Arch Crystal

Active

Aurangabad (M Corp.), Aurangabad 431001 |Promoter: Shri Arch Developers

18 Mar 2020Registered with MahaRERA
30 Dec 2026Promised completion
2Buildings
56Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
2
Unit types
2BHK56 units in all
Land area for this project
1,715 sq m (18,460 sq ft)
Permissible built-up area
3,000 sq m (32,292 sq ft)
Sanctioned built-up area
1,557 sq m (16,756 sq ft)
Address
P15, MIDC, ShendraPIN 431001
Designated bank account
Akola Janata Commercial Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.86942, 75.47970
Arch Crystal is at latitude 19.86942, longitude 75.47970.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2026

Registered
18 Mar 2020
Promised
30 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150002499118 Mar 202030 Dec 2026—Shri Arch DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Arch Crystal A Wing828
Arch Crystal B wing828

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

56 units registered

2BHK · 56 units
BuildingTypeCarpet areaUnits
Arch Crystal A Wing2BHK50.61 sq m · 545 sq ft14
Arch Crystal A Wing2BHK50.74 sq m · 546 sq ft14
Arch Crystal B wing2BHK50.61 sq m · 545 sq ft14
Arch Crystal B wing2BHK50.74 sq m · 546 sq ft14

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Arch Crystal A WingClosed/Covered00000
Arch Crystal A WingOpen Space00000
Arch Crystal B wingClosed/Covered00000
Arch Crystal B wingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Arch Crystal A Wing

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Arch Crystal B wing

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsSite Development80%
  • Water SupplyUGT and OHT infrastrucutre only80%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Chambers and Pipeline80%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingPeripherial Plantation100%
  • Street LightingNot applicable
Show all 16 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRainwater Harvesting System80%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Staircase100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingPaved Parking80%
  • Liftone lift50%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 18 filings listed on MahaRERA's project page

Encumbrance details (3)

Commencement certificate

Allotment letter (3)

Form B (2)

Show all 33 documentsShow fewer documents

Form B (2)

Title report

Registration certificate

Other (2)

Layout plan

Building plan

Document library

  • Commencement Certificates / NA Order for plotted developmentSanction Letter_P15.pdf · uploaded 5 Feb 2020View
  • Copy of Layout Approval (in case of layout)Sanction Plan 1.pdf · uploaded 5 Feb 2020View
  • Building Plan Approval / NA Order for plotted developmentSanction Plan 2.pdf · uploaded 5 Feb 2020View
  • Proforma of Allotment letterAllotment Letter_P15.pdf · uploaded 5 Feb 2020View
  • Details of encumbrancesDeclaration_for_Encumbrances_P15.PDF · uploaded 5 Feb 2020View
  • Declaration in FORM BFORM_B_SKB Feb20_P15.pdf · uploaded 7 Feb 2020View
  • Copy of the legal title reportSearch cum Title Repor.PDF · uploaded 8 Feb 2020View
  • Proforma of Allotment letterATS draft_P-15_Upload.pdf · uploaded 12 Mar 2020View
  • Details of encumbrancesEncumbrances Details.pdf · uploaded 31 Dec 2020View
  • Declaration in FORM BFORM-B_Declarationof Loan.pdf · uploaded 31 Dec 2020View
  • Proforma of Allotment letterATS draft P-15 2121.pdf · uploaded 2 Jan 2021View
  • Details of encumbrancesDeclaration of encumbrances.pdf · uploaded 6 Jan 2021View

Promoter documents

  • Declaration Form BFORM_B_SKB Feb20_P15.pdf · uploaded 7 Feb 2020View
  • Legal Title reportSearch cum Title Repor.PDF · uploaded 8 Feb 2020View
  • Declaration Form BFORM-B_Declarationof Loan.pdf · uploaded 31 Dec 2020View

Technical documents

  • Layout ApprovalSanction Plan 1.pdfView
  • Building Plan ApprovalSanction Plan 2.pdfView

Proforma allotment letter

  • Proforma allotment letterATS draft_P-15_Upload.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

P15P15 at Aurangabad

As published on MahaRERA's project page

P15

Boundaries

North
Plot no P22 and P23
South
Proposed Commercial Phase
East
Plot no P-14
West
Plot no P-16-1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYZ Concepts—
Chartered accountantYash Nagar—
EngineerSheshrao Jadhav—
OtherVeeraj Construction—

Source: MahaRERA project page. Contact details are not shown.