Cd Building · Bhaskar Vastupurti Apartment

Aurangabad (M Corp.) · RERA P51500011897

IDBLD_0102617 floorsCompleted
7Sanctioned habitable floorsregistration certificate
30 Oct 2020Revised completionpromised 31 Dec 2018

Floors

7 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P51500011897 · registered 31 Aug 2017
Promised completion
31 Dec 2018
Revised completion
30 Oct 2020
Sanctioned habitable floors
7

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
2 BHK45.6 m² (491 sq.ft)6not published
2 BHK45.6 m² (491 sq.ft)6not published
2 BHK46 m² (495 sq.ft)6not published
2 BHK46.5 m² (500 sq.ft)1not published
2 BHK47 m² (505 sq.ft)5not published
2 BHK47.1 m² (507 sq.ft)6not published
2 BHK47.4 m² (510 sq.ft)6not published
2 BHK49.1 m² (528 sq.ft)6not published
2 BHK50.8 m² (547 sq.ft)6not published
Total48

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered00020
Open Space0005

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor75%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through10 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology