S Badhe—
EngineerAbhay S Patil—

Source: MahaRERA project page. Contact details are not shown.