Kasliwal Niwara Phase I

Lapsed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Sanjay Suganchand Kasliwal

Residential / Group HousingRERAP51500009113
19 Aug 2017Registered with MahaRERA
28 Aug 2026Promised completion
8Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
8
Land area for this project
1,869 sq m (20,115 sq ft)
Permissible built-up area
14,945 sq m (1,60,861 sq ft)
Sanctioned built-up area
2,051 sq m (22,072 sq ft)
Recreational open space
0 sq m (0 sq ft)
Address
Gut No. 718, Chikalthana, ChikalthanaPIN 431001
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 17.83176, 73.73308
Kasliwal Niwara Phase I is at latitude 17.83176, longitude 73.73308.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 Aug 2026

The latest completion date on record passed 2 months ago.

Registered
19 Aug 2017
Promised
28 Aug 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000911319 Aug 201728 Aug 2026—Sanjay Suganchand KasliwalProject page

8 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P51500009113)——
Row House R14—
Row House R124—
Row House R132—
Row House R14 To R162—
ROW HOUSE R-2 to R-54—
Row House R6 And R73—
Row House R8 To R114—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Row House R1Closed/Covered00002
Row House R1Open Space00000
Row House R12Closed/Covered00002
Row House R12Open Space00000
Row House R13Closed/Covered00000
Row House R13Open Space00001
Row House R14 To R16Closed/Covered00000
Row House R14 To R16Open Space00003
Show all 14 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
ROW HOUSE R-2 to R-5Closed/Covered00008
ROW HOUSE R-2 to R-5Open Space00000
Row House R6 And R7Closed/Covered00004
Row House R6 And R7Open Space00000
Row House R8 To R11Closed/Covered00008
Row House R8 To R11Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House R1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House R12

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House R13

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 8 buildings and common areasShow fewer buildings and common areas

Row House R14 To R16

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

ROW HOUSE R-2 to R-5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House R6 And R7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House R8 To R11

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCurrently in this Phase WBM Road0%
  • Water SupplyWater supply line till Corporation Line80%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Drainage Line Till Corporation Line100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingStreet Light For Current Phase Only.0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting As per Norms100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs per requirement from MSEB with other phases0%
  • Aggregate area of recreational Open SpaceWill be provided with Final Phase of the Project0%
  • Open ParkingAS PER SANCTION PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

25 documents held by Deedo, 37 filings listed on MahaRERA's project page

Other (24)

Show all 62 documentsShow fewer documents

Other (24)

Registration certificate

Document library

  • Details of encumbrancesKN ENCUMBRANCE DETAILS.pdf · uploaded 15 Aug 2017View
  • Copy of Layout Approval (in case of layout)KN BUILDING PLAN 1.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 2.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 3.pdf · uploaded 15 Aug 2017View
  • Declaration in FORM BFORM B - SANJAY KASLIWAL.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 4.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 5.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 6.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 7.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)KN BUILDING PLAN 8.pdf · uploaded 15 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 15 Aug 2017View
  • Copy of the legal title reportSEARCH REPORT - KASLIWAL NIWARA.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 KN ARCHITECT CERTIFICATE.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 KN ENGINEERS CERTIFICATE.pdf · uploaded 16 Aug 2017View
  • OtherSANJAY KASLIWAL - SELF DECLARATION.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterKASLIWAL NIWARA - ATS DRAFT RERA.pdf · uploaded 16 Aug 2017View
  • Certificates of CA (Form 5)KASLIWAL NIWARA- FORM 5 - CA ANNUAL REPORT FY 2017-18.pdf · uploaded 16 Oct 2018View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)KASLIWAL NIWARA- FORM 5 - CA ANNUAL REPORT FY 2018-19.pdf · uploaded 2 Dec 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 KN ARCHITECT CERTIFICATE 30072021.pdf · uploaded 11 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 5 19-20-1.pdf · uploaded 16 Sep 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 5 20-21.pdf · uploaded 16 Sep 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 1920.pdf · uploaded 16 Sep 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2021.pdf · uploaded 16 Sep 2022View
  • Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 3 Oct 2022View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 4 Oct 2022View

Promoter documents

  • Declaration Form BFORM B - SANJAY KASLIWAL.pdf · uploaded 15 Aug 2017View
  • Legal Title reportSEARCH REPORT - KASLIWAL NIWARA.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalKN BUILDING PLAN 1.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 2.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 3.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 4.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 5.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 6.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 7.pdfView
  • Building Plan ApprovalKN BUILDING PLAN 8.pdfView

Other legal documents

  • OtherSANJAY KASLIWAL - SELF DECLARATION.pdfView

Proforma allotment letter

  • Proforma allotment letterKASLIWAL NIWARA - ATS DRAFT RERA.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO. 718

As published on MahaRERA's project page

GUT NO. 718

Boundaries

North
12 Metre Wide Dp Road
South
Part Land Of Gut No 718
East
Gut No 719
West
Part Land Of Gut No 718

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJ B Associate—
EngineerN G Karkhane—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology