Abk Aurix

Active

Aurangabad (M Corp.), Aurangabad 431005 |Promoter: Gopal Balaprasad Ajmera

13 Nov 2024Registered with MahaRERA
31 Dec 2027Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
3
Land area for this project
2,961 sq m (31,874 sq ft)
Permissible built-up area
8,976 sq m (96,612 sq ft)
Sanctioned built-up area
8,976 sq m (96,612 sq ft)
Recreational open space
296 sq m (3,187 sq ft)
Planning authority
Aurangabad Municipal Corporation
Address
Gut no. 22/Part, Mauje Shahnoorwadi, Gut no. 22/Part, Mauje Shahnoorwadi, ShahnoorwadiPIN 431005
Designated bank account
Kotak Mahindra Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.84966, 75.33464
Abk Aurix is at latitude 19.84966, longitude 75.33464.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
13 Nov 2024
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5150007789513 Nov 202431 Dec 2027—Gopal Balaprasad AjmeraProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Block A8—
Block B9—
Block C8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Block AClosed/Covered000015
Block AOpen Space00000
Block BClosed/Covered000058
Block BOpen Space00000
Block CClosed/Covered000030
Block COpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Block A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure10%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAs per Approved Plan0%
  • Water SupplyAs per Approved Plan0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Approved Plan30%
  • Storm Water DrainsAs per Approved Plan20%
  • Landscaping & Tree PlantingAs per Approved Plan0%
  • Street LightingAs per Approved Plan0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per Approved Plan0%
  • Energy managemcntAs per Approved Plan0%
  • Fire protection and fire safety requirementsAs per Approved Plan0%
  • Electrical meter room, sub-station, receiving stationAs per Approved Plan0%
  • Aggregate area of recreational Open SpaceAs per Approved Plan0%
  • Open ParkingAs per Approved Plan0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 44 filings listed on MahaRERA's project page

Other (32)

Show all 77 documentsShow fewer documents

Other (32)

Registration certificate

Document library

  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 10 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentComencement Cerificate.pdf · uploaded 10 Oct 2024View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 2_UPLOAD.pdf · uploaded 10 Oct 2024View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 1_UPLOAD.pdf · uploaded 10 Oct 2024View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 3.pdf · uploaded 10 Oct 2024View
  • Declaration in FORM BForm B.pdf · uploaded 10 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)final form 2.pdf · uploaded 10 Oct 2024View
  • Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured unsceured.pdf · uploaded 10 Oct 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclouse of interest in other real estasted oraganation.pdf · uploaded 10 Oct 2024View
  • Proforma of Allotment letterModel form of Allotment letter_New_upload.pdf · uploaded 10 Oct 2024View
  • Deviation Report with respect to Allotment letterDeviation report with respect to allotment letter.pdf · uploaded 10 Oct 2024View
  • Deviation Report with respect to model copy of AgreementDeviation report with respect to model copy agreement.pdf · uploaded 10 Oct 2024View
  • CERSAI detailsCERSAI_Search_Report_200323688061_For_Asset_Based_Search_10_10_2024_14_49_55_675.pdf · uploaded 10 Oct 2024View
  • Proforma of Agreement for saleModel Aggrement to sale with annex_1.pdf · uploaded 11 Oct 2024View
  • Copy of the legal title reportformat A Legal Report.pdf · uploaded 11 Oct 2024View
  • a Details of encumbrances concerned to FinanceDetails of encomburance concerned to legal_1.pdf · uploaded 11 Oct 2024View
  • b Details of encumbrances concerned to LegalDetails of encomburance concerned to legal_1.pdf · uploaded 11 Oct 2024View
  • a Details of encumbrances concerned to FinanceEncumbarance certificate_page-0001.pdf · uploaded 11 Oct 2024View
  • b Details of encumbrances concerned to LegalEncumbarance certificate_page-0001.pdf · uploaded 11 Oct 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)format A bank.pdf · uploaded 11 Oct 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)format B Bank Account.pdf · uploaded 11 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentCC Screenshot.pdf · uploaded 14 Oct 2024View
  • CERSAI detailsPromoter of self undertaking regarding non creation of security interest.pdf · uploaded 21 Oct 2024View
  • Other – TechnicalAnnexure A.pdf · uploaded 21 Oct 2024View
  • Declaration about Commencement CertificateFINAL CC DECLARATION.pdf · uploaded 22 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentREVISED APPENDIX F.pdf · uploaded 25 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_UPLOAD.pdf · uploaded 25 Oct 2024View
  • Withdrawal Update Form 1abk FORM 1.pdf · uploaded 2 Sep 2025View
  • Withdrawal Update Form 2ABK FROM 2.pdf · uploaded 2 Sep 2025View
  • Withdrawal Update Form 1abk FORM 1.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2ABK FROM 2.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1abk FORM 1.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1abk FORM 1.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2ABK FROM 2.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2ABK FROM 2.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1Form 1 2026-27 Q1.pdf · uploaded 9 Jul 2026View
  • Withdrawal Update Form 2Form 2 2026-27 Q1.pdf · uploaded 9 Jul 2026View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 10 Oct 2024View
  • Legal Title reportformat A Legal Report.pdf · uploaded 11 Oct 2024View

Technical documents

  • Building Plan ApprovalBuilding Plan 3.pdfView
  • Building Plan ApprovalBuilding Plan 2_UPLOAD.pdfView
  • Building Plan ApprovalBuilding Plan 1_UPLOAD.pdfView
  • Layout ApprovalLayout.pdfView

Proforma allotment letter

  • Proforma allotment letterModel form of Allotment letter_New_upload.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Aurangabad (M Corp.), Aurangabad taluka

Survey, CTS, gat or plot numbers

Gut no. 22/Part

As published on MahaRERA's project page

Gut no. 22/Part, Mauje Shahnoorwadi

Boundaries

North
Satara Shiv Gut no 20
South
Beed By Pass road
East
Satara Shiv
West
Shahnoorwadi Gut no 23

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManoj Kala—
Chartered accountantAlkesh Rawka And Associates—
Chartered accountantSonam Nagar—
Chartered accountantYash Nagar—
EngineerSameer Sanjay Kumawat—
EngineerShripad Deshmukh And Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology