Nivara Residency

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Ashtvinayak Developers

Residential / Group HousingRERAP51500045464
19 May 2022Registered with MahaRERA
31 Mar 2025Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK12 units in all
Land area for this project
316 sq m (3,397 sq ft)
Permissible built-up area
1,987 sq m (21,385 sq ft)
Sanctioned built-up area
987 sq m (10,621 sq ft)
Address
Plot No 55, CTS No 16293/6, Shahanur Wadi, Dashmesh NagarPIN 431001
Designated bank account
Karur Vysya Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Nivara Residency is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
19 May 2022
Promised
31 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150004546419 May 202231 Mar 2025—Ashtvinayak DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Nivara Residency712

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

2BHK · 12 units
TypeCarpet areaUnits
2BHK62.58 sq m · 674 sq ft6
2BHK66.21 sq m · 713 sq ft6

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00006
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Nivara Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 15 filings listed on MahaRERA's project page

Other (13)

Show all 29 documentsShow fewer documents

Other (13)

Registration certificate

Document library

  • Copy of the legal title reportTitle Search Report Annexure.pdf · uploaded 2 May 2022View
  • Details of encumbrancesEncumbrance Certificate.pdf · uploaded 2 May 2022View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 2 May 2022View
  • Building Plan Approval / NA Order for plotted developmentLayout.pdf · uploaded 2 May 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 2 May 2022View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 2 May 2022View
  • Declaration in FORM BForm B.pdf · uploaded 2 May 2022View
  • Proforma of Allotment letterSample Agreement.pdf · uploaded 4 May 2022View
  • CERSAI detailsCERSAI Report.pdf · uploaded 7 May 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 26 Jul 2024View

Promoter documents

  • Legal Title reportTitle Search Report Annexure.pdf · uploaded 2 May 2022View
  • Declaration Form BForm B.pdf · uploaded 2 May 2022View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalLayout.pdfView

Proforma allotment letter

  • Proforma allotment letterSample Agreement.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

16293/655CTS No 16293/6Plot No 55

As published on MahaRERA's project page

Plot No 55, CTS No 16293/6

Boundaries

North
Open Space
South
30ft Wide Road
East
Plot No 56
West
Plot No 54

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManggal Design—
Chartered accountantZanwar Khandelwal & Associates—
EngineerCore Consultants—

Source: MahaRERA project page. Contact details are not shown.