Hrim Sky City Elite

Active

Aurangabad (M Corp.), Aurangabad 431010 |Promoter: Narayanii Buildcreation Private Limited

Residential / Group HousingRERAP51500054900
15 Feb 2024Registered with MahaRERA
31 Dec 2028Promised completion
5Buildings
51Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
5
Unit types
3BHK51 units in all
Land area for this project
2,849 sq m (30,666 sq ft)
Permissible built-up area
10,878 sq m (1,17,092 sq ft)
Sanctioned built-up area
5,180 sq m (55,759 sq ft)
Address
Gut No 65 Part 1 2 3 Opposite Mit College Near Beed Bypass Tq And Dist Chhatrapati Sambhajinagar, Beed Bypass, Opposite Mit CollegePIN 431010
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Hrim Sky City Elite is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
15 Feb 2024
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150005490015 Feb 202431 Dec 2028—Narayanii Buildcreation Private LimitedProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Row House 18 to 31214
Row House 1 to 525
Row House 32 to 44213
Row House 54 to 6027
Row House 6 To 17212

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

51 units registered

3BHK · 51 units
BuildingTypeCarpet areaUnits
Row House 18 to 313BHK88.89 sq m · 957 sq ft14
Row House 1 to 53BHK88.89 sq m · 957 sq ft5
Row House 32 to 443BHK88.89 sq m · 957 sq ft13
Row House 54 to 603BHK88.89 sq m · 957 sq ft7
Row House 6 To 173BHK88.89 sq m · 957 sq ft12

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Row House 18 to 31Closed/Covered000014
Row House 18 to 31Open Space000014
Row House 1 to 5Closed/Covered00005
Row House 1 to 5Open Space00005
Row House 32 to 44Closed/Covered000013
Row House 32 to 44Open Space000013
Row House 54 to 60Closed/Covered00007
Row House 54 to 60Open Space00007
Row House 6 To 17Closed/Covered000012
Row House 6 To 17Open Space000012

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House 18 to 31

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor20%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House 1 to 5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor20%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House 32 to 44

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor20%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House 54 to 60

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor20%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House 6 To 17

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor20%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsInternal Project Roads20%
  • Water SupplyFROM BOREWELL20%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Drainage Line0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingInternal Project Tree Plantation0%
  • Street LightingInternal Project Street Lights0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalAs per Norms0%
  • Water conservation /Rain water harvestingRain water Harvesting as per Norms0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER MSEB NORMS0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

62 documents held by Deedo, 64 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 3 Nov 2023View
  • Deviation Report with respect to Allotment letterAllotment Letter.pdf · uploaded 3 Nov 2023View
  • Deviation Report with respect to model copy of AgreementAgreement To Sale.pdf · uploaded 3 Nov 2023View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 3 Nov 2023View
  • CERSAI detailsCERSAI Declaration.pdf · uploaded 3 Nov 2023View
  • a Details of encumbrances concerned to FinanceNo Eng Fin.pdf · uploaded 3 Nov 2023View
  • a Details of encumbrances concerned to FinanceNo Eng Legal.pdf · uploaded 3 Nov 2023View
  • b Details of encumbrances concerned to LegalNo Eng Fin.pdf · uploaded 3 Nov 2023View
  • b Details of encumbrances concerned to LegalNo Eng Legal.pdf · uploaded 3 Nov 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A ( Ashwin Baheti ).pdf · uploaded 3 Nov 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A ( Ashokkumar Baheti ).pdf · uploaded 3 Nov 2023View
  • Proforma of Allotment letterModal From Of Allotment Letter.pdf · uploaded 3 Nov 2023View
  • Proforma of Agreement for saleATS Draft RERA.pdf · uploaded 3 Nov 2023View
  • Copy of Layout Approval (in case of layout)layout_compressed.pdf · uploaded 3 Nov 2023View
  • Building Plan Approval / NA Order for plotted developmentorganized layout_compressed.pdf · uploaded 3 Nov 2023View
  • Copy of the legal title reportNarayani - Search Report.pdf · uploaded 10 Nov 2023View
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 10 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep-23.pdf · uploaded 10 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep-23.pdf · uploaded 10 Nov 2023View
  • Other – TechnicalAPPENDIX F (1)_compressed.pdf · uploaded 16 Nov 2023View
  • Declaration in FORM BForm B ( Devlopers ).pdf · uploaded 16 Nov 2023View
  • Building Plan Approval / NA Order for plotted development8 of 8_compressed.pdf · uploaded 16 Nov 2023View
  • Other – TechnicalCC Verification Mail.pdf · uploaded 29 Jan 2024View
  • Other – TechnicalNarayani Plot Declaration.pdf · uploaded 3 Feb 2024View
  • Building Plan Approval / NA Order for plotted development7 of 8_compressed.pdf · uploaded 3 Feb 2024View
  • Form 1Form-1 Dec 23.pdf · uploaded 20 Dec 2025View
  • Form 2Form-2 Dec 23.pdf · uploaded 20 Dec 2025View
  • Disclosure of Sold and Booked InventorySold Dec 23.pdf · uploaded 20 Dec 2025View
  • Form 1Form-1 June 24.pdf · uploaded 20 Dec 2025View
  • Form 2Form-2 June 24.pdf · uploaded 20 Dec 2025View
  • Disclosure of Sold and Booked InventorySold June 24.pdf · uploaded 20 Dec 2025View
  • Form 1Form-1 Sep 24.pdf · uploaded 20 Dec 2025View
  • Form 2Form-2 Sep 24.pdf · uploaded 20 Dec 2025View
  • Disclosure of Sold and Booked InventorySold Sep 24.pdf · uploaded 20 Dec 2025View
  • Form 1Form-1 Dec 24.pdf · uploaded 20 Dec 2025View
  • Form 2Form-2 Dec 24.pdf · uploaded 20 Dec 2025View
  • Disclosure of Sold and Booked InventorySold Dec 24.pdf · uploaded 20 Dec 2025View
  • Form 1Form-1 March 25.pdf · uploaded 20 Dec 2025View
  • Form 2Form-2 March 25.pdf · uploaded 20 Dec 2025View
  • Disclosure of Sold and Booked InventorySold March 25.pdf · uploaded 20 Dec 2025View
  • Form 1Form-1 June 25.pdf · uploaded 20 Dec 2025View
  • Form 2Form-2 June 25.pdf · uploaded 20 Dec 2025View
  • Disclosure of Sold and Booked InventorySold June 25.pdf · uploaded 20 Dec 2025View
  • Form 11 Form-1 Sep 25.pdf · uploaded 29 Dec 2025View
  • Form 22 Form-2 Sep 25.pdf · uploaded 29 Dec 2025View
  • Disclosure of Sold and Booked Inventory4 Sold Sep 25.pdf · uploaded 29 Dec 2025View
  • Form 1Hrim Sky Dec 2025 Form 1.pdf · uploaded 11 Feb 2026View
  • Form 2Hrim Sky Dec 2025 Form 2.pdf · uploaded 11 Feb 2026View
  • Disclosure of Sold and Booked InventoryHrim Sky Dec 2025 sold unsold.pdf · uploaded 11 Feb 2026View
  • Form 5 (FY 2023-2024)23-24 Form 5.pdf · uploaded 12 Feb 2026View
  • Form 5 (FY 2024-2025)Form 5 24-25.pdf · uploaded 12 Feb 2026View
  • Form 1Form-1 Mar 26.pdf · uploaded 26 May 2026View
  • Form 2Form-2 Mar 26.pdf · uploaded 26 May 2026View
  • Disclosure of Sold and Booked InventorySold Mar 26.pdf · uploaded 26 May 2026View
  • Form 1Form 1 June-26.pdf · uploaded 13 Aug 2026View
  • Form 2Form 2 June-26.pdf · uploaded 13 Aug 2026View
  • Disclosure of Sold and Booked InventorySold-Unsold June-26.pdf · uploaded 13 Aug 2026View

Promoter documents

  • Legal Title reportNarayani - Search Report.pdf · uploaded 10 Nov 2023View
  • Declaration Form BForm B ( Devlopers ).pdf · uploaded 16 Nov 2023View

Technical documents

  • Layout Approvallayout_compressed.pdfView
  • Building Plan Approvalorganized layout_compressed.pdfView
  • Building Plan Approval8 of 8_compressed.pdfView
  • Building Plan Approval7 of 8_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterModal From Of Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 65 PART 1 2 3 OPPOSITE MIT COLLEGE NEAR BEED BYPASS TQ

As published on MahaRERA's project page

GUT NO 65 PART 1 2 3 OPPOSITE MIT COLLEGE NEAR BEED BYPASS TQ AND DIST CHHATRAPATI SAMBHAJINAGAR

Boundaries

North
Remaining Land of Promoter
South
Gut no 66 Part
East
7-5 mtr internal project road
West
open space of Group Housing permission

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArch Pramod Narale—
Chartered accountantD M Samdani and Company—
Chartered accountantS A Samdani & Co.—
EngineerJ V Structural Engineer—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology