bhekhar Kokane Planning &Design Consultant Date :1929/os2024 Letter No. :2e/o9/2024 FORM -1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:- 30/09/2024 To, M/s. Ellora Asian Realty Pvt. Ltd., Sector No. CDC, Plot No. 26A+46A, PCNTDA, Chikhali, Pune. Subject: Certificate of Percentage of Completion of Construction Work of 1 Building of the Project "Privia Prestige" (Maha RERA Registration Number- P52100020384] situated on the plot bearing Sector No. CDC, Plot No. 26A+46A, Village- Chikhali, Taluka-Haveli, District-Pune, Plot Admeasuring 3275.10 sq.mts Area being developed by M/s. Ellora Asian Realty Pvt. Ltd. Respected Sir, Mr. Shekhar S. Kokane have undertaken assignment as Licensed Engineer of certifying Percentage of Completion of Construction Work of 1 Building of the project " Privia Prestige" situated on the Plot bearing Sector No. CDC, Plot No. 26A+46A, Division- Pune, Village- Chikhali, Taluka-Haveli, District-Pune, Plot Admeasuring 3275.10 sq.mts Area being deyeloped by M/s. Ellora Asian Realty Pvt. Ltd. 'SWARAJYA, Office No. 01, First Floor, Plot No. 314, Sector No. 27, Sant Dnyaneshwar Chowk, 1|Page Nigdi-Pradhikaran, Pune - 411 044. 020 27640269 :9822018979, 8605001008. E-mail : info1008@shekharkokane.com, shekharkokane1008@gmail.com, Website : www.shekharkokane.corm Rased on site inspection, with respect to each of the bulding of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the percentage of work done for each of the huilding of the Real Estate Project. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building no. 1 -A Wing Percentage of Work Sr. Tasks /Activity No. Done Excavation 100% 1 100% 2 Plinth 100% 3. 2Number of Basement Parking NA 4. Stilt Floor 100% 5. 15 number of Slabs of Super Structure 100% 6. Internal walls, Internal Plaster Flooringwithin Flats/Premises Doors and Windows to each of the Flat /Premises 95% 7. Sanitary Fittings within the FlatPremises Electrical Fittings with the Flat/Premises 100% 8 Staircase, Lifts Wells and Lobbies at each Floor Level connecting Staircase and Lifts Overheads and Underground Water Tanks. 100% 9. The external plumbing and external plaster Elevation, completion of terraces with water proofing of The Building/Wing. 95% 10. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, Paying of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate. 11. Over all9% of work done for Entire Building. 98% 2| Page TABLE - B- nternal &Extemal Develapment Worksin Respect of the entire Registered Phase, Sr. Common areas and Facilities, Proposed Percentage of Details No. Amenities (Yes/No) Work Done 1. Internal Road & Footpaths NA NA NA Yes 100% UG Tank 2. Water Supply 3. Sewerage (Chamber, Lines, Septic| Yes 100% Drainage Line Tank, STP) 4. Storm Water Drains NA NA NA 5. Landscaping &Tree Planting Yes 100% NA NA NA 6 Street Lighting NA NA NA 7 Community Buildings (Club House) NA NA 8 Treatment and disposal of sewage and| NA sullage water &NA NA NA 9 Solid Waste management Disposal(drainage connection) water Yes 100% Rain Water 10 Water conservation Rain Harvesting harvesting NA NA NA 11 Energy management Fire protection and fire safely Yes 100% 12 requirements Electrical meter room, sub-station, Yes 100% 13. receiving station Solar Water Heater Yes 100% 14. Compound Wall + Gate Yes 100% 15. Yours faithfully, shekhax Kokane Planning &Design Consultant eL No LE/0499)20241c01 No. 9822018979 314/27, Nigd, PCNTDA, Pune411044. For 3 | Page Director