Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar

Active

Aurangabad (M Corp.), Aurangabad 431002 |Promoter: Aurangabad Housing And Area Development Board ( A Regional Unit Of Mhada)

Residential / Group HousingRERAP51500080227
9 May 2025Registered with MahaRERA
14 Mar 2029Promised completion
18Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
18
Land area for this project
64,000 sq m (6,88,890 sq ft)
Permissible built-up area
54,847 sq m (5,90,372 sq ft)
Sanctioned built-up area
54,847 sq m (5,90,372 sq ft)
Recreational open space
6,485 sq m (69,802 sq ft)
Planning authority
Chhatrapati Sabhajinagar Housing Area and Development Board
Address
Gut No 9, side road from Nisarga Nursury, Opposite of Khivsara Plotting NakshtrawadiPIN 431002
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.80665, 75.29760
Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar is at latitude 19.80665, longitude 75.29760.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 14 Mar 2029

Registered
9 May 2025
Promised
14 Mar 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000802279 May 202514 Mar 2029—Aurangabad Housing And Area Development Board ( A Regional Unit Of Mhada)Project page

18 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A18—
A29—
A39—
A49—
A59—
A69—
A79—
A89—
Show all 18 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
B19—
B29—
B39—
B49—
B59—
B69—
B79—
B89—
B99—
Building (P51500080227)——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A1Closed/Covered000093
A1Open Space00000
A2Closed/Covered000093
A2Open Space00000
A3Closed/Covered000093
A3Open Space00000
A4Closed/Covered000093
A4Open Space00000
Show all 34 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A5Closed/Covered000089
A5Open Space00000
A6Closed/Covered000089
A6Open Space00000
A7Closed/Covered000089
A7Open Space00000
A8Closed/Covered000089
A8Open Space00000
B1Closed/Covered000051
B1Open Space00000
B2Closed/Covered000045
B2Open Space00000
B3Closed/Covered000045
B3Open Space00000
B4Closed/Covered000045
B4Open Space00000
B5Closed/Covered000048
B5Open Space00000
B6Closed/Covered000048
B6Open Space00000
B7Closed/Covered000045
B7Open Space00000
B8Closed/Covered000048
B8Open Space00000
B9Closed/Covered000048
B9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A1

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A2

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A3

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 18 buildings and common areasShow fewer buildings and common areas

A4

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A5

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A6

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A7

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A8

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B1

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B2

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B3

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B4

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B5

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B6

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B7

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B8

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B9

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsINTERNAL ROAD0%
  • Water Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0%
  • Storm Water Drains0%
  • Landscaping & Tree Planting0%
  • Street Lighting0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements0%
  • Electrical meter room, sub-station, receiving stationSUB STATION0%
  • Aggregate area of recreational Open Space0%
  • Open Parking0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

45 documents held by Deedo, 78 filings listed on MahaRERA's project page

Allotment letter (2)

Form B

Encumbrance details (2)

Other (15)

Show all 123 documentsShow fewer documents

Other (15)

Form 1 (4)

Form 2 (3)

Title report

Commencement certificate (2)

Layout plan

Registration certificate

Building plan (13)

Document library

  • Declaration in FORM Bform b 1056.pdf · uploaded 18 Nov 2024View
  • a Details of encumbrances concerned to FinanceNON ENCUMBRANCE CERTIFICATE.pdf · uploaded 19 Nov 2024View
  • b Details of encumbrances concerned to LegalNON ENCUMBRANCE CERTIFICATE.pdf · uploaded 19 Nov 2024View
  • CERSAI detailsUndertaking No Cersai Report.pdf · uploaded 19 Nov 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 21 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 21 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 21 Nov 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)Declaration about separate Bank Account for real estate projects.pdf · uploaded 21 Nov 2024View
  • Proforma of Allotment letterALLOTMENT.pdf · uploaded 21 Nov 2024View
  • Proforma of Agreement for saleALLOTMENT.pdf · uploaded 21 Nov 2024View
  • Copy of the legal title report09_UTARA_7-12_.pdf · uploaded 22 Nov 2024View
  • Deviation Report with respect to Allotment letterdeviation.pdf · uploaded 22 Nov 2024View
  • Deviation Report with respect to model copy of Agreementdeviation.pdf · uploaded 22 Nov 2024View
  • Disclosure for secured/unsecured finance availed for the projectSecured unsecured.pdf · uploaded 22 Nov 2024View
  • Building Plan Approval / NA Order for plotted developmentPLANS.pdf · uploaded 22 Nov 2024View
  • Building Plan Approval / NA Order for plotted developmentPLANS (1).pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentPLANS (3).pdf · uploaded 9 Dec 2024View
  • a Details of encumbrances concerned to Financeencumbrwnce.pdf · uploaded 6 Jan 2025View
  • b Details of encumbrances concerned to Legalencumbrwnce.pdf · uploaded 6 Jan 2025View
  • Other – Technicalorder 30 annexure A.pdf · uploaded 7 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentB5, B6,B8, B9.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentB3 and B7 BUA DRG.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentB1 BUA DRG (2).pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentB2 and B4 BUA DRG.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA8 BUA DRG s.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA7 BUA DRG s.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA6 BUA DRG s.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA5 BUA DRG s.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA2 -A4 BUA DRG s.pdf · uploaded 22 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentA1 and A3 BUA DRG s.pdf · uploaded 22 Jan 2025View
  • Commencement Certificates / NA Order for plotted developmentNakshatrawadi Commencement Certificate.pdf · uploaded 24 Apr 2025View
  • Declaration about Commencement CertificateDeclaration For Commencement Certificate.pdf · uploaded 24 Apr 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Declaration Format B.pdf · uploaded 24 Apr 2025View
  • Other – LegalBP Cell to MahaRERA.pdf · uploaded 30 Apr 2025View
  • Other – FinanceLayout Plan.pdf · uploaded 30 Apr 2025View
  • Other – LegalLayout Plan.pdf · uploaded 2 May 2025View
  • Other – FinanceBP Cell to MahaRERA.pdf · uploaded 2 May 2025View
  • Copy of Layout Approval (in case of layout)Layout Plan-.pdf · uploaded 5 May 2025View
  • Form 1Form 1.pdf · uploaded 11 Dec 2025View
  • Form 2Form 2.pdf · uploaded 11 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold booked inventory_.pdf · uploaded 11 Dec 2025View
  • Self-declaration of Quarterly Progressdeclaration_0001.pdf · uploaded 11 Dec 2025View
  • Form 1form 1 1056 qpr.pdf · uploaded 16 Jan 2026View
  • Form 2form 2 1056 qpr.pdf · uploaded 16 Jan 2026View
  • Disclosure of Sold and Booked InventoryDIsclosure of Sold -Booked Inventory 1056 qpr.pdf · uploaded 16 Jan 2026View
  • Form 1Rera Form MHADA.PDF · uploaded 28 Apr 2026View
  • Form 2form2 1056.pdf · uploaded 28 Apr 2026View
  • Disclosure of Sold and Booked Inventorysold unsold 1056_compressed.pdf · uploaded 28 Apr 2026View
  • Self-declaration of Quarterly Progress1056 1st.pdf · uploaded 28 Apr 2026View
  • Self-declaration of Quarterly Progress1056 2nd.pdf · uploaded 28 Apr 2026View
  • Form 1Rera Form MHADA.PDF · uploaded 28 Apr 2026View
  • Form 2form2 1056.pdf · uploaded 28 Apr 2026View
  • Disclosure of Sold and Booked Inventorysold unsold 1056_compressed.pdf · uploaded 28 Apr 2026View
  • Form 1form 1 1056_0001.pdf · uploaded 19 Aug 2026View
  • Form 2form 2_0001.pdf · uploaded 19 Aug 2026View
  • Disclosure of Sold and Booked Inventorysold booked_0001.pdf · uploaded 19 Aug 2026View
  • Self-declaration of Quarterly Progress1056 self declaration.pdf · uploaded 19 Aug 2026View

Promoter documents

  • Declaration Form Bform b 1056.pdf · uploaded 18 Nov 2024View
  • Legal Title report09_UTARA_7-12_.pdf · uploaded 22 Nov 2024View

Technical documents

  • Layout ApprovalLayout Plan-.pdfView
  • Building Plan ApprovalB5, B6,B8, B9.pdfView
  • Building Plan ApprovalB3 and B7 BUA DRG.pdfView
  • Building Plan ApprovalB1 BUA DRG (2).pdfView
  • Building Plan ApprovalB2 and B4 BUA DRG.pdfView
  • Building Plan ApprovalA8 BUA DRG s.pdfView
  • Building Plan ApprovalA7 BUA DRG s.pdfView
  • Building Plan ApprovalA6 BUA DRG s.pdfView
  • Building Plan ApprovalA5 BUA DRG s.pdfView
  • Building Plan ApprovalA2 -A4 BUA DRG s.pdfView
  • Building Plan ApprovalA1 and A3 BUA DRG s.pdfView
  • Building Plan ApprovalPLANS.pdfView
  • Building Plan ApprovalPLANS (1).pdfView
  • Building Plan ApprovalPLANS (3).pdfView

Other legal documents

  • Other – LegalBP Cell to MahaRERA.pdfView
  • Other – LegalLayout Plan.pdfView

Financial documents

  • Other – FinanceLayout Plan.pdf · uploaded 30 Apr 2025View
  • Other – FinanceBP Cell to MahaRERA.pdf · uploaded 2 May 2025View

Proforma allotment letter

  • Proforma allotment letterALLOTMENT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

Gut No 9Gut No 9 at Aurangabad

As published on MahaRERA's project page

Gut No 9

Boundaries

North
Shiv Rasta
South
MJP Water treatment Plant
East
Forest Departments Land
West
Private Land

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSudhakar Bahegavhankar—
Chartered accountantMaya Pagare—
EngineerRishikesh Vyapari—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology