Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Raaj Real Estate

Residential / Group HousingRERAP51500008456
19 Aug 2017Registered with MahaRERA
19 Feb 2021Promised completion
3Buildings
27Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
3
Unit types
2BHK FLAT, 2BHK ROW HOUSE27 units in all
Land area for this project
4,000 sq m (43,056 sq ft)
Permissible built-up area
2,333 sq m (25,116 sq ft)
Sanctioned built-up area
533 sq m (5,741 sq ft)
Recreational open space
400 sq m (4,306 sq ft)
Address
Gut no 210/3, Deolai Road, Beed BypassPIN 431001
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.65402, 73.91032
Deogiri Puram is at latitude 18.65402, longitude 73.91032.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 19 Feb 2021

The latest completion date on record passed 5 years and 8 months ago.

Registered
19 Aug 2017
Promised
19 Feb 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150000845619 Aug 201719 Feb 2021—Raaj Real EstateProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Flat 1-12512
Flat 13-2038
Rh 24-3047

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

27 units registered

2BHK FLAT · 20 units2BHK ROW HOUSE · 7 units
BuildingTypeCarpet areaUnits
Flat 1-122BHK FLAT47.35 sq m · 510 sq ft12
Flat 13-202BHK FLAT47.35 sq m · 510 sq ft8
Rh 24-302BHK ROW HOUSE77.88 sq m · 838 sq ft7

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Flat 1-12Closed/Covered000012
Flat 1-12Open Space00000
Flat 13-20Closed/Covered00008
Flat 13-20Open Space00000
Rh 24-30Closed/Covered00007
Rh 24-30Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Flat 1-12

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Flat 13-20

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Rh 24-30

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsAs per Drawings/Details obtained from Consultant100%
  • Water SupplyAs per Drawings/Details obtained from Consultant0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Drawings/Details obtained from Consultant100%
  • Storm Water DrainsAs per Drawings/Details obtained from Consultant0%
  • Landscaping & Tree PlantingAs per Drawings/Details obtained from Consultant100%
  • Street LightingAs per Drawings/Details obtained from Consultant100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per Drawings/Details obtained from Consultant100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs per Drawings/Details obtained from Consultant100%
  • Aggregate area of recreational Open SpaceAs per Drawings/Details obtained from Consultant100%
  • Open ParkingNot applicable
  • compound wallAs per Drawings/Details obtained from Consultant100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 19 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesRAAJ ENCUM.PDF · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)puram layout.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterraaj booking receipt.PDF · uploaded 16 Aug 2017View
  • Proforma of Allotment letterpart1 ATS puram.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterPart2ATS puram.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BRAAJ SKB FORM B.PDF · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)puram engineers certificate RERA.PDF · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)BUILDING PLAN 2 RAAJ ROW HOUSE.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)BUILDING PLAN ROW HOUSE RAAJ.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportPuram RERA Serch report.PDF · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencementRAAJ.PDF · uploaded 23 Mar 2018View
  • Otherrh24-30.pdf · uploaded 14 Jul 2021View

Promoter documents

  • Declaration Form BRAAJ SKB FORM B.PDF · uploaded 16 Aug 2017View
  • Legal Title reportPuram RERA Serch report.PDF · uploaded 16 Aug 2017View

Technical documents

  • Layout Approvalpuram layout.pdfView
  • Building Plan ApprovalBUILDING PLAN 2 RAAJ ROW HOUSE.pdfView
  • Building Plan ApprovalBUILDING PLAN ROW HOUSE RAAJ.pdfView

Other legal documents

  • Otherrh24-30.pdfView

Proforma allotment letter

  • Proforma allotment letterraaj booking receipt.PDFView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut no 210/3

As published on MahaRERA's project page

Gut no 210/3

Boundaries

North
road and land of Manohar Autade in survey no 210
South
land of Ratilal Bhagure in survey no 212
East
Land of Sridhar Punjaji in survey no 210
West
land of Jagannath Baburao in survey no 210

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Ausekar—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology