FORM 3 (See Regulation 3) CHARTERED ACCOUNTANT ’S CERTIFICATE (To be submitted at the time of Registration of Project and for withdrawal of Money from Designated Account) Date: 02-06-2026 To, M/s. THAKUR REALTORS PVT LTD, Office 606, 6Th floor, Plot No 195, Sector 19, Ulwe, Navi Mumbai - 410206. Subject: Certificate of Financial Progress of Work of Thakur Neelkamal situated at ( Plot no 126 Sector 8 at Dapoli, Panvel Raigarh, 410206 ) having Maha RERA Registration Number P52000052358 being developed by M/s. Thakur Realtors Pvt Ltd Sir, This certificate is being issued for RERA compliance for the Thakur Neelkamal having Maha RERA Registration Number P52000052358 being developed by M/s. Thakur Realtors Pvt Ltd and is based on the records and documents produced before me and explanations provided to me by the management of the firm. Table A - Estimated Cost of the Project (at the time of Registration of Project) Sr. No. Particulars Estimated Cost (At the time of Registration of Project) (1) (2) (3) 1 (i) Land Cost : a) Value of the Land as ascertained from the Annual Statement of Rates (ASR) 4,05,60,000.00 b) Estimated Amount of Premium payable to obtain development rights, FSI, additional FSI, fungible area and any other incentive/concession in deficiency 1,40,00,000.00 under DCR from Local Authority or State Government/UT Administration or any Statutory Authority. c) Estimated Acquisition cost of TDR (if any) - d) Estimated Amounts payable to State Government/UT Administration or competent authority or any other statutory authority of the state or Central - Government, towards stamp duty, transfer charges, registration fees etc; and e) Estimated Land Premium payable as per annual statement of rates (ASR) for - redevelopment of land owned by public authorities. f) Under Rehabilitation scheme: (i) Estimated construction cost of rehab building including site development and infrastructure for the same as certified by Engineer. - (ii) Estimated Cost towards clearance of land of all or any encumbrances including cost of removal of legal/illegal occupants, cost for providing temporary transit accommodation or rent in lieu of Transit Accommodation, overheads cost, - amounts payable to slum dwellers, tenants, apartment owners or appropriate authority or government or concessionaire which are not refundable and so on. (iii) Estimated Cost of ASR linked premium, fees, charges and security deposits or maintenance deposit or any amount whatsoever payable to any authorities - towards and in project of rehabilitation. (iv) Any other cost including interest estimated on the borrowing done specifically - for construction of rehabilition component Sub-Total of Land Cost 5,45,60,000.00 (ii) Development Cost / Cost of Construction of Building a) Estimated Cost of Construction as certified by Engineer. 12,90,67,860.00 b) Cost incurred on additional items not included in estimated cost (As per - Engineer Certificate) c) Estimated Expenditure for development of entire project excluding cost of construction as per (i) above, i.e. salaries, consultants fees, site overheads, development works, cost of services (including water, electricity, sewerage, - drainage, layout roads etc.), absorbed cost (attributable to this project) of machineries and equipment including its hire and maintenance cost, consumables etc. d) Estimated Taxes, cess, fees, charges, premiums, interest etc. payable to any - Statutory Authority. e) Interest payable to financial institutions, scheduled banks, non banking financial institution (NBFC) or money lenders on construction funding or - money borrowed for construction. Sub-total of Development Cost: 12,90,67,860.00 Total Cost of the Project (Estimated) 18,36,27,860.00 *Pass through charges or indirect taxes not included in estimated cost of project. **Estimated cost shall be revised through correction application. Table B - Actual Cost Incurred on the Project (as on Date of Certificate) Sr. Particulars Actual (Rs.) Incurred No. (1) (2) (3) 1 Land Cost (a) Value of land as ascertained from the Annual Statement of 2,60,34,574.00 Rates (ASR) (b) Incurred Expenditure on Premiums to obtain development rights, FSI, additional FSI, fungible area and any other incentive/ concession in deficiency under DCR from Local 1,40,00,000.00 Authority or State Government/UT Administration or any Statutory Authority. (c) Incurred Expenditure for Acquisition of TDR (if any). - (d) Amounts paid to State Government/UT Administration or competent authority or any other statuory authority of the State or Central Government, towards stamp duty, transfer - charges, registration fees etc; and (e) Land Premium paid for redevelopment of land owned by - public authorities. (f) Under Rehabilitation scheme: i. Incurred Expenditure for construction of rehabilitation - building. Minimum of (a) or (b) to be considered (a) Cost Incurred for consruction of rehab including site development and infrastructure for the same as certified by - Engineer. (b) Incurred Expenditure for construction of rehab building as per the books of accounts as verified by the CA. - ii. Incurred Expenditure towards clearance of land of all or any encumbrances including cost of removal of legal/illegal occupants, cost for providing temporary transit accomodation or rent in lieu of Transit Accommodation,overhead cost, - amounts paid to slum dwellers, tenants, apartment owners or appropriate authority or government or concessionaire which are not refundable and so on. iii. Incurred Expenditure toward ASR linked premium, fees, charges and security deposits or maintenance deposit, or any amount whatsoever paid to any authorities towards and in - project of rehabilitation. iv. Any other cost including interest incurred on the borrowing done specifically for construction of rehabilitation component. Sub -Total of Land Cost 4,00,34,574.00 2 Development Cost/ Cost of Construction (i) Expenditure for construction. Minimum of (a) and (b) to be considered 5,63,90,121.00 (a) Construction cost incurred including site development and infrastructure for the same as certified by the Engineer. 5,63,90,121.00 (b) Actual Cost of construction incurred as per the books of accounts as verified by the CA. 5,63,90,121.00 (ii) Cost incurred on additional items not included in estimated cost (As per engineer certificate) (iii) Incurred Expenditure for development of entire project excluding cost of construction as per (i) above, i.e. salaries, consultants fees, site overheads, development works, cost of services (including water, electricity, sewerage, drainage, layout roads etc.) absorbed cost (attributable to this project) of - machineries and equipment including its hire and maintenance costs, consumables etc. All costs incurred to complete the construction of the entire phase of the project registered. (iv) Incurred Expenditure towards Taxes, cess, fees, charges, premiums, interest etc. to any Statutory Authority. - (v) Incurred Expenditure towards Interest to Financial institutions, scheduled banks, non-banking financial - institution (NBFC) or money lenders on construction funding or money borrowed for construction. Sub-Total of Development Cost: 5,63,90,121.00 3 Total Cost of the Project (Actual incurred as on 31-03-2026) 9,64,24,695.00 4 Proportion of the Cost incurred on Land Cost and Construction Cost 52.51% to the Total Estimated Cost (Table A) 5 Amount which can be withdrawn from the Designated Account 9,64,24,695.00 Less: Amount withdrawn till date of this certificate from the 6 Designated Account 7 Net Amount which can be withdrawn from the Designated Bank 9,64,24,695.00 A/c under this certificate. *Pass through charges or indirect taxes not included in incurred cost of the project. Table C Statement for calculation of Receivables from the sales of Project Thakur Emerald Sold Inventory Sr Flat No. Carpet Area Unit Consideration Received Amount Balance Receivable No. (in Sq.ft) as per Agreement / Letter of Allotment (1) (2) (3) (4) (5) (6) 1 204 417.105 35,00,000.00 1925000 15,75,000 2 23,32,000 20,68,000 401 417.11 44,00,000 3 38,22,500 31,27,500 402 681.04 69,50,000 4 23,58,500 20,91,500 404 417.11 44,50,000 5 21,20,000 18,80,000 405 416.46 40,00,000 6 21,42,000 20,58,000 504 417.11 42,00,000 7 22,00,000 18,00,000 508 416.14 40,00,000 8 24,22,138 20,62,412 601 417.11 44,84,550 9 39,28,282 34,83,568 603 681.04 74,11,850 10 27,02,163 17,47,837 608 416.14 44,50,000 11 23,74,400 21,05,600 707 416.14 44,80,000 12 39,75,000 35,25,000 203 681.04 75,00,000 13 22,30,772 22,61,153 906 416.46 44,91,925 14 28,15,080 16,76,845 907 416.14 44,91,925 15 24,28,740 19,87,148 709 416.46 44,15,888 16 23,72,270 21,03,710 701 417.11 44,75,980 17 41,00,000 - 509 416.46 41,00,000 18 24,72,250 20,22,750 606 416.46 44,95,000 19 31,25,000 13,40,425 804 417.11 44,65,425 20 21,20,000 18,80,000 901 417.11 40,00,000 21 21,56,770 15,85,230 904 417.11 37,42,000 22 28,31,850 16,63,150 206 416.46 44,95,000 23 39,92,146 35,40,204 502 681.04 75,32,350 24 30,25,009 24,74,991 303 681.04 55,00,000 25 28,00,000 22,00,000 702 681.04 50,00,000 26 48,50,000 - SHOP 5 624.63 48,50,000 27 30,00,000 - SHOP 6 373.94 30,00,000 Total 12,584.95 12,53,81,893.00 7,46,96,870.00 5,06,85,023.00 *Unit consideration as per agreement/letter of allotment and amount received does not include pass through charges and indirect taxes. Unsold Inventory Developer's Share Sr. Unit Nos. Carpet Area Units Consideration as 10.763 No. (in SFt) per Ready Reckoner Rate (1) (2) (3) (4) Shop/Flat 1 SHOP 4 440.79 55,09,822.50 2 Office 1 369.74 46,21,792.50 3 Office 2 543.58 67,94,775.00 4 Office 3 385.78 48,22,272.00 5 207 416.14 52,01,703.00 6 301 417.11 52,13,812.50 7 306 416.46 52,05,739.50 8 307 416.14 52,01,750.00 9 505 416.46 52,05,739.50 10 607 416.14 52,01,703.00 11 706 416.46 52,05,739.50 12 801 417.11 52,13,812.50 13 802 681.04 85,12,978.50 14 809 416.46 52,05,739.50 15 903 681.04 85,12,978.50 Total 6850.43 85630358.00 Table D Comparison between Balance Cost and Receivables Sr. No. Particulars Amount (1) (2) (3) 1 Estimated Balance Cost to Complete the Real Estate Project (Difference of Total Estimated 8,72,03,165 Project cost less Cost Incurred) 2 Balance amount receivable from sold apartments as per Table C of this certificate (as 5,06,85,023 certified by Chartered Accountant as verified from the records and books of Accounts) 3 (i) Balance Unsold area (to be certified by Management and to be verified by CA from the 6,850 records and books of Accounts)(Sq. Mtr.) (ii) Estimated amount of sales proceed in respect of unsold apartments (calculated as per 8,56,30,358 ASR multiplied to unsold area as on the date of certificate, to be calculated and certified by CA) as per Table C to this certificate 4 Estimated receivables of ongoing project. [Sum of 2+3(ii)] 13,63,15,381 5 (To be Filled for Ongoing Projects only) Amount to be deposited in Designated Account - 70% or 100% 9,54,20,767 IF 4 is greater than 1, then 70% of the balance receivables of ongoing project will be deposited in designated Account 95,42,077 IF 4 is lesser than 1, then 100% of the balance receivables of ongoing project will be deposited in designated Account This Certificate is being issued for RERA compliance for M/s Thakur Realtors Pvt Ltd (Project Thakur Emerald situated at ( Plot no 66 Sector 8 at Dapoli, Panvel Raigarh, 410206) and is based on the records and documents produced before me and explanations provided to me by the management of the Firm for the Period upto 30th September 2024. Table E Designated Bank Account Details Designated Bank Account Details Sr. No Particulars Actual Amount till Date (From start of Bank Account to till date) 1 Opening Balance 0.00 2 Deposits 52287809.00 3 Withdrawals 52287809.00 4 Closing Balance 0.00 Note: Total deposits in the designated bank account includes funds not related to collection from customers. I hereby certify that required proportion of money, as specified in the act, collected from allottees of the project unit as indicated in Table C has been deposited in Designated RERA Bank Account. I hereby certify that M/s. Thakur Realtors Pvt Ltd has utilized the required proportion of money, as specified in the act, collected from allottees for this project only for land and construction of this project. Table F Means of Finance Sr. Particulars Estimated* Proposed/Estimated Actual No. (At time of Registration) (As on the date of the (As on the date of (In Rs.) certificate) certificate) (Proposed and indicative) (in Rs.) (In Rs.) 1. Own Funds 12,65,98,770.00 12,65,98,770.00 4,41,36,886.00 Total Borrowed Funds (Secured) 2. - Drawdown availed till date - 0.00 Total Borrowed Funds (Unsecured) - 3. Drawdown availed till date - - 4. Customer Receipts used for Project 5,70,29,090.00 5,70,29,090.00 52287809.00 5. Total Funds for Project 18,36,27,860.00 18,36,27,860.00 9,64,24,695.00 6. Total Estimated Cost (as per Table A) 18,36,27,860.00 18,36,27,860.00 9,64,24,695.00 Table G Any Comments/Observations of CA 1 2 Yours faithfully, KSDT & Co Chartered Accountants Darshan Thakkar Membership No. 183079 FRN. 146983W UDIN: 26183079GTGYKL5746 Place: Mumbai For Thakur Realtors Pvt Ltd Director