Skip to content
Deedo home
Menu

Madhura Sai Arch

Active

Ashrafpur, Aurangabad 431008 |Promoter: Madhura Land Developers

Residential / Group HousingRERAP51500077305
6 Aug 2024Registered with MahaRERA
31 Dec 2030Promised completion
5Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
5
Land area for this project
5,000 sq m (53,820 sq ft)
Permissible built-up area
8,592 sq m (92,482 sq ft)
Sanctioned built-up area
3,592 sq m (38,662 sq ft)
Planning authority
CIDCO, AURANGABAD
Address
Gut No 13 Part Village Ashrafpur Tq And Dist Aurangabad, Village Ashrafpur, AshrafpurPIN 431008
Designated bank account
The Cosmos Co Operative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.94351, 75.34953
Madhura Sai Arch is at latitude 19.94351, longitude 75.34953.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2030

Registered
6 Aug 2024
Promised
31 Dec 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000773056 Aug 202431 Dec 2030—Madhura Land DevelopersProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Type Building2—
B Type Building2—
C Type Building2—
D Type Building2—
Madhura Sai Arch E Type7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A Type BuildingClosed/Covered00000
A Type BuildingOpen Space00005
B Type BuildingClosed/Covered00000
B Type BuildingOpen Space00005
C Type BuildingClosed/Covered00000
C Type BuildingOpen Space00005
D Type BuildingClosed/Covered00000
D Type BuildingOpen Space00005
Madhura Sai Arch E TypeClosed/Covered000014
Madhura Sai Arch E TypeOpen Space000046

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Type Building

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B Type Building

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C Type Building

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

D Type Building

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Madhura Sai Arch E Type

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAS PER DRAWING0%
  • Water SupplyFROM BORE-WELL0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DRAINAGE LINE TILL CIDCO LINE0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingINTERNAL PROJECT TREE PLANTATION0%
  • Street LightingINTERNAL PROJECT STREET LIGHTING0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER MSEB NORMS0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

62 documents held by Deedo, 86 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportMLD - Search Report.pdf · uploaded 3 Jul 2024View
  • a Details of encumbrances concerned to FinanceNO ENC FIN.pdf · uploaded 3 Jul 2024View
  • a Details of encumbrances concerned to FinanceNO ENC LEGAL.pdf · uploaded 3 Jul 2024View
  • b Details of encumbrances concerned to LegalNO ENC FIN.pdf · uploaded 3 Jul 2024View
  • b Details of encumbrances concerned to LegalNO ENC LEGAL.pdf · uploaded 3 Jul 2024View
  • Copy of Layout Approval (in case of layout)DWG Layout.pdf · uploaded 3 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentDWG A Type.pdf · uploaded 3 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentDWG B Type.pdf · uploaded 3 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentDWG C Type.pdf · uploaded 3 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentDWG D Type.pdf · uploaded 3 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentDWG E Type.pdf · uploaded 3 Jul 2024View
  • Commencement Certificates / NA Order for plotted developmentMLD - CIDCO CC.pdf · uploaded 3 Jul 2024View
  • Declaration about Commencement CertificateFORMAT-D.pdf · uploaded 3 Jul 2024View
  • Declaration in FORM BFORM - B.pdf · uploaded 3 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)MLD Form-1.pdf · uploaded 3 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)MLD Form-2.pdf · uploaded 3 Jul 2024View
  • CERSAI detailsCERSAI Declaration.pdf · uploaded 3 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDisc of Interest Sandip.pdf · uploaded 3 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDisc of Interest Karpe.pdf · uploaded 3 Jul 2024View
  • Proforma of Allotment letterModel Form of Allotment Letter.pdf · uploaded 3 Jul 2024View
  • Proforma of Agreement for saleATS Draft RERA.pdf · uploaded 3 Jul 2024View
  • Deviation Report with respect to Allotment letterNo Deviation Allotment.pdf · uploaded 3 Jul 2024View
  • Deviation Report with respect to model copy of AgreementNo Deviation Agreement.pdf · uploaded 3 Jul 2024View
  • Other – LegalAuthority Letter.pdf · uploaded 3 Jul 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)MLD - New Format-A.pdf · uploaded 6 Jul 2024View
  • Disclosure for secured/unsecured finance availed for the projectNO ENC FIN.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT BALASAHEB PATHRIKAR.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT MANISHA CHAVAN.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT NITYANAND GAIKE.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT PANDHARINATH GADEKAR.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT PRATIK MOTHE.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT SATISH WETAL.pdf · uploaded 12 Jul 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsDISC OF INT VAIBHAV JAGDALE.pdf · uploaded 12 Jul 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)MLD - Format-B .pdf · uploaded 12 Jul 2024View
  • Other – TechnicalANNEXURE A_page-0001.pdf · uploaded 12 Jul 2024View
  • Other – FinanceAUTHORITY LETTER.pdf · uploaded 12 Jul 2024View
  • Other – FinanceMLD - Partnership Deed_compressed.pdf · uploaded 12 Jul 2024View
  • Other – LegalMLD - Land Purchase Deed_removed_compressed.pdf · uploaded 12 Jul 2024View
  • Other – FinanceMLD - Land Purchase Deed_removed_compressed.pdf · uploaded 12 Jul 2024View
  • CERSAI detailsCERSAI_Search_Report_200315209984_For_Asset_Based_Search_29_07_2024_18_01_53_614.pdf · uploaded 29 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form-1 Sep 24.pdf · uploaded 5 Mar 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form-2 Sep 24.pdf · uploaded 5 Mar 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form-1 Dec 24.pdf · uploaded 5 Mar 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form-2 Dec 24.pdf · uploaded 5 Mar 2025View
  • Disclosure of sold/ booked inventory2 Sold Dec 24.pdf · uploaded 5 Mar 2025View
  • Disclosure of sold/ booked inventory5 MLD Sold Mar 25.pdf · uploaded 28 Apr 2025View
  • Document1 MLD Form 1 Mar 25.pdf · uploaded 29 Apr 2025View
  • Document2 MLD Form 2 Mar 25.pdf · uploaded 29 Apr 2025View
  • Form 11 Form-1 Jun 25.pdf · uploaded 26 Jul 2025View
  • Form 22 Form -2 - Jun 25.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked Inventory4 Sold Jun 25.pdf · uploaded 26 Jul 2025View
  • Form 11 MLD Form 1 Mar 25.pdf · uploaded 26 Jul 2025View
  • Form 22 MLD Form 2 Mar 25.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked Inventory5 MLD Sold Mar 25.pdf · uploaded 26 Jul 2025View
  • Form 11 Form-1 Dec 24.pdf · uploaded 26 Jul 2025View
  • Form 22 Form-2 Dec 24.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked Inventory2 Sold Dec 24.pdf · uploaded 26 Jul 2025View
  • Form 11 Form-1 Sep 24.pdf · uploaded 26 Jul 2025View
  • Form 22 Form-2 Sep 24.pdf · uploaded 26 Jul 2025View
  • Disclosure of Sold and Booked Inventory4 Sold Sep 24.pdf · uploaded 26 Jul 2025View
  • Form 1FORM -1 MLD Q-2.pdf · uploaded 4 Nov 2025View
  • Form 2Form 2_Engineer Certificate_MLD.pdf · uploaded 4 Nov 2025View
  • Disclosure of Sold and Booked InventoryDiscloser Of Sold - Bookd M Sai Arch.pdf · uploaded 4 Nov 2025View
  • Form 11 Form 1 DEC 25.pdf · uploaded 22 Jan 2026View
  • Form 22 Form 2 DEC 25.pdf · uploaded 22 Jan 2026View
  • Disclosure of Sold and Booked Inventory4 Sold DEC 25.pdf · uploaded 22 Jan 2026View
  • Form 1FORM 1 MAR 26.pdf · uploaded 20 May 2026View
  • Form 2FORM 2 MAR 26.pdf · uploaded 20 May 2026View
  • Disclosure of Sold and Booked InventorySOLD MAR 26.pdf · uploaded 20 May 2026View
  • Form 1FORM-1 JUN 26.pdf · uploaded 28 Jul 2026View
  • Form 2FORM-2 JUN 26.pdf · uploaded 28 Jul 2026View
  • Disclosure of Sold and Booked InventorySOLD JUN 26.pdf · uploaded 28 Jul 2026View

Promoter documents

  • Legal Title reportMLD - Search Report.pdf · uploaded 3 Jul 2024View
  • Declaration Form BFORM - B.pdf · uploaded 3 Jul 2024View

Technical documents

  • Layout ApprovalDWG Layout.pdfView
  • Building Plan ApprovalDWG A Type.pdfView
  • Building Plan ApprovalDWG B Type.pdfView
  • Building Plan ApprovalDWG C Type.pdfView
  • Building Plan ApprovalDWG D Type.pdfView
  • Building Plan ApprovalDWG E Type.pdfView

Other legal documents

  • Other – LegalMLD - Land Purchase Deed_removed_compressed.pdfView
  • Other – LegalAuthority Letter.pdfView

Financial documents

  • Other – FinanceAUTHORITY LETTER.pdf · uploaded 12 Jul 2024View
  • Other – FinanceMLD - Partnership Deed_compressed.pdf · uploaded 12 Jul 2024View
  • Other – FinanceMLD - Land Purchase Deed_removed_compressed.pdf · uploaded 12 Jul 2024View

Proforma allotment letter

  • Proforma allotment letterModel Form of Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ashrafpur, Aurangabad taluka

Survey, CTS, gat or plot numbers

GUT NO 13 PART

As published on MahaRERA's project page

GUT NO 13 PART VILLAGE ASHRAFPUR TQ AND DIST AURANGABAD

Boundaries

North
Gut No 13 Part
South
12 Meter Wide Dp Road
East
12 Meter Wide Dp Road
West
Gut No 13 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArch Dhananjay Doiphode—
Chartered accountantK S B A And Co—
EngineerMd Yunus And Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology