Oasis Insignia Phase-2

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Oasis Landmarks

Residential / Group HousingRERAP51500012426
1 Sep 2017Registered with MahaRERA
31 Dec 2018Promised completion
1Building
32Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHKD32 units in all
Land area for this project
1,396 sq m (15,026 sq ft)
Permissible built-up area
1,694 sq m (18,234 sq ft)
Sanctioned built-up area
1,694 sq m (18,234 sq ft)
Recreational open space
140 sq m (1,507 sq ft)
Address
ctcs-18762PIN 431001
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.09957, 79.06733
Oasis Insignia Phase-2 is at latitude 21.09957, longitude 79.06733.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
1 Sep 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000124261 Sep 201731 Dec 2018—Oasis LandmarksProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pearl1032

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

32 units registered

2BHKD · 32 units
TypeCarpet areaUnits
2BHKD49.45 sq m · 532 sq ft32

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000014

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pearl

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsUp to complition90%
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Up to complition90%
  • Storm Water DrainsCompleted100%
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingUp to complition90%
  • Community BuildingsCompleted100%
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And Disposal00%
  • Water conservation /Rain water harvesting00%
  • Energy managemcnt00%
  • Fire protection and fire safety requirements00%
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 23 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesencumbrances.pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)Plan_1opt.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterproforma_allotment_letter.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architech certificate.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Plan1_opt.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letteragrement.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM Bcompressed.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate-ilovepdf-compressed.pdf · uploaded 7 Apr 2018View
  • Otherothers.pdf · uploaded 7 Apr 2018View
  • Declaration in FORM BFORM b revised.pdf · uploaded 29 May 2018View
  • Certificates of CA (Form 5)RERA ca certificate.pdf · uploaded 1 Dec 2018View
  • Certificates of Architect (Form 4)application for compeletion certifiacte AMC.pdf · uploaded 13 Jul 2019View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 30 Jul 2017View
  • Declaration Form Bcompressed.pdf · uploaded 31 Jul 2017View
  • Declaration Form BFORM b revised.pdf · uploaded 29 May 2018View

Technical documents

  • Layout ApprovalPlan_1opt.pdfView
  • Building Plan ApprovalPlan1_opt.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letterproforma_allotment_letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

ctcs18762

As published on MahaRERA's project page

ctcs-18762

Boundaries

North
side margin and tower diamond
South
side margin and tower Ruby
East
Side margin and road
West
side margin and road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
ArchitectRahul Thole—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—
Chartered accountantyash nagar—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology