Nirman Bharati City Centre

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: City Bharati Techno Herotage LLP

1 Sep 2017Registered with MahaRERA
31 Dec 2018Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,654 sq m (17,800 sq ft)
Permissible built-up area
2,298 sq m (24,731 sq ft)
Sanctioned built-up area
1,935 sq m (20,828 sq ft)
Address
17849/4PIN 431001
Designated bank account
State Bank Of India
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 16.22644, 74.34997
Nirman Bharati City Centre is at latitude 16.22644, longitude 74.34997.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
1 Sep 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000120031 Sep 201731 Dec 2018—City Bharati Techno Herotage LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
C Type7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000017
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

C Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsRCC ROAD100%
  • Water SupplyAMC WATER0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBER LINE NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION AROUND THE BUILDING50%
  • Street LightingLED STREET LIGHT0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK IN PROGRESS80%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFIRE HYDRENT PROVISION OF OVER HEAD TANK (WIP)20%
  • Electrical meter room, sub-station, receiving station315 KV TRANSFORMER (WIP)20%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 23 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Building Plan Approval (IOD)C BUILD 4.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)C BUILD 5.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterNBCC RERA AGREEMENT TO SALE (1).pdf · uploaded 28 Jul 2017View
  • Copy of the legal title reportPRAKASH PAITHANKAR NBBC C BUILD.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesC BUILD MORTGAGE DEED (1).pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE - NIRMAN BHARTI CITY CENTER.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)NIRMAN CITY BHARTI CENTER ENGINEER CERTIFICATE S - SCAN COPY.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BAffidavit Navin Bagadiya .pdf · uploaded 31 Jul 2017View
  • OtherC TYPE GROUND FLOOR PLAN.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHI CERTIFICATE 31-10-17 FOR C TYPE.pdf · uploaded 21 Dec 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG CERTIFICATE 30-10-17.pdf · uploaded 21 Dec 2017View
  • Architect’s Certificate on Completion of Project (Form 4)Manoj kala.pdf · uploaded 27 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy B C.pdf · uploaded 4 Sep 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development1-4 WORK DONE.pdf · uploaded 6 Sep 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development3-4 WORK DONE.pdf · uploaded 6 Sep 2021View

Promoter documents

  • Legal Title reportPRAKASH PAITHANKAR NBBC C BUILD.pdf · uploaded 28 Jul 2017View
  • Declaration Form BAffidavit Navin Bagadiya .pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalC BUILD 4.pdfView
  • Building Plan ApprovalC BUILD 5.pdfView
  • Layout ApprovalLAYOUT.pdfView

Other legal documents

  • OtherC TYPE GROUND FLOOR PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterNBCC RERA AGREEMENT TO SALE (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

17849/4

As published on MahaRERA's project page

17849/4

Boundaries

North
Land Of Mp Lawcollage17846
South
24 Mtr Wide Road Sawrkar Marg
East
Part Of Cts No 17849
West
Cts No 17849-3 Mosque

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMANOJ KALA & aSSOCIATES—
EngineerNg Kharkhane And Associates—
OtherDinesh L Vakil—
OtherEssen Constructions—

Source: MahaRERA project page. Contact details are not shown.