Aurangabad Trade Centre

Completed

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Aurangabad Trade Centre

22 Jan 2018Registered with MahaRERA
31 Dec 2018Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,534 sq m (16,512 sq ft)
Permissible built-up area
1,210 sq m (13,022 sq ft)
Sanctioned built-up area
1,210 sq m (13,022 sq ft)
Recreational open space
122 sq m (1,308 sq ft)
Address
Gut No 104 Part Mitmita, Nashik Road, Mitmita, AurangabadPIN 431001
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.68311, 73.79779
Aurangabad Trade Centre is at latitude 18.68311, longitude 73.79779.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
22 Jan 2018
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150001500922 Jan 201831 Dec 2018—Aurangabad Trade CentreProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aurangabad Trade Centre7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00004
Open Space00005

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aurangabad Trade Centre

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBORE WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK ATTACHED100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCOMPLETED100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 17 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportSearch report.pdf · uploaded 4 Jan 2018View
  • Building Plan Approval (IOD)PLAN LAYOUT.pdf · uploaded 4 Jan 2018View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate-ilovepdf-compressed.pdf · uploaded 4 Jan 2018View
  • Details of encumbrancesATC ENCUM.pdf · uploaded 5 Jan 2018View
  • Proforma of Allotment letterAFS-ATC.pdf · uploaded 5 Jan 2018View
  • Declaration in FORM BATC FORM B.pdf · uploaded 5 Jan 2018View
  • Copy of Layout Approval (in case of layout)PLAN LAYOUT.pdf · uploaded 6 Jan 2018View
  • Certificates of Architect (Form 4)A T C - COMPLETION ARCHITECT CERTIFICATE.pdf · uploaded 31 Mar 2018View
  • Status of Conveyancep01.pdf · uploaded 31 Mar 2018View
  • Status of Formation of Legal Entity (Society/Co Op etc.)p01.pdf · uploaded 31 Mar 2018View
  • OtherOCCUPANCY CERTIFICATE.pdf · uploaded 31 Mar 2018View

Promoter documents

  • Legal Title reportSearch report.pdf · uploaded 4 Jan 2018View
  • Declaration Form BATC FORM B.pdf · uploaded 5 Jan 2018View

Technical documents

  • Building Plan ApprovalPLAN LAYOUT.pdfView
  • Layout ApprovalPLAN LAYOUT.pdfView

Other legal documents

  • OtherOCCUPANCY CERTIFICATE.pdfView

Proforma allotment letter

  • Proforma allotment letterAFS-ATC.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 104 PART MITMITA

As published on MahaRERA's project page

GUT NO 104 PART MITMITA

Boundaries

North
Gut No 104 Part
South
Nashik Road
East
Gut No 104 Part
West
Gut No 105 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSiddiqui Mohammad Hares—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology