Pahade Orchid

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Rajiv Dharamchand Pahade

Residential / Group HousingRERAP51500033677
2 Mar 2022Registered with MahaRERA
30 Sep 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
362 sq m (3,899 sq ft)
Permissible built-up area
1,154 sq m (12,421 sq ft)
Sanctioned built-up area
1,154 sq m (12,421 sq ft)
Address
Plot No. 168a, Cts No.15326, Sheet No. 298, Shastri Nagar Co-Op Housing Society, Aurangabad, AurangabadPIN 431001
Designated bank account
Saraswat Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Pahade Orchid is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2024

The latest completion date on record passed 2 years and 1 month ago.

Registered
2 Mar 2022
Promised
30 Sep 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000336772 Mar 202230 Sep 2024—Rajiv Dharamchand PahadeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pahade Orchid6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pahade Orchid

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAs Per Approved Plan100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As Per Approved Plan100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs Per Approved Plan100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs Per Approved Plan100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • Compound Wall and Entrance GateAs Per Approved Plan100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 21 filings listed on MahaRERA's project page

Allotment letters

Others

Registration certificate

Document library

  • Details of encumbrancesEncumbrance Cert.pdf · uploaded 16 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Cer.pdf · uploaded 16 Feb 2022View
  • Declaration about Commencement CertificateCommencement Cer Declaration.pdf · uploaded 16 Feb 2022View
  • CERSAI detailsCERSAI_Search_Report_200230357342_For_Asset_Based_Search_16_02_2022_15_30_09_185.pdf · uploaded 16 Feb 2022View
  • Copy of the legal title reportSearch Report as per RERA.pdf · uploaded 19 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentsanctioned plan AMC_compressed.pdf · uploaded 19 Feb 2022View
  • Declaration in FORM Bnotorised Form B.pdf · uploaded 19 Feb 2022View
  • Proforma of Allotment letterAgreement_for_Sale_Format.pdf · uploaded 21 Feb 2022View
  • Proforma of Allotment letterproforma_allotment_letter.pdf · uploaded 21 Feb 2022View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 21 Feb 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate feb 23.pdf · uploaded 15 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate feb 23.pdf · uploaded 15 Feb 2023View
  • Disclosure of sold/ booked inventoryinventory details feb 23.pdf · uploaded 15 Feb 2023View
  • Disclosure of sold/ booked inventorySales Inventory for Pahade Orchid.pdf · uploaded 3 Oct 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion for Pahade Orchid .pdf · uploaded 3 Oct 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 for Pahade Orchid .pdf · uploaded 3 Oct 2023View

Promoter documents

  • Legal Title reportSearch Report as per RERA.pdf · uploaded 19 Feb 2022View
  • Declaration Form Bnotorised Form B.pdf · uploaded 19 Feb 2022View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan Approvalsanctioned plan AMC_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterproforma_allotment_letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

15326CTS NO.15326PLOT NO. 168ASHEET NO. 298

As published on MahaRERA's project page

PLOT NO. 168A, CTS NO.15326, SHEET NO. 298

Boundaries

North
Cts No 15325
South
Cts No 15327
East
Cts No 15321 And 15322
West
9 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMirkute Architects And Interior Designers—
Chartered accountantYash Nagar—
EngineerSunil Katariya—
OtherSunil Kataeiya—

Source: MahaRERA project page. Contact details are not shown.