Green Space Residency Project 1 B Block

Lapsed

Aurangabad (M Corp.), Aurangabad 431002 |Promoter: Marathwada Constructions Pvt Ltd

Residential / Group HousingRERAP51500045761
9 Jun 2022Registered with MahaRERA
31 Mar 2026Promised completion
3Buildings
9Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
3
Unit types
4 BHK ROW BUNGLOW9 units in all
Land area for this project
803 sq m (8,645 sq ft)
Permissible built-up area
2,011 sq m (21,646 sq ft)
Sanctioned built-up area
1,006 sq m (10,828 sq ft)
Address
Gut No 77 Part Satara Satara Parisar Aurangabad, Satara, Satara ParisarPIN 431002
Designated bank account
Saraswat Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Green Space Residency Project 1 B Block is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2026

The latest completion date on record passed 7 months ago.

Registered
9 Jun 2022
Promised
31 Mar 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000457619 Jun 202231 Mar 2026—Marathwada Constructions Pvt LtdProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
B Block 1 to 333
B Block 4 to 633
B Block 7 to 933

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

9 units registered

4 BHK ROW BUNGLOW · 9 units
BuildingTypeCarpet areaUnits
B Block 1 to 34 BHK ROW BUNGLOW105.09 sq m · 1,131 sq ft3
B Block 4 to 64 BHK ROW BUNGLOW97.38 sq m · 1,048 sq ft3
B Block 7 to 94 BHK ROW BUNGLOW96.75 sq m · 1,041 sq ft3

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
B Block 1 to 3Closed/Covered00001
B Block 1 to 3Open Space00000
B Block 4 to 6Closed/Covered00001
B Block 4 to 6Open Space00000
B Block 7 to 9Closed/Covered00001
B Block 7 to 9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

B Block 1 to 3

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B Block 4 to 6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B Block 7 to 9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsAS PER DRAWING FOR COMPLETE PROJECT0%
  • Water SupplyFROM BOREWELL0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DRAINAGE LINE TILL CORPORATION LINE0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION INTERNAL PROJECT0%
  • Street LightingINTERNAL PROJECT STREET LIGHTS0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

52 documents held by Deedo, 55 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesLetterhead Green Space Residency (project 1).pdf · uploaded 20 May 2022View
  • Commencement Certificates / NA Order for plotted developmentCOMM CERT_compressed.pdf · uploaded 20 May 2022View
  • Declaration about Commencement CertificateFormat D Green Space Residency (Project 1).pdf · uploaded 20 May 2022View
  • Copy of Layout Approval (in case of layout)Epson961_compressed.pdf · uploaded 20 May 2022View
  • Building Plan Approval / NA Order for plotted developmentEpson960_compressed.pdf · uploaded 20 May 2022View
  • Declaration in FORM BForm B Green Space Residency (Project 1)_compressed.pdf · uploaded 20 May 2022View
  • Proforma of Allotment letterATS.pdf · uploaded 20 May 2022View
  • Copy of the legal title reportsearch report_compressed.pdf · uploaded 20 May 2022View
  • CERSAI detailsCERSAI_Search_Report_200237788854_For_Asset_Based_Search_20_05_2022_19_20_48_137.pdf · uploaded 20 May 2022View
  • Disclosure of sold/ booked inventorySold_Booked_Inventory_GSR_B_March23.pdf · uploaded 24 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A 21-22.pdf · uploaded 28 Nov 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A 22-23.pdf · uploaded 28 Nov 2023View
  • Disclosure of sold/ booked inventoryGSR B Block June 2023.pdf · uploaded 28 Nov 2023View
  • Disclosure of sold/ booked inventoryGSR B Block Sep 2023.pdf · uploaded 28 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 ( 12-04-2023 ).pdf · uploaded 28 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 ( 15-07-2023 ).pdf · uploaded 28 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 ( 16-10-2023 ).pdf · uploaded 28 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 ( 12-04-2023 ).pdf · uploaded 28 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 ( 15-07-2023 ).pdf · uploaded 28 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 ( 16-10-2023 ).pdf · uploaded 28 Nov 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A GSR B.pdf · uploaded 5 Dec 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5.pdf · uploaded 31 Dec 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)row house rera archt 10-04-2024.pdf · uploaded 20 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Row house rera archt 10-01-2024.pdf · uploaded 20 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Row house rera archt 10-01-2024.pdf · uploaded 20 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)eng rera gsr 12-01-2024.pdf · uploaded 20 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)eng certificate 14-04-2024.pdf · uploaded 20 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 June 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Sep 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Dec 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-2 Sep 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 June 24.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Dec 24.pdf · uploaded 22 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A 23-24.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventorySold Dec 24.pdf · uploaded 22 Feb 2025View
  • Form 1Form-1 March 25.pdf · uploaded 24 Jun 2025View
  • Form 2Form-2 March 25.pdf · uploaded 24 Jun 2025View
  • Disclosure of Sold and Booked InventorySold March 25.pdf · uploaded 24 Jun 2025View
  • Form 1Form-1 June 25.pdf · uploaded 6 Dec 2025View
  • Form 2Form-2 June 25.pdf · uploaded 6 Dec 2025View
  • Disclosure of Sold and Booked InventorySold June 25.pdf · uploaded 6 Dec 2025View
  • Form 1Form-1 Sep 25.pdf · uploaded 6 Dec 2025View
  • Form 2Form-2 Sep 25.pdf · uploaded 6 Dec 2025View
  • Disclosure of Sold and Booked InventorySold Sep 25.pdf · uploaded 6 Dec 2025View
  • Form 1Form-1 Dec 25.pdf · uploaded 4 Jul 2026View
  • Form 2Form-2 Dec 25.pdf · uploaded 4 Jul 2026View
  • Disclosure of Sold and Booked InventorySold Dec 25.pdf · uploaded 4 Jul 2026View
  • Form 1Form-1 March 26.pdf · uploaded 4 Jul 2026View
  • Form 2Form-2 March 26.pdf · uploaded 4 Jul 2026View
  • Disclosure of Sold and Booked InventorySold March 26.pdf · uploaded 4 Jul 2026View

Promoter documents

  • Declaration Form BForm B Green Space Residency (Project 1)_compressed.pdf · uploaded 20 May 2022View
  • Legal Title reportsearch report_compressed.pdf · uploaded 20 May 2022View

Technical documents

  • Layout ApprovalEpson961_compressed.pdfView
  • Building Plan ApprovalEpson960_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 77 PART SATARA SATARA PARISAR AURANGABAD

As published on MahaRERA's project page

GUT NO 77 PART SATARA SATARA PARISAR AURANGABAD

Boundaries

North
Gut No 77 Part Land
South
Green Space Residency Project 1 Part A
East
Common Road And Green Space Residency Project 2
West
Gut No 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Rohit Raka—
Chartered accountantSudarshan Karwa and Company—
Chartered accountantV R Patni And Associates—
EngineerRavindra Bansode—

Source: MahaRERA project page. Contact details are not shown.