Skip to content
Deedo home
Menu

Parvati Enclave

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Sakshi Builders

Residential / Group HousingRERAP51500029599
11 Jun 2021Registered with MahaRERA
30 Dec 2024Promised completion
1Building
28Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3BHK28 units in all
Land area for this project
900 sq m (9,688 sq ft)
Permissible built-up area
2,768 sq m (29,794 sq ft)
Sanctioned built-up area
2,768 sq m (29,794 sq ft)
Address
Gut No 26/1 Himayatnagar Aurangabad, Jatwada Road, HimayatnagarPIN 431001
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Parvati Enclave is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
11 Jun 2021
Promised
30 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002959911 Jun 202130 Dec 2024—Sakshi BuildersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Parvati Enclave828

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

28 units registered

3BHK · 28 units
TypeCarpet areaUnits
3BHK72.5 sq m · 780 sq ft7
3BHK72.6 sq m · 781 sq ft14
3BHK73.75 sq m · 794 sq ft7

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Parvati Enclave

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot yet Started0%
  • Water SupplyNot yet Started0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not yet Started0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot yet Started0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot yet Started0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

52 documents held by Deedo, 58 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSearch report.pdf · uploaded 31 May 2021View
  • Copy of Layout Approval (in case of layout)HPSC0229.pdf · uploaded 31 May 2021View
  • Building Plan Approval / NA Order for plotted developmentHPSC0229.pdf · uploaded 31 May 2021View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 31 May 2021View
  • Declaration in FORM BForm-B.pdf · uploaded 31 May 2021View
  • Details of encumbrancesEncumbrance Declarantion.pdf · uploaded 31 May 2021View
  • Proforma of Allotment letterAgreement to Sale Pravati enclave Apartment.pdf · uploaded 31 May 2021View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 31 May 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A Parvati Enclave june 2021.pdf · uploaded 7 Aug 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sakshi Builders Arch.pdf · uploaded 30 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sakshi Builders Eng.pdf · uploaded 30 Aug 2021View
  • Details of encumbrancesIndex 2.pdf · uploaded 16 Sep 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)'' paravti enclave '' Legal Entity.pdf · uploaded 17 Sep 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Parvati Enclave.pdf · uploaded 17 Sep 2021View
  • Declaration about Commencement CertificatePARVATI CC DECLA.pdf · uploaded 17 Sep 2021View
  • Disclosure of sold/ booked inventoryPARVATI SOLD.pdf · uploaded 17 Sep 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A Parvati Sep 21.pdf · uploaded 21 Oct 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cer Sep 21.pdf · uploaded 29 Nov 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cer Sep 21.pdf · uploaded 29 Nov 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 30 Jun 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Enggi Certi.pdf · uploaded 30 Jun 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Enggi Certi.pdf · uploaded 30 Jun 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A.pdf · uploaded 30 Jun 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A.pdf · uploaded 30 Jun 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 30 Jun 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Enggi Certificate.pdf · uploaded 30 Jun 2022View
  • Disclosure of sold/ booked inventoryParvati Enclave Book Inventory 30-9-21.pdf · uploaded 17 Sep 2022View
  • Disclosure of sold/ booked inventoryParvati Enclave Book Inventory 31-12-21.pdf · uploaded 17 Sep 2022View
  • Disclosure of sold/ booked inventoryParvati Enclave Book Inventory 31-03-22.pdf · uploaded 17 Sep 2022View
  • Disclosure of sold/ booked inventoryParvati Enclave Book Inventory 30-6-22.pdf · uploaded 17 Sep 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certi.pdf · uploaded 10 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certi form 2.pdf · uploaded 10 Oct 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quility Assurance .pdf · uploaded 10 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate_Parvati Enclave.pdf · uploaded 18 Nov 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_Parvati Enclave.pdf · uploaded 18 Nov 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate_Parvati Enc (Sakshi Builders).pdf · uploaded 18 Nov 2022View
  • Disclosure of sold/ booked inventorySold-Unsold Inventory of RERA_Parvati Enc_30-09-2022.pdf · uploaded 29 Nov 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form - 5 - Sakshi Builders- Date 10-12-2022-29599.pdf · uploaded 7 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate_Parvati EnclaveSakshi Builders.pdf · uploaded 14 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate_Parvati Enclave_07-01-2023.pdf · uploaded 13 May 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_Parvati Enclave_06-01-2023.pdf · uploaded 13 May 2023View
  • Disclosure of sold/ booked inventorySold-Unsold Inventory of RERA_Parvati Enc_31-12-2022.pdf · uploaded 13 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate_3rd Qtr_Parvati Enclave.pdf · uploaded 13 May 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION CERTIFICATE.pdf · uploaded 1 Jun 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION DRAWING 1.pdf · uploaded 1 Jun 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION DRWING 2.pdf · uploaded 1 Jun 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Architects Certificate_Parvati Enclave.pdf · uploaded 1 Jun 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Parvati Enclave_10-04-2023.pdf · uploaded 14 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_Parvati Enclave_10-04-2023.pdf · uploaded 14 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance Certificate_Parvati EnclaveSakshi Builders.pdf · uploaded 14 Sep 2023View
  • Disclosure of sold/ booked inventorySold -Unsold Inventory of Rera_Parvati Enc_31-03-2023.pdf · uploaded 14 Sep 2023View
  • Status of ConveyanceDeclaration of Conveyance_Parvati Enclave.pdf · uploaded 18 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Certificate of Sakshi Builders,_0001.pdf · uploaded 20 Oct 2023View

Promoter documents

  • Legal Title reportSearch report.pdf · uploaded 31 May 2021View
  • Declaration Form BForm-B.pdf · uploaded 31 May 2021View

Technical documents

  • Building Plan ApprovalHPSC0229.pdfView
  • Layout ApprovalHPSC0229.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut No 26/1 Himayatnagar Aurangabad

As published on MahaRERA's project page

Gut No 26/1 Himayatnagar Aurangabad

Boundaries

North
Remaining Land of Tulsiram Bakle
South
Land In gut No 26
East
Open Space
West
15 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAvinash Pawar—
Chartered accountantNarendra Navandar and Co—
EngineerPrasad Arun Aphale—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology