Adinath Sankul

Completed

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Adinath Developers

5 Aug 2021Registered with MahaRERA
31 Mar 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
864 sq m (9,300 sq ft)
Permissible built-up area
2,652 sq m (28,544 sq ft)
Sanctioned built-up area
1,696 sq m (18,251 sq ft)
Address
Gut No 51 Plot No 19, 20 And 21, Shivaji Nagar Road, Garkheda ParisarPIN 431005
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Adinath Sankul is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
5 Aug 2021
Promised
31 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000301985 Aug 202131 Mar 2023—Adinath DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Adinath Sankul6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000018
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Adinath Sankul

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply3 Bore Wells for Water Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Underground Sewerage System100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Plantation at Appropriate Places100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per Government Norms100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 26 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrancesEncumbrance Certificate.PDF · uploaded 28 Jun 2021View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 28 Jun 2021View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 28 Jun 2021View
  • Declaration about Commencement CertificateDeclaration Format D.PDF · uploaded 28 Jun 2021View
  • Declaration in FORM BAffidavit (Form B).PDF · uploaded 28 Jun 2021View
  • Proforma of Allotment letterATS RERA.pdf · uploaded 28 Jun 2021View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 28 Jun 2021View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 28 Jun 2021View
  • OtherPartnership Deed and RC.pdf · uploaded 20 Jul 2021View
  • Copy of the legal title reportFormat A.pdf · uploaded 30 Jul 2021View
  • Copy of the legal title report1.pdf · uploaded 30 Jul 2021View
  • Copy of the legal title report2.pdf · uploaded 30 Jul 2021View
  • Copy of the legal title report3.pdf · uploaded 30 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Architect Certificate Form 4 and OC.pdf · uploaded 8 Aug 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY.pdf · uploaded 6 Sep 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentBUILDING PLAN 1_compressed.pdf · uploaded 6 Sep 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentBUILDING PLAN 2_compressed.pdf · uploaded 6 Sep 2023View

Promoter documents

  • Declaration Form BAffidavit (Form B).PDF · uploaded 28 Jun 2021View
  • Legal Title reportFormat A.pdf · uploaded 30 Jul 2021View
  • Legal Title report1.pdf · uploaded 30 Jul 2021View
  • Legal Title report2.pdf · uploaded 30 Jul 2021View
  • Legal Title report3.pdf · uploaded 30 Jul 2021View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLayout.pdfView

Other legal documents

  • OtherPartnership Deed and RC.pdfView

Proforma allotment letter

  • Proforma allotment letterATS RERA.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

1920202121GUT NO 51 PLOT NO 19

As published on MahaRERA's project page

GUT NO 51 PLOT NO 19, 20 AND 21

Boundaries

North
Plot No 18
South
15 Meter Wide Road
East
9 Meter Wide Road
West
Amc Reserved Area For School Ground

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShruti Deshpande—
Chartered accountantKapvalt & Co—
EngineerShivraj Tupe—
OtherAbhijit Jeewanwal—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology